General Info

Business Logo

Solicitations and notifications are free for this business.

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
DCP2117
DCP - Danvers State Hospital - Power Plant Demolition and Remediation, Danvers, MA. This Project is for remediation of hazardous materials and demolition of a boiler plant and ancillary structures, including the removal of an underground fuel storage tank and contaminated soils. The Category of Work is General Building Construction OR Demolition.
01/07/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
DCP1514 HC1 - Public Posting
Bryan Building - Mothball and Utility Separation, Worcester, MA. Bryan Building will be warm mothballed. This entails the separation of utilities, boarding up windows, abatement of ACM, removal of hazardous materials, removal of furniture, improvements to HVAC system, demolition of connector to adjacent building, and installation of boiler. Utility separation work includes coordination with NGRID, trenching, new ductbanks, and site restoration.
05/15/2017 06:00 PM UTC
SDW1501 DC2 - Public Posting
New Intake Site Preparation and Roadway, Worcester County Jail & House of Corrections, West Boylston, MA. This project includes installation of a new security fencing system and removal of the old fencing, new gates, road work to expand the existing access road to the site, rework of the facilities main pedestrian pathway and site preparation for the New Intake and Medical building to be completed under a subsequent contract. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
05/10/2017 06:00 PM UTC
DMH1301 DC1
Exterior Envelope Repair, Elevator and Generator Replacement, Solomon Carter Fuller Mental Health Facility, Boston, MA. Scope: Concrete exterior envelope repairs, existing window repairs and exterior sealant scope throughout; replacement (in phases) of the existing elevators with new elevators; replacement of the existing emergency generator with a new emergency generator.
04/20/2017 06:00 PM UTC
STC1701 FC1
Springfield Technical Community College, Building 13 and 17 Generator Replacement, Springfield, MA. Scope: Demolition of the existing generator and the gas main feeding it, installation of a new diesel generator with exhaust stack rising up from the building, creation of a new emergency electrical service entrance in buildings 13 and 17 and creation of new electrical shafts and electrical rooms in buildings 13 and 17.
04/14/2017 06:00 PM UTC
TRC0105 DC1
Request for Qualifications for Trade Contractors, Lowell Justice Center, Lowell, MA, for the following trades: Miscellaneous and Ornamental Iron (ECC $2,399,253); Waterproofing, Dampproofing and Caulking (ECC $134,000); Glass and Glazing (ECC $974,990); Lathing and Plastering (ECC $55,544); Tile (ECC $3,209,623); Acoustical Tile (ECC $2,630,885); Resilient Floors (ECC $428,174); Painting (ECC $885,144). SCOPE: The project consists of a new 266,523 GSF seven-story high rise structure (plus basement & mechanical penthouse) and associated site development of a 3.26 acre site.
04/13/2017 04:00 PM UTC
BSB1503 HC1
Request for Proposals for State House - Senate Chamber Renovations, Boston, MA
04/12/2017 06:00 PM UTC
DCP1532 FC1
Hurley Building Bathroom Renovations, Boston, MA. The project consists of the complete renovation of four (4) toilet rooms on 2 floors of the Charles F. Hurley Building. The toilet rooms to be renovated are the existing Men's and Women's rooms located on the 2nd and 3rd floors.
03/09/2017 07:00 PM UTC
TRC1214 HC1
TRC – Various Improvements/Renovations, Haverhill District Court, Haverhill, MA.
02/15/2017 07:00 PM UTC
HCC0801 DC2
2nd Request for Qualifications for Seven (7) Trade Packages: Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Tile; Acoustical Tile; Resilient Floors; Elevators; HVAC. Renovations to the Campus Center, Building G, Holyoke Community College, Holyoke, MA.
02/15/2017 05:00 PM UTC
POL1303 DC1,
RFQ for Construction Management Services, Massachusetts State Police Lower Basin Barracks Modernization and Expansion, Boston, MA. The project involves building renovation (14,000 sq ft), main entrance addition ( 4,000 sq ft) and demolition of adjacent existing garage.
02/02/2017 07:00 PM UTC
311 - 320 of 349 Solicitations
1 2 27 28 29 30 32 34 35