Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
DCP2117
DCP - Danvers State Hospital - Power Plant Demolition and Remediation, Danvers, MA. This Project is for remediation of hazardous materials and demolition of a boiler plant and ancillary structures, including the removal of an underground fuel storage tank and contaminated soils. The Category of Work is General Building Construction OR Demolition.
01/07/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
DOC2103
DOC - MCI Gardner - Ventilation System Upgrades, Gardner, MA. This Project is for modifications and upgrades to the existing ventilation system to meet the current requirements of the building code. Numerous upgrades to architectural, electrical, and structural systems are required to support the new mechanical equipment. Six new mechanical units will be required in the attic space. New steel dunnage will be constructed to support the new units. Three new units will be required in the basement, with new concrete areaways to provide fresh air to these units. This Project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Acoustical Tile; Painting; Fire Protection; HVAC; Electrical. The Category of Work is General Building Construction. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
04/10/2024 06:00 PM UTC
DPH2203
Electrical Upgrades, Lemuel Shattuck Hospital, Jamaica Plain, MA. This project is for electrical upgrades, with particular focus on upgrading and modernizing the existing essential electrical system, including materials and systems affected by these renovations. This Project includes the following Filed Sub-Bid: HVAC. The Category of Work is Electrical. Please see the SSI Attachment: Confidentiality Agreement on the main bid page. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
04/04/2024 06:00 PM UTC
DOC2003 Trade RFQ Scope Revisions
Request for Qualifications for Trade Contractors for Two (2) Trade Contractor Packages: HVAC - Scope Revisions ($5,598,000); Electrical - Scope Revisions ($5,730,000), for DOC - Plymouth MASAC - Section 35 Renovation, Plymouth, MA. This Project is for the transformation of the Massachusetts Alcohol and Substance Abuse Center facility into a therapeutic health care campus, with a primary focus on the three resident dorm buildings located on the upper campus, as well as accessibility improvements for patient access to buildings on the lower campus. A new warehouse building is also proposed.
04/03/2024 04:00 PM UTC
MMA2201 Elevator Trade RFQ 2nd Request
Request for Qualifications for One (1) Trade Contractor Package: Elevators - 2nd Request ($293,800), for MMA - Science, Technology and Engineering Lab Modernization, Buzzards Bay, MA. This project will include a new building with state-of-the-art teaching labs, support spaces and offices that will be relocated from other buildings, demolition of existing sheds, and renovation and repurposing of existing labs. Elevator work is expected to consist of furnishing and installation of a machine room-less electric traction passenger elevator for this new four-story building.
04/02/2024 04:00 PM UTC
SDW1801 Trade RFB
Request for Bids for Worcester County Jail & HOC - Warehouse Building #8 - Renovation, West Boylston, MA, for the following Trade Categories: Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Metal Windows; Acoustical Tile; Resilient Floors; Painting; Fire Protection Sprinkler System; Plumbing; HVAC; Electrical.
03/27/2024 04:00 PM UTC
DOC2103 Sub bids
DOC - MCI Gardner - Ventilation System Upgrades, Gardner, MA. This Project is for modifications and upgrades to the existing ventilation system to meet the current requirements of the building code. Numerous upgrades to architectural, electrical, and structural systems are required to support the new mechanical equipment. Six new mechanical units will be required in the attic space. New steel dunnage will be constructed to support the new units. Three new units will be required in the basement, with new concrete areaways to provide fresh air to these units. This Project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Acoustical Tile; Painting; Fire Protection; HVAC; Electrical. The Category of Work is General Building Construction. Please see the SSI Attachment: Confidentiality Agreement on the main bid page. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
03/26/2024 04:00 PM UTC
SDW1801 Trade RFQ Elevators 2nd Request
Request for Qualifications for Trade Contractors for One (1) Trade Contractor Package: Elevators – Second Request ($200,000), for Worcester County Jail & HOC - Warehouse Building #8 - Renovation, West Boylston, MA. This Project is for renovations to an existing two-story, 24,000 SF building. Elevator work includes demolition and removal off-site of existing freight elevator equipment, in-ground hydraulic jack/piston and bi-parting entrances; excluding the car frame, platform, channel frames, and car rails; and the installation of one new 5,000 lbs. in-ground hydraulic service elevator. The Construction Manager is Commodore Builders, LLC.
03/21/2024 04:00 PM UTC
DPH2203 Sub bids
Electrical Upgrades, Lemuel Shattuck Hospital, Jamaica Plain, MA. This project is for electrical upgrades, with particular focus on upgrading and modernizing the existing essential electrical system, including materials and systems affected by these renovations. This Project includes the following Filed Sub-Bid: HVAC. The Category of Work is Electrical. Please see the SSI Attachment: Confidentiality Agreement on the main bid page. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
03/18/2024 04:00 PM UTC
MIL2201 CM RFQ
Request for Qualifications for Construction Management at Risk Services for Joint Base Cape Cod, New Readiness Center, Bourne, MA. This Project is for a new 41,000 GSF Readiness Center building for the Massachusetts National Guard. The building will consist of an assembly hall, administration areas and classrooms, fitness area, locker room, shower rooms and a serving kitchen. A 6,000 SF unheated storage may or may not be attached, and an exterior flammable materials storage area will also be included.
03/08/2024 07:00 PM UTC
MMA2201 Elevator Trade RFQ
Request for Qualifications for One (1) Trade Contractor Package: Elevators ($293,800), for MMA - Science, Technology and Engineering Lab Modernization, Buzzards Bay, MA. This project will include a new building with state-of-the-art teaching labs, support spaces and offices that will be relocated from other buildings, demolition of existing sheds, and renovation and repurposing of existing labs. Elevator work is expected to consist of furnishing and installation of a machine room-less electric traction passenger elevator for this new four-story building.
03/04/2024 05:00 PM UTC
51 - 60 of 349 Solicitations
1 2 3 4 6 8 9 10 34 35