General Info

Business Logo

Los Angeles County Public Works

900 S Fremont Ave, Alhambra, CA 91803-1331
(626) 221-6227

Los Angeles County Public Works is one of the largest municipal public works agencies in the United States, providing vital 21st Century infrastructure and essential services to more than 10 million people across a 4,000-square-mile regional service area.

The agency is among 48 County departments and agencies working collaboratively across public, private, and nonprofit sectors to improve the quality of life for the people and communities of LA County.

With a Vision to become the most trusted public agency in the region, Public Works is defined by its responsiveness to the public, customer service excellence, and drive to build positive community relations. The Public Works workforce takes pride in being committed public servants providing essential and critical services for all residents and businesses in LA County.

Public Works’ operations are defined within five core service areas: Water Resources, Transportation, Environmental Services, Municipal Services, and Construction Management. Its annual budget of over $4.4 billion is funded by restricted revenues, such as gas tax, benefit assessment, water and sewer sales, user fees, and other revenues. The agency also manages sustainable water, transportation, and waste management infrastructure, including over 130 active capital projects with a construction value of over $3.3 billion. Public Works is strategically focused on advancing economic development through innovative strategies and business-friendly contracting opportunities to serve the County’s small business and local worker hiring objectives.

In Fiscal Year 2020-21, Public Works awarded over $1 billion worth of contracts, which helped create 12,394 jobs. The agency’s diverse workforce is comprised of approximately 4,000 employees in nearly 500 job classifications, including professional, technical, clerical, and skilled crafts.

Headquartered at 900 South Fremont Avenue in Alhambra, Public Works has 77 field facilities throughout LA County.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
TSM0010463 Norwalk Bl - San Antonio Dr-Pioneer Bl TSSP-Bev Bl to Carson St
Implement traffic signal improvements to include the installation of signal and lighting standards, mast arms, vehicle and pedestrian heads, vehicle and pedestrian detection, and other traffic signal related equipment. Traffic Signal Synchronization Program - 55 intersections along Norwalk Boulevard / San Antonio Drive / Pioneer Boulevard Traffic Signal Synchronization Project from Beverly Boulevard To Carson Street
12/30/2025 07:00 PM UTC
FCC0001401 B1 0107 Channel Invert Repair and East Canyon Channel Wall Replacement
Repair concrete trapezoidal channel invert and a concrete rectangular channel side wall and bracing of splitter wall.
01/13/2026 07:00 PM UTC
RDC0015749 The Old Road over Santa Clara River and SPT CO Bridge et al Phase I
Bridge Replacement, Road Construction, and Multiuse Trail
01/13/2026 07:00 PM UTC
BRC0000583
On-Call Light Emitting Diode Streetlight Maintenance Services (BRC0000583) PLEASE CHECK THE WEBSITE FREQUENTLY FOR ANY CHANGES TO THIS SOLICITATION. ALL ADDENDA AND INFORMATIONAL UPDATES WILL BE POSTED AT http://pw.lacounty.gov/brcd/servicecontracts
01/21/2026 01:30 AM UTC
BRC0000489 - Re-Open, Open Continuous
On-Call Community-Based Organization Services Program (Re-Open) Please note that this is re-opening of the Request for Statement Qualifications (RFSQ) by the same name that was posted in January 2025. This RFSQ will remain open continuous until further notice. PLEASE CHECK THE WEBSITE FREQUENTLY FOR ANY CHANGES TO THIS SOLICITATION. ALL ADDENDA AND INFORMATIONAL UPDATES WILL BE POSTED AT http://pw.lacounty.gov/brcd/servicecontracts
01/01/2031 01:30 AM UTC
5 Solicitations

Closed Solicitations

Number Deadline
AED7740029 - Project Controls and Support Services for Harbor-UCLA Medical Center Master Plan Implementation Project
The goal of the County is to develop the campus into a coherent, interactive relationship between the clinical, educational, and research components of HUCLA based on the Master Plan.
05/18/2017 12:00 AM UTC
RDC0016047: East Los Angeles Community Safe Routes to School
Construction of curb and gutter, sidewalk, curb ramps, and asphalt concrete pavement on base material; installation of striping and pavement markings and traffic circle; and the performance of other appurtenant work.
05/16/2017 06:00 PM UTC
RDC0015831 - Bridge Preventive Maintenance Program - Group 5
Preparation of bridge decks, including the removal of deck surfaces; treatment with liquid sealing agent and application of polyester concrete overlays; the replacement of joint seals; spall repairs; and the performance of other incidental and appurtenant work for 18 existing bridges.
05/16/2017 06:00 PM UTC
RDC0015968 - Mureau Road at Mountain View Drive Landscaped Median Retrofit
Construction of median landscaping, an irrigation system, unit pavers, a river-rock lined retention basin, and the performance of other appurtenant work.
05/16/2017 06:00 PM UTC
AED7740053 - Waste Characterization Study for Los Angeles County Unincorporated Areas
Consultant shall conduct a 12-month waste characterization study for the unincorporated areas of Los Angeles County.
05/03/2017 06:00 PM UTC
RDC0015822 - Bridge Preventive Maintenance Program - Group 4 Cities
Bridge Preventive Maintenance Program for various bridges in Long Beach and West Lake Village
04/18/2017 06:00 PM UTC
SMDACO0146 - Sewer Rehabilitation Project No. 15
Cleaning, video inspection, and lining of approximately 22,132 linear feet of existing sanitary sewers and the performance of other appurtenant work.
04/18/2017 06:00 PM UTC
RDC0016046 - Florence-Firestone Community Safe Routes To School
Modification of traffic signals; construction of asphalt concrete pavement on base material, curb and gutter, sidewalks, curb ramps, and driveways; installation of striping and pavement markings, and bike racks; and the performance of other appurtenant work.
04/18/2017 06:00 PM UTC
FCC0001254 - Belmont Shore Pump Station (Mechanical and Electrical Rehabilitation)
Removal of existing pumps and appurtenances; furnishing and installation of two, 30-inch pumps with 200 horsepower electric motors and two, 42-inch pumps with 350 horsepower electric motors; instrumentation; electrical work; and the performance of other appurtenant work.
03/21/2017 06:00 PM UTC
FCC0001267: Puddingstone and Marshall Canyon Channels Trench Settlement Repair
Reconstruction of 160 linear feet of roadway along Arrow Highway.
03/21/2017 06:00 PM UTC
861 - 870 of 878 Solicitations
1 2 80 81 82 83 84 85 87