England Economic and Industrial Development District
1611 Anold Drive, Alexandria, LA 71303
(318) 449-3504
1611 Anold Drive, Alexandria, LA 71303
(318) 449-3504
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Rehabilitation of Runway and Taxiway Safety Areas
The project consists of the Rehabilitation of Runway and Taxiway Safety Areas.
| 06/09/2020 07:00 PM UTC |
MILL AND OVERLAY THE SOUTH END OF RUNWAY 18-36
The project consists of the removal of existing asphaltic concrete pavement and the installation of new asphaltic concrete pavement, pavement markings, emulsified asphalt seal coat, cement treated subgrade, etc.
| 04/11/2019 07:00 PM UTC |
EMERGENCY ACCESS POINTS REHABILITATION
Emergency Access Points Rehabilitation
| 11/14/2018 08:00 PM UTC |
England Airpark New Community Center (15)
The project is designed as a single-story steel framed structure which will replace the existing Community Center constructed circa, 1958. The Owner under a separate contract will demolish the existing structure, so that work can begin on the site for new construction. The building is designed around a single large multi-purpose room and includes an entrance lobby and main corridor. Support areas include a warming kitchen with minimum but basic kitchen equipment included as part of the Base Bid. The Owner will outfit the warming kitchen with additional items of equipment. Bathrooms are designed to accommodate the visitors when the facility is at its maximum capacity. Outdoor use areas are shaded with low roof framing and canopies.
| 08/14/2018 07:00 PM UTC |
EMERGENCY ACCESS ROAD IMPROVEMENTS - PHASE 1 (INSTALL PERIMETER FENCING NOT REQUIRED BY 49-CFR 1542)
The scope of work for this Project includes the installation of approximately 17,500 L.F. of 8’ chain link wildlife exclusion fence, with a continuous PCC maintenance pad and footing, automatic cantilever slide gates, swing gates, storm drain pipes with wildlife exclusion end treatments, demolition of approximately 19,600 L.F. of existing fence and the construction of approximately 500 L.F. of a 18’ wide asphaltic concrete surface access road.
| 05/22/2018 07:00 PM UTC |
DEMOLITION # 12 BID OPENING EXTENSION
Demolition and Removal of Eight (8) Structures In The Designated Noise Mitigation Area At Alexandria International Airport
| 10/25/2017 07:00 PM UTC |
DEMOLITION # 12
Demolition and Removal of Eight (8) Structures In The Designated Noise Mitigation Area At Alexandria International Airport.
| 10/10/2017 07:00 PM UTC |
Alexandria International Airport - North Airport Emergency Access
The scope of work for this Project includes the demolition of the existing and construction of a new bridge on Harold Miles Park Road, reconstruction of Harold Miles Park Road, relocation of utilities, construction of a new Airfield Connector Road and segment of the Airfield Perimeter Road at Alexandria International Airport (Approximately 21,000 S.Y. of 8” Portland Cement Concrete Pavement).
| 06/21/2017 07:00 PM UTC |
Alexandria International Airport - Consolidated Rental Car Facility - Phase 2
The scope of work for this Project includes the construction of a new Consolidated Rental Car Facility to provide cleaning, maintenance, and refueling services to the rental car companies serving the Airpark. The scope also includes a Fleet Storage Lot sized to accommodate 120 vehicles with circulation drives, associated site lighting, security and communication features, and perimeter fencing. The new facility will be located on the newly constructed H.K. Stanley Blvd.
| 06/15/2017 07:00 PM UTC |
VANDENBURG BRIDGE MAINTENANCE REPAIRS
Various concrete repairs. concrete deck joint cleaning and sealing, and other work on the Vandenburg Bridge.
| 08/30/2016 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.