Saint Louis County
4787 Midway Rd., Duluth, MN 55811
(218) 625-3830
4787 Midway Rd., Duluth, MN 55811
(218) 625-3830
Name * | Description | |
---|---|---|
Watch Electronic Bid Openings Live (61.9 KB) |
Instructions to view electronic bid openings live
| |
Number | Deadline |
---|---|
Number | Deadline |
---|---|
CP 0000-458863
6” Wet Reflective Edgeline
| 01/19/2023 04:00 PM UTC |
CP 0014-376295
Grading, Bituminous Surfacing, Sidewalk, and ADA Pedestrian Improvements
| 12/22/2022 04:00 PM UTC |
CP 0038-368339
Construct Bridge 69L07 (County Bridge 12) and Approaches over French River, 13.8 Miles Northwest of Duluth, MN
| 12/08/2022 04:00 PM UTC |
CP 0020-398242
Multiple Projects - Mill Bituminous Surface, Bituminous Pavement Reclamation, Aggregate Base Stabilization, Plant Mixed Bituminous Surface, Aggregate Base Class 5, and Aggregate Surfacing Class 5
| 12/08/2022 04:00 PM UTC |
CP 0004-398241
Bituminous Pavement Reclamation, Bituminous Paving, Aggregate Surfacing, Base Stabilization
| 12/01/2022 04:00 PM UTC |
CP 7992-398713
Construct Bridge 69A78 (County Bridge 777) and Approaches
| 10/27/2022 03:00 PM UTC |
CP 0061-726163 QUOTE (RFQ)
QUOTE - Temporary Reinforced Soil Slope and Repair Culvert Ends, 12.5 Miles SW of Two Harbors, MN
| 10/03/2022 03:00 PM UTC |
CP 0000-519875
Clearing, Grubbing, Grading, Aggregate Placement, Bridges, Boardwalk, and Culverts
| 09/15/2022 03:00 PM UTC |
CP 0101-235499
Construct Bridge 69L03 (County Bridge 500) and Approaches Over East Two River and Within the City Limits of Mountain Iron, MN
| 05/26/2022 03:00 PM UTC |
CP 0005-557171
W-Beam Guardrail
| 05/05/2022 03:00 PM UTC |