General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
General Landscaping Services
The proposed work consists of professional grounds maintenance activities for City-owned parcels, including greens, associated landscape beds and gardens, and restorative landscaping for City public improvements. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
11/12/2026 03:00 PM UTC
48" Storm Culvert Addition & New Box Culvert (SR 303 to Existing Box Culvert at Rosewood Grill)
The proposed work consists of the removal and replacement of an existing box culvert with a 4’x6’ precast concrete box culvert below E. Streetsboro Street (SR 303), the installation of 230 LF of 48” HDPP storm pipe parallel to an existing 48” concrete pipe between the commercial parking lot of #36 and #46 E. Streetsboro Street, the replacement/relocation of an existing 12” cast iron water main underneath the new 4’x6’ box culvert, existing storm tie-ins into the new storm system, and roadway and parking lot restoration in the City of Hudson, Ohio.
11/17/2026 02:30 PM UTC
Police Station Parking Lot Expansion
The proposed work consists of expanding the asphalt parking lot, grading, pavement striping, storm improvements, and restoration at the existing Hudson Police Department parking lot located at 36 S. Oviatt Street. In addition, this project also includes the installation of an access drive at the south side of the proposed parking lot improvements and related grading work in the City of Hudson, Ohio.
11/24/2026 03:30 PM UTC
Willow Lake Drainage Improvements, Phase 2
This project includes the installation of a new 30" RCP and HDPP storm sewer, storm sewer manholes, catch basins and all other appurtenances necessary to construct the new storm sewer system, earthwork and grading necessary to construct a new ditch and expand an existing stormwater pond, pavement replacement including roadway, sidewalk, curb and trail and all necessary restoration in the City of Hudson, Ohio.
12/01/2026 02:30 PM UTC
Ellsworth Meadows Golf Course Hole 17 Retaining Wall Installation, Phase 2
The proposed work consists of the addition of approximately 620 linear feet of retaining wall along the easts side of hole 17 at Ellsworth Meadows Golf Course located at 1101 Barlow Road in the City of Hudson, Ohio.
12/01/2026 03:00 PM UTC
Printing and Mailing Services for Resident Newsletter
The proposed work consists of the printing, sorting and mailing of six (6) issues of the resident newsletter over a twelve (12) month period, with an option to renew for one (1) additional year, in accordance with detailed specifications as outlined by the Communications Department and in accordance with the specifications on file.
12/03/2026 03:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
Eastside Substation Transformer Replacement Project - three (3) 7.62KV Distribution Voltage Regulators
The proposed work consists of furnishing the following material and equipment for three (3) 7.62KV Distribution Voltage Regulators for the Eastside Substation Transformer Replacement Project in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of Kevin Powell, Assistant Public Works Director.
03/15/2022 02:30 PM UTC
Barlow Community Center Dam Improvements (re-bid)
The proposed work consists of improvements at two lakes (upper and lower) and dams located at the Barlow Community Center, 41 S. Oviatt Street, Hudson, Ohio. The project is being funded by the Northeast Ohio Regional Sewer District (NEORSD) and the City of Hudson. Both the upper and lower lake’s dams are classified as Ohio Department of Natural Resources (ODNR) Class II Dams. Consequently, all dam work shall be done in compliance with ODNR Division of Dam Safety policies and procedures as outlined on the improvement plans and specifications. Improvements at the upper lake include excavation to provide additional storm water storage, upgrades to the existing dam’s emergency spillway and modifications to the dam’s primary outlet and auxiliary valve system. Upgrades to the lower lake include the construction of a new dam to be located within the footprint of the existing lake, dredging of a portion of the lower lake and modifications to the primary outlet and auxiliary valve system. Upon completion of the mass grading and dam improvement work, existing asphalt walking trails and disturbed grass areas will be restored, and new trees planted. All work shall be in accordance with the specifications which are on file in the office of the City Engineer.
03/15/2022 02:00 PM UTC
E. Streetsboro Water Lateral Replacement
The proposed work consists of replacing six (6) water laterals on E. Streetsboro (SR 303) and grout filling an existing 4” cast iron water main between E. Main Street and College Street. Project also includes drive apron replacement, sidewalk replacement, pavement patching and restoration in the City of Hudson, Ohio.
03/15/2022 01:30 PM UTC
Eastside Substation Transformer Replacement Project - One (1) 67/12.47 KV Power Transformer
The proposed work consists of furnishing the following material and equipment for one (1) 67/12.47 kV Power Transformer for the Eastside Substation Transformer Replacement Project in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of Kevin Powell, Assistant Public Works Director.
03/08/2022 03:00 PM UTC
Headstone Restoration Project (rebid)
The proposed work consists of the structural repair and preservation of approximately 158 cemetery headstones that are in various states of damage and disrepair. The construction to properly make physical repairs, level and reset, clean and apply preservation methods to each headstone will follow industry standards as detailed in the scope of work. Contractor shall furnish all supplies and equipment needed to perform this work. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
02/15/2022 03:00 PM UTC
2022 Concrete Replacement and Catch Basin Repair Program
The proposed work consists of sidewalk replacement, handicap ramp installation, curb replacement, and catch basin repairs at various locations in the City of Hudson, Ohio.
02/15/2022 02:30 PM UTC
2022 Asphalt Resurfacing and Patching Program
The proposed work consists of the repair and resurfacing, with asphaltic concrete, of various streets and city-owned properties, as well as asphalt patching of various streets and city-owned properties in the City of Hudson, Ohio.
01/25/2022 02:30 PM UTC
Roslyn Avenue & E. Streetsboro Street Crosswalk Enhancements
The proposed work consists of crosswalk enhancements including installation of rectangular rapid flashing beacons at the intersection of E. Streetsboro Street (SR 303) and Roslyn Avenue in the City of Hudson, Ohio.
12/21/2021 03:00 PM UTC
S. Darrow Road Sidewalk Improvement Project
The proposed work consists of the construction of approximately 3,211 LF of five (5) foot and six (6) foot wide class C concrete sidewalk, a five (5) foot bike lane, storm improvements and curb along Darrow Road (SR 91) between Corporate Drive and Norton Road. The project also includes all signage, drives, necessary grading, storm pipe, landscaping, pavement repairs and restoration in the City of Hudson, Ohio.
12/21/2021 02:30 PM UTC
Barlow Community Center Dam Improvements
The proposed work consists of improvements at two lakes (upper and lower) and dams located at the Barlow Community Center, 41 S. Oviatt Street, Hudson, Ohio. The project is being funded by the Northeast Ohio Regional Sewer District (NEORSD) and the City of Hudson. Both the upper and lower lake’s dams are classified as Ohio Department of Natural Resources (ODNR) Class II Dams. Consequently, all dam work shall be done in compliance with ODNR Division of Dam Safety policies and procedures as outlined on the improvement plans and specifications. Improvements at the upper lake include excavation to provide additional storm water storage, upgrades to the existing dam’s emergency spillway and modifications to the dam’s primary outlet and auxiliary valve system. Upgrades to the lower lake include the construction of a new dam to be located within the footprint of the existing lake, dredging of a portion of the lower lake and modifications to the primary outlet and auxiliary valve system. Upon completion of the mass grading and dam improvement work, existing asphalt walking trails and disturbed grass areas will be restored, and new trees planted. All work shall be in accordance with the specifications which are on file in the office of the City Engineer.
11/30/2021 02:30 PM UTC
171 - 180 of 321 Solicitations
1 2 … 14 15 16 18 20 21 22 … 32 33