General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
General Landscaping Services
The proposed work consists of professional grounds maintenance activities for City-owned parcels, including greens, associated landscape beds and gardens, and restorative landscaping for City public improvements. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
11/12/2026 03:00 PM UTC
48" Storm Culvert Addition & New Box Culvert (SR 303 to Existing Box Culvert at Rosewood Grill)
The proposed work consists of the removal and replacement of an existing box culvert with a 4’x6’ precast concrete box culvert below E. Streetsboro Street (SR 303), the installation of 230 LF of 48” HDPP storm pipe parallel to an existing 48” concrete pipe between the commercial parking lot of #36 and #46 E. Streetsboro Street, the replacement/relocation of an existing 12” cast iron water main underneath the new 4’x6’ box culvert, existing storm tie-ins into the new storm system, and roadway and parking lot restoration in the City of Hudson, Ohio.
11/17/2026 02:30 PM UTC
Police Station Parking Lot Expansion
The proposed work consists of expanding the asphalt parking lot, grading, pavement striping, storm improvements, and restoration at the existing Hudson Police Department parking lot located at 36 S. Oviatt Street. In addition, this project also includes the installation of an access drive at the south side of the proposed parking lot improvements and related grading work in the City of Hudson, Ohio.
11/24/2026 03:30 PM UTC
Willow Lake Drainage Improvements, Phase 2
This project includes the installation of a new 30" RCP and HDPP storm sewer, storm sewer manholes, catch basins and all other appurtenances necessary to construct the new storm sewer system, earthwork and grading necessary to construct a new ditch and expand an existing stormwater pond, pavement replacement including roadway, sidewalk, curb and trail and all necessary restoration in the City of Hudson, Ohio.
12/01/2026 02:30 PM UTC
Ellsworth Meadows Golf Course Hole 17 Retaining Wall Installation, Phase 2
The proposed work consists of the addition of approximately 620 linear feet of retaining wall along the easts side of hole 17 at Ellsworth Meadows Golf Course located at 1101 Barlow Road in the City of Hudson, Ohio.
12/01/2026 03:00 PM UTC
Printing and Mailing Services for Resident Newsletter
The proposed work consists of the printing, sorting and mailing of six (6) issues of the resident newsletter over a twelve (12) month period, with an option to renew for one (1) additional year, in accordance with detailed specifications as outlined by the Communications Department and in accordance with the specifications on file.
12/03/2026 03:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
SR 91 North Turn Lane Improvement Project (PID 93822)
The proposed work consists of the installation of roadway shoulder, storm sewer, lighting improvements, new 8-foot pedestrian sidewalk, two 12-foot through lanes, new 11-foot turn lanes on Valley View, Herrick Park Drive, and Hines Hill Road intersections, 5-foot bike lanes on both sides of the road and a drainage/water quality swale on the west side of the road, and resurfacing approximately 1.24 miles of SR 91 from Brandywine Drive to Middleton Road in the City of Hudson, Ohio.
05/12/2020 01:00 PM UTC
2020 Line Striping and Painting Program
The proposed work consists of the application of reflectorized pavement marking and striping on certain streets and on various City owned properties in the City of Hudson, Ohio.
04/21/2020 02:00 PM UTC
Preventative Maintenance and Relay Testing at the Eastside Substation
The proposed work consists of preventative maintenance and relay testing at the Eastside Substation per lump sum for the service in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
04/08/2020 01:00 PM UTC
College Street and Hudson Street Pedestrian Signal Pole Procurement
The purchase will consist of the purchase of eight (8) rectangular flashing beacon (RRFB) pedestal shafts and bases. The RRFB’s will mount on a standard 4.5-inch OD aluminum pedestal pole with breakaway transformer base. A fourteen (14) foot pole shale be provided. Pole and base manufacturer shall be listed on ODOT’s Qualified Products List. The pole, base, and all exposed hardware shall be painted “matte” black in accordance with the specifications contained herein. The poles and bases shall meet the requirements set forth in ODOT Standard Construction Drawings TC-83.20 and HL-10.13. Equipment to be stored by Supplier until requested for delivery to the College Street and Hudson Street Crosswalk Enhancement Project.
04/01/2020 02:00 PM UTC
2020 Storm Sewer Lining Project
The proposed work consists of, but is not limited to the installation of 18 inch, 21 inch and 24 inch cured-in-place storm sewer lining at various locations in the City of Hudson, Ohio.
03/31/2020 02:00 PM UTC
2020 Crack Sealing Program
The proposed work consists of the installation of rubberized crack sealer on certain City streets and City owned properties in the City of Hudson, Ohio.
03/31/2020 01:30 PM UTC
2020 Public Properties and ROW Maintenance
The proposed work consists of mowing and maintenance services for Public Properties and R.O.W. Maintenance. The services included in this bid are for the following tasks: mowing, trimming, Fall and Spring cleanup and fertilization, Contractor shall furnish all equipment, personnel and materials as required to perform work. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
03/12/2020 02:00 PM UTC
2020 Ellsworth Meadows Golf Course Pump Station Construction Panel Construction REBID
The proposed work consists of installation of pump station control panel construction at the Ellsworth Meadows Golf course in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the City Public Works Department.
03/04/2020 02:00 PM UTC
2020 Barlow Farm Park Baseball Infields Renovation
The proposed work consists of renovation of the infields at Barlow Farm Park in the City of Hudson. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
02/27/2020 02:00 PM UTC
2020 Ellsworth Meadows Golf Course Drainage Project
The proposed work consists of installation of drainage system at the Ellsworth Meadows Golf course in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the City Public Works Department.
02/19/2020 03:00 PM UTC
221 - 230 of 321 Solicitations
1 2 … 19 20 21 23 25 26 27 … 32 33