General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2026-2027 Residential Driveway Plowing Program
The proposed work consists of snow plowing services of residential driveways (and possible alternates involving snow clearing and salt application) to assist seniors and adults with disabilities within the City of Hudson, Ohio. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
09/23/2026 02:00 PM UTC
Preventative Maintenance & Relay Testing of the College Street Substation and RAMCO (Rebid)
The proposed work consists of preventative maintenance and relay testing at the College Street Substation and RAMCO in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
09/24/2026 02:00 PM UTC
Hudson City Hall Water Service Line Replacement (re-bid)
The proposed work consists of installing a new ductile iron water service line to supply water to Hudson City Hall, located at 1140 Terex Road in Hudson, Ohio. The overall project is divided into two phases: Phase 1 convers the interior water riser and backflow preventer installation, while Phase 2 focuses on the exterior waterline service replacement. This specific bid is for the Phase 2 work, which includes installing approximately 290 linear fee of new 6-inch ductile iron water line and related appurtenances from Terex Road to Hudson City Hall. It also requires disconnecting the existing service from Akron Water on Hudson Drive. All work must be completed in accordance with the specifications.
09/29/2026 01:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
2018 Line Striping and Painting Program
The proposed work consists of the application of reflectorized pavement marking and striping on certain streets and on various City owned properties in the City of Hudson, Ohio.
03/13/2018 01:30 PM UTC
Paving of Various Drives/Pathways/Trails
The proposed work consists of the resurfacing and repairs with asphaltic concrete of various drives within Markille-St. Mary’s Cemetery, water tower drive on Milford Road, installation of new walking trails at Ellsworth Meadows Golf Course, and the installation of a new trail at Oak Grove Park in the City of Hudson, Ohio.
03/07/2018 02:30 PM UTC
Substation Preventative Maintenance and Relay Testing for Seasons Rd. Substation
The proposed work consists of service of preventative maintenance, relay testing at the Seasons Road Substation and oil analysis and thermal graphic scan at other substations on City owned property listed in this document in the City of Hudson, Ohio.
03/01/2018 03:00 PM UTC
2018 Crack Sealing Program
The proposed work consists of the installation of rubberized crack sealer on certain City streets and City owned properties in the City of Hudson, Ohio.
02/27/2018 02:30 PM UTC
Hudson Salt Storage & Bus Maintenance Garage Facility
The proposed work consists of the construction of an approximate 9,900 square foot school bus garage building to include 4 pull through service bays, service storage areas with office and restroom/locker-shower areas, service mezzanine storage area, meeting/break area to accommodate 72 occupants, dispatch area, training room, restrooms, and mechanical space and the construction of an approximate 9,800 square foot salt storage facility that will store approximately 4,000 tons of salt, 10,000 gallons of brine and includes a small single person restroom and utility room, 4 parking spaces, and circulation pavement. Work also includes storm water quality and quantity management, security fencing and gates, site lighting, and buffer landscaping. The buildings will be located at 5778 Hudson Drive in the City of Hudson, Ohio.
02/06/2018 03:00 PM UTC
2018 Concrete Replacement Program
The proposed work consists of the removal and replacement of sections of concrete streets, joint repairs, and sidewalk replacement at various locations in the City of Hudson, Ohio.
02/06/2018 02:30 PM UTC
Valley View Road Culvert Replacement Project
The proposed work consists of the removal of a 3 foot by 5 foot stone/concrete box culvert and the installation of a new precast concrete 43 inch by 68 inch elliptical culvert on Valley View Road in the City of Hudson, Ohio.
12/19/2017 02:30 PM UTC
2018 Asphalt Resurfacing Program
The proposed work consists of the resurfacing and repairs with asphaltic concrete of various streets and city owned properties and asphalt overlay of concrete streets in the City of Hudson, Ohio
12/05/2017 03:00 PM UTC
2018 Guardrail Replacement Program
The proposed work consists of the replacement of guardrail in various places throughout the City of Hudson, Ohio.
12/05/2017 02:30 PM UTC
Manor Drive Waterline and Storm Sewer Installation - Rebid
The proposed work consists of the replacement of the existing 6" waterline with a new 8" waterline on Manor Drive from E. Streetsboro Street, approximately 1,540 feet south to the cul-de-sac, and the replacement of the storm sewer system with approximately 1,353 feet of storm sewer and inlets. Work also includes new storm collector pipes and connections to residential downspouts and sump pump drains, curb replacement and driveway apron replacement along Manor Drive in the City of Hudson.
11/14/2017 02:30 PM UTC
281 - 290 of 316 Solicitations
1 2 24 25 26 27 29 31 32