City of Hudson, OH
1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770
www.hudson.oh.us
1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770
www.hudson.oh.us
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Ellsworth Golf Course - Hole 17 Retaining Wall - REBID
The proposed work consists of the addition of a retaining wall at a pond alongside the east side of hole 7 at Ellsworth Meadows Golf Course in the City of Hudson, Ohio.
| 01/07/2025 03:30 PM UTC |
Number | Deadline |
---|---|
Ellsworth Meadows Golf Course Clubhouse
The proposed work consists of the furnishing of material, equipment, and labor necessary for complete construction of a new single story golf clubhouse, including kitchen, dining, pro-shop and golf simulator area for Ellsworth Meadows Golf Club in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
| 04/16/2024 02:00 PM UTC |
Adaptive Traffic Signal System (PID 116924)
The proposed work consists of the furnishing and construction of an Adaptive Traffic Signal System at sixteen (16) signalized intersections along SR 91 and SR 303. All upgraded intersections shall be interconnected through a connection to the City's Broadband Fiber Network.
| 04/16/2024 01:30 PM UTC |
Mitigation and Demolition of the 94 Owen Brown Street Building Project
The proposed work consists of the furnishing of material, equipment, and labor necessary for the complete demolition of the vacant building located at 94 Owen Brown Street in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department. The work also includes the removal of all existing pavement and concrete, subgrade structures such as building footers and conduits and final site grading as per the specifications and drawings produced for the project. Demolition work also includes the abatement and removal of asbestos and regulated materials also identified in the specifications.
| 03/19/2024 02:00 PM UTC |
City of Hudson City Hall Roof Repairs Project
The proposed work consists of limited demolition to include removal of wall vents, siding, and flashing, as well as installation of new sheathing, blocking, metal siding, and roof ridge vents for the City Hall building, located at 1140 Terex Road in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
| 03/12/2024 02:00 PM UTC |
Bunker Renovation Project (Re-bid)
The proposed work consists of the furnishing of all necessary labor, supervision, tools, and equipment (all materials furnished by OWNER and provided to the CONTRACTOR) to complete renovation of the bunker system (as specified) at the Ellsworth Meadows Golf Club course in the City of Hudson, Ohio, in accordance with plan drawings and specifications which are on file in the office of the Public Works Department.
| 03/05/2024 03:30 PM UTC |
Preventative Maintenance & Relay Testing of the South Main Substation
The proposed work consists of preventative maintenance and relay testing at the South Main Substation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
| 03/05/2024 03:00 PM UTC |
East and West Case Waterline Replacement Project
The proposed work consists of the installation of approximately 850 LF of new 8” watermain and its appurtenances along E. Case Drive between W. Streetsboro Street and Milford Drive and the installation of approximately 1,745 LF of new 8” watermain and its appurtenances along West Case Drive between SR 303 and Lynn Drive. Project also includes new house services, cutting and capping of the old watermain and restoration in the City of Hudson, Ohio.
| 02/20/2024 02:30 PM UTC |
Valley View Road Resurfacing (PID 116932)
The proposed work consists of the resurfacing of Valley View Road from the North Corporation Line, southeast to SR 91 in the City of Hudson, Ohio.
| 02/13/2024 02:30 PM UTC |
2024 Asphalt Resurfacing and Patching Program
The proposed work consists of the repair and resurfacing, with asphaltic concrete, of various streets and city-owned properties and asphalt patching of various streets and city-owned properties in the City of Hudson, Ohio.
| 02/06/2024 03:30 PM UTC |
Bunker Renovation Project
The proposed work consists of the furnishing of all necessary labor, supervision, tools, and equipment (all materials furnished by OWNER and provided to the CONTRACTOR) to complete renovation of the bunker system (as specified) at the Ellsworth Meadows Golf Club course in the City of Hudson, Ohio, in accordance with plan drawings and specifications which are on file in the office of the Public Works Department.
| 02/06/2024 03:00 PM UTC |