Ohio Department of Developmental Disabilities

Columbus Developmental Center 1601 W. Broad Street, Columbus, OH 43215
(614) 466-1419


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
DDD-250017
Consists of turning one large bedroom into 2 bedrooms, some internal systems will need reworked
04/04/2025 06:30 PM UTC
DMR230010
Project includes Removing and replacing numerous shingled roofs at the Southwest Ohio Developmental Center
03/04/2025 07:30 PM UTC
DMR230012
Project includes installing numerous feet of wrought iron fence and 2 electrical gates on campus
08/08/2024 06:00 PM UTC
DMR230005
Project consists of removing and replacing multiple shingled roofs.
08/02/2024 06:00 PM UTC
DMR230003
Current generators are original equipment and are small and updated, each house currently has a generator that runs 1/3 of the facility when under backup power. This project will upgrade these small generators and add capability.
05/30/2024 06:00 PM UTC
DMR230008
Project includes Repairing of interior drains and replacement of flooring in residential buildings
05/30/2024 06:00 PM UTC
DMR230003
Current generators are original equipment and are small and updated, each house currently has a generator that runs 1/3 of the facility when under backup power. This project will upgrade these small generators and add capability.
05/23/2024 06:00 PM UTC
DMR230004
HVAC upgrades at the Willow Works and Maintenance Buildings at the Mount Vernon Developmental Center
02/05/2024 07:00 PM UTC
DMR-230011
Project includes asphalt shingle and underlayment replacement and portion of TPO roof recover at the PH&E building at Mt.Vernon Developmental Center. Work shall include replacement of gutters, downspouts, and all associated flashings.
12/01/2023 06:30 PM UTC
DMR 230007 Warrensville MS_Resident Roof Replacements
Work includes roofing replacements at multiple buildings at Warrensville Developmental Center. Work at MS building consists of complete removal of existing built-up roofing system and installation of EPDM roof complete with flashings and coping replacement. Work at 9 housing units and administration building includes removal of existing asphalt shingle roofs and installation of metal panel system at single story mansard roof conditions.
11/20/2023 06:00 PM UTC