Clinton County Engineer's Office
1326 Fife Ave, Wilmington, OH 45177
(937) 382-2078
1326 Fife Ave, Wilmington, OH 45177
(937) 382-2078
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
2024 Clinton County Pavement Marking
Centerline and edgeline striping of various County and Township roads in Clinton County, Ohio with ODOT Item 642 striping. Approx. 46.826 miles of centerline and 81.452 miles of edgeline on County roads with additional mileage on Township roads possible.
| 09/18/2024 02:00 PM UTC |
CLI-CR-15-5.78 GURNEYVILLE RD BRIDGE REHABILIATION (OPWC CJ28AA)
Remove, replace, and widen existing superstructure of bridge CLI-CR-15-5.78 SFN 1432125. Project includes new bridge railings and minimal approach and site work.
| 09/18/2024 02:00 PM UTC |
Number | Deadline |
---|---|
2020 PAVEMENT MARKING
Centerline and edgeline striping of various County and Township roads in Clinton County, Ohio with ODOT Item 642 striping. Approx. 50 miles of centerline and 67 miles of edgeline on County roads with additional mileage on Township roads possible.
| 09/16/2020 02:00 PM UTC |
PID 103692 CLI-CR-VAR-PM-FY21
Improvement of 80.803 miles of various County roads in Clinton County by placement of thermoplastic pavement markings on the centerline of roadways. Also improvement of 161.606 miles of various County roads by placement of 6" thermoplastic pavement marking on the edge line of roadways.
| 08/12/2020 02:00 PM UTC |
PID 103691 CLI-CR-VAR-GR-FY21
This project consists of the removal of obsolete guardrail and installation of new type MGS rail at various locations throughout Clinton County, Ohio.
| 08/12/2020 02:00 PM UTC |
CLI-CR-6-4.86 Westboro Rd. Bridge Replacement PID 109966
Design-build project to remove and replace existing substructure, superstructure, bridge railing, approach railing, and approach pavement as necessary.
| 05/13/2020 02:00 PM UTC |
PID 109364 CLI-SR-73-14.64 Improvements
Re-align the southbound lane of SR 73 by widening, beginning 800' north of the Antioch Rd. intersection and ending 600' south of the intersection to provide a southbound turning lane. Work includes construction of embankment, paving, guardrail, signage, pavement markings and raised pavement markers.
| 04/29/2020 02:00 PM UTC |
Clinton 2020 Roadway Sealing
Clinton County 2020 chip seal program - includes furnishing and placing liquid asphalt and stone (roadway sealing) and fog seal. Locations vary throughout the County on various County and Township roads. Township roads to be billed directly to individual townships.
| 04/15/2020 02:00 PM UTC |
CLI-VAR RESURFACING 2020
This project consists of an 1-1/4" asphalt surface course overlay on approximately 8.61 miles of various Clinton County roads. Work includes associated center line striping, edge line striping, and raised pavement markers. Project completion before Nov. 21, 2020.
| 03/25/2020 02:00 PM UTC |