WSP, Antioch
3260 Lone Tree Way Ste 104CA, Antioch, CA 94509-5558
(925) 325-3868
3260 Lone Tree Way Ste 104CA, Antioch, CA 94509-5558
(925) 325-3868
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Solano Transportation Authority Cordelia WB CVEF Relocation Tree Removal Project 2024-06
The Project consists of cutting trees, pruning trees, vegetation clearing, mulching trees, placement of mulch, and temporary fencing. work under the Caltrans 2023 Standard Specifications and Standard Plans.
| 11/26/2024 10:00 PM UTC |
Solano Transportation Authority SR-37/FAIRGROUNDS DRIVE INTERCHANGE 2019-06
Construct Grading, Aggregate Base, HMA Paving, Drainage, Concrete Barrier, Midwest Guardrail System, Retaining Wall, Signing, Striping, Landscaping, and Electrical work at the SR 37/Fairgrounds Interchange under the Caltrans 2023 Standard Specifications and Standard Plans.
| 10/22/2024 09:00 PM UTC |
San Francisco County Transportation Authority - Hillcrest Road Improvement Project
General work description: The Project consists of reconstruction of Hillcrest Road on Yerba Buena Island, in the City and County of San Francisco. Work includes a new soil-nail retaining wall, demolition of existing crib walls and roadway pavement, grading, paving, drainage, signing, pavement delineation, street lighting, joint trench, and concrete barrier.
| 03/14/2024 09:00 PM UTC |
Solano Transportation Authority Suisun City Transportation Mobility Hub 2023-02
The Project consists of parking lot improvements fronting Suisun Street near Common St. in Suisun City, CA. Proposed improvements include but not limited to curb and gutter, vertical curb, retaining walls, subdrain pipe, drainage swale, bioretention curbs, sidewalk, driveway, asphalt pavement plugs, asphalt digouts, storm drainage pipe, curb inlets, dome inlets, bioretention area, adjusting inlets, coordination with utility companies for box adjustments, asphalt paving and class 2 aggregate base in parking lot, pavement markings, lighting, security system, landscaping, planting, irrigation, underground electrical, foundations for electrical equipment, removal of existing fences and installation of new neighborhood wooden fence and ornamental fence and sliding gate and pedestrian gate with knock box for access, key pad access, access cards, detector loops, installation of new EV charging station and all other associated electrical work. Additional work includes miscellaneous sidewalk demo and replacement work to install new fences and gates at the back of new Authority office building, pursuant to Caltrans 2018 Standard Specifications and Standard Plans.
| 03/21/2023 09:00 PM UTC |
Alameda County Transportation Commission - 7th Street Grade Separation East (Contract No. R23-0007)
General work description: The project consists of staged construction to maintain rail and roadway traffic for construction of the realignment of 7th Street, new undercrossing, and new bridge for the UPRR railroad. Work includes site dewatering, deep soil modification, demolition, grading, paving, drainage, railway work, retaining walls, pump station, utility, signing, striping, street lighting and traffic signal work.
| 03/14/2023 09:00 PM UTC |
Solano County Transit - Maintenance Facility Yard Improvements for Battery Electric Bus Fleet
General work description: The work to be done includes the installation of a new steel structure canopy located over the existing bus parking spaces intended to provide support for Battery Electric Bus charging equipment and solar panels. The project also includes new electrical distribution underground and above ground with modifications to the existing building. The steel structure canopy will require deep underground piers and tie beams resulting in demolition and replacement of some existing concrete under the Caltrans 2018 Standard Specifications and Standard Plans.
| 11/15/2022 07:00 PM UTC |
Solano County Transit - Maintenance Facility Yard Improvements for Battery Electric Bus Fleet
General work description: The work to be done includes the installation of a new steel structure canopy located over the existing bus parking spaces intended to provide support for Battery Electric Bus charging equipment and solar panels. The project also includes new electrical distribution underground and above ground with modifications to the existing building. The steel structure canopy will require deep underground piers and tie beams resulting in demolition and replacement of some existing concrete under the Caltrans 2018 Standard Specifications and Standard Plans.
| 07/19/2022 06:00 PM UTC |
Solano Transportation Authority Suisun City Train Station Lighting and Bus Shelter Improvements Project No 20212
Proposed improvements include but are not limited to procuring and installing bus shelters/benches, street light poles, luminaires, junction boxes, conduits and conductors. Construction activities will generally consist of trenching, installing electrical facilities (lighting), and installing bus shelters pursuant to Caltrans 2018 Standard Specifications and Standard Plans.
| 02/22/2022 10:00 PM UTC |
Solano Transportation Authority - Suisun City Train Depot Lighting and Bus Shelter Improvements Project No. 20212
Proposed improvements include but are not limited to bus shelters, street light poles, luminaires, junction boxes, conduits and conductors. Construction activities will generally consist of trenching, installing electrical facilities (lighting), relocating and/or resetting utilities, and installing bus shelters pursuant to Caltrans 2018 Standard Specifications and Standard Plans.
| 01/25/2022 10:00 PM UTC |
Solano County Transit - Maintenance Facility Yard Improvements for Battery Electric Bus Fleet
General work description: The work to be done includes the installation of a new steel structure canopy located over the existing bus parking spaces intended to provide support for Battery Electric Bus charging equipment and solar panels. The project also includes new electrical distribution underground and above ground with modifications to the existing building. The steel structure canopy will require deep underground piers and tie beams resulting in demolition and replacement of some existing concrete under the Caltrans 2018 Standard Specifications and Standard Plans.
| 04/22/2021 06:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.