General Info

Business Logo

San Joaquin County Department of Public Works

1810 E Hazelton Ave, Stockton, CA 95205-6232
(209) 468-3000

The overall mission of the San Joaquin County Department of Public Works is to plan, design, construct, operate and maintain the County infrastructure, which includes public roads, transportation systems, bridges, water, wastewater, channel maintenance and solid waste disposal systems of the County, in order to best serve the interests of the people. These systems are maintained to protect the health and welfare of the public and the County’s financial investments. Public Works also provides vehicle support for the County, including procurement support, heavy and light vehicle maintenance and repair, and daily rental services.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
SJCDPW-RFP-25-08
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified construction management (CM) firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-25-08. The selected CM firm will perform professional and technical construction management engineering services for Colonial Heights and Lincoln Village Maintenance Districts Water Main Replacement Project- Phase 1B (PROJECT). The Project is funded by the State of California’s Small Communities Drought Relief Program Grant. Estimated Construction Contract Award Date: March 2026 Estimated Construction Start Date: May 2026 Estimated Construction Duration: 120 Working Days The requested professional services shall include, but not be limited to: public outreach, resident engineer services, construction management, inspection, materials testing, contract administration, and project records services for the Project. The scope of work includes: documentation of preconstruction conditions, meetings, schedule reviews, cost control, submittals and clarifications, contract modifications/change orders/claims, field inspection, testing, completion and acceptance, Project closeout, construction management plan, and other miscellaneous inspections and construction administration activities. The CM firm will also conduct formal weekly progress meetings with SJCDPW staff and the contractor. The CM firm will manage separate contractors for the District as it is anticipated that both Districts will be bid separately. The deadline for submitting technical proposals to SJCDPW will be no later than 4:00 p.m. on Monday, November 10, 2025. SJCDPW’s standard business practice strives to ensure that a consultant’s professional qualifications meet the needs and services to be performed, the payment method is appropriate, and the cost is fair and reasonable to the public agency. A copy of SJCDPW-RFP-25-08 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps-and-rfqs/current-solicitations and https://www.bidexpress.com . All prospective consultants must register for solicitation No. SJCDPW-RFP-25-08 in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum and information about the pre-proposal meeting. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. For general questions regarding the solicitation, please contact Mr. Nhan Tran, Management Analyst II, at email: ntran@sjgov.org.
11/11/2025 12:00 AM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Slurry Seal Arterial and Collector Roads 2019-2020
RD 1: Boggs Tract, Burkett Gardens/Orchard Homesites, Country Club Central & Taft Mosswood RD 2: Alpine Heights, Lincoln Village Central, Lincoln Village East & Lincoln Village West RD 3: Elkhorn Golf Course Estates, Lathrop Road & Wagner Heights RD 4: Morada Central, Morada North & Morada South
03/05/2020 09:31 PM UTC
Slurry Seal Local Roads 2019-2020
RD 1: Country Club South and South Stockton No.2 RD 2: East Stockton No. 4, West Jackson No.2, West Lane Heights/Park & Wright Lane RD 3: Colonial Heights East RD 4: Clements, Farmington & Linden RD 5: Los Ranchos Country Estates & Par Country Estates
03/05/2020 09:31 PM UTC
Carpenter Road Resurfacing
(South 99 Frontage Road (E) to Mariposa Road) The work is located southeast of the City of Stockton. The work, in general, consists of resurfacing approximately 0.8 mile of urban roadway. Base Estimate Range Between: $256,000 to $315,000
01/16/2020 09:31 PM UTC
Copperopolis Road Resurfacing
(Hewitt Road to Escalon-Bellota Road) The work is located east of the City of Stockton. The work, in general, consists of resurfacing and repairing approximately 2 miles of existing roadway. Base Estimate Range Between: $641,600 to $790,900
01/16/2020 09:31 PM UTC
Trahern Road Resurfacing
(Airport Way to Manteca Road) The work is located south of the City of Manteca. The work, in general, consists of repairing and resurfacing approximately 1.3 miles of existing roadway. Base Estimate Range Between: $495,000 to $603,000
01/16/2020 09:31 PM UTC
North 99 Frontage Road (East) Resurfacing
(890' North of Woodbridge Road to Acampo Road) The work is located north of the City of Lodi. The work, in general, consists of resurfacing and repairing approximately 0.85 of a mile of existing roadway. Base Estimate Range Between: $313,000 to $383,000.
01/09/2020 09:30 PM UTC
Crack Seal 2019-2020
(Various Roads in Supervisorial Districts 1-5) The work is located in various locations throughout the County. The work, in general, consists of crack sealing existing urban and rural roadways throughout the County with crack treatment material. Base Estimate Range Between: $660,000 to $805,000
01/09/2020 09:30 PM UTC
SJCDPW-RFQ-19-01
The San Joaquin County Department of Public Works (SJCDPW) requests statements of qualifications from engineering consulting firms to provide innovative roundabout design support services. The scope of work, completion schedule, and duration of each assignment will vary. As all of these project assignments involve funding with pending deadlines, project assignments are expected to last no longer than eighteen (18) to twenty-four (24) months including County and other agency review periods. The CONSULTANT shall prepare and submit a comprehensive schedule at the time specific projects are assigned. Required services and capabilities to be provided by On-Call CONSULTANTS include: < California Licensed Professional Engineer < Site reconnaissance/plan analysis < Preparation of project scope including: project understanding, schedule, and cost < Preparation of PS&E per the format specified by the County < Geometric Analysis of preliminary roundabout plans < Storm Drainage Analysis < Utility Coordination < Survey and Right-of-Way mapping < Geotechnical investigation and Pavement Design Report The deadline for submitting qualifications to SJCDPW will be no later than 4:00 p.m. on Friday, December 20, 2019. SJCDPW’s standard business practice strives to ensure that a consultant’s professional qualifications meet the needs and services to be performed, the payment method is appropriate, and the cost is fair and reasonable to the public agency. The specific requirements set forth in SJCDPW-RFQ-19-02 should be closely examined and followed by those consultant firms interested in submitting statements of qualifications. A copy of SJCDPW-RFQ-19-02 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs and https://www.bidexpress.com . All prospective consultants must register for each particular solicitation in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. Alternative arrangements may be made to secure a hard copy of SJCDPW-RFQ-19-02 or general questions regarding the Project by calling Mr. Nhan Tran, Consultant Selection, at the telephone number (209) 953-7452.
12/20/2019 09:00 PM UTC
Eight Mile Road Bridge No. 29C-219 Rehabilitation Project over White Slough (Honker Cut)
Federal Aid Project No. BRLS-5929(233). The work is located approximately four miles west of Interstate 5 and eight miles north of the City of Stockton. The work, in general, consists of minor truss repair, replacement of the steel-grid deck, and application of concrete overlay on the deck. Base Estimate Range Between: $1,851,957 to $2,263,503
12/19/2019 09:31 PM UTC
Kasson Road Resurfacing
(Stanislaus County Lined to Airport Way) The work is located southeast from the City of Tracy. The work, in general, consists of resurfacing and repairing approximately 1.80 miles of existing rural roadway. Base Estimate Range Between: $681,000 to $833,000
08/01/2019 08:30 PM UTC
231 - 240 of 263 Solicitations
1 2 19 20 21 22 24 26 27