General Info

Business Logo

San Joaquin County Department of Public Works

1810 East Hazelton Avenue, Stockton, CA 95205
(209) 468-3000

The overall mission of the San Joaquin County Department of Public Works is to plan, design, construct, operate and maintain the County infrastructure, which includes public roads, transportation systems, bridges, water, wastewater, channel maintenance and solid waste disposal systems of the County, in order to best serve the interests of the people. These systems are maintained to protect the health and welfare of the public and the County’s financial investments. Public Works also provides vehicle support for the County, including procurement support, heavy and light vehicle maintenance and repair, and daily rental services.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Handel Road Resurfacing
The work is located east of Lodi. The work, in general, consists of repairing and resurfacing approximately 1 mile of roadway with asphalt concrete. Base Estimate Range between $302,000 and $372,000
05/01/2025 08:31 PM UTC
Airport Way Frontage Road Resurfacing
The work is located south of the City of Stockton. The work, in general, consists of repairing and resurfacing approximately 0.21 miles of roadway with asphalt concrete. Base Estimate Range between $345,106 and $420,616
05/01/2025 08:31 PM UTC
Road District 4 Streets Resurfacing 2025
The work is located east of State Route 99 and north of Lockeford. The work, in general, consists of repairing and resurfacing approximately 3 miles of roadway with asphalt concrete. Base Estimate Range between $830,000 and $1,013,000
05/01/2025 08:31 PM UTC
Delta-Mendota Bridge Railing Replacement Project, Federal Aid Project No. BPMPL-5929(260)
The work is located at Koster Road Bridge No. 29C-353. The work, in general, consists of replacing the existing bridge barrier with reinforced concrete barrier and realigning access roads. The DBE Contract goal is 24 percent Base Estimate Range Between $970,000 and $1,185,000
05/08/2025 08:31 PM UTC
Wetherbee Lake Streets Resurfacing
The work is located southwest of the City of Manteca. The work, in general, consists of repairing and resurfacing approximately 1 mile of roadway with asphalt concrete. Base Estimate Range between $287,500 and $345,000
05/15/2025 08:31 PM UTC
Graham Road and Pearl Road Resurfacing
The work is located East of Elliot Road and South of Liberty Road. The work, in general, consists of repairing and resurfacing approximately 4 miles of roadway with asphalt concrete. Base Estimate Range between $1,100,000 and $1,345,000
05/15/2025 08:31 PM UTC
SJCDPW-RFP-25-02
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-25-02. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Airport Way Precise Plan (PLAN). The PLAN will focus on establishing the ultimate configuration of Airport Way between the City of Stockton limits at French Camp Road and the City of Manteca limits south at Roth Road that is necessary to serve future travel demands in south San Joaquin County. Alternatives considered by the PLAN will continue to facilitate industrial operations, including truck traffic, on and near the corridor and evaluate bicycle facilities for continuity with adjacent City planning. The requested services will include public outreach, existing conditions analysis, and proposing transportation alternatives.. CONSULTANT will be requested to enter into a Consultant Services Agreement with San Joaquin County (County). All work shall comply with San Joaquin County Policies. The requested professional services shall include, but will not be limited to, the following: • Comprehensive data collection • Traffic and Operations analysis • Safety Analysis • Right of Way studies • Alternative analysis • Extensive stakeholder outreach/meetings The deadline for submitting technical proposals to SJCDPW will be no later than 4:00 p.m. on Friday, May 23, 2025. SJCDPW’s standard business practice strives to ensure that a consultant’s professional qualifications meet the needs and services to be performed, the payment method is appropriate, and the cost is fair and reasonable to the public agency. A copy of SJCDPW-RFP-25-02 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs and https://www.bidexpress.com . All prospective consultants must register for solicitation No. SJCDPW-RFP-25-02 in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. For general questions regarding the solicitation, please contact Mr. Nhan Tran, Management Analyst II, at the telephone number (209) 953-7452 or email: ntran@sjgov.org .
05/23/2025 11:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
Slurry Seal Local Roads 2018-2019
RD 1: South Stockton No. 1; RD 2: East Stockton No. 1; RD 3: Country Club Northwest; RD 4: Collierville, Victor and Woodbridge South; RD 5: Santos Ranch The work is located in various locations throughout the County. The work, in general, consists of repairing and applying a slurry seal to existing urban roadways. Base Estimate Range Between: $1,010,000 to $1,245,000
02/28/2019 09:31 PM UTC
SJCDPW-RFP-19-01
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-19-01. The selected two consulting firms (CONSULTANT) will perform professional and technical engineering services for 100% Plans, Technical Specifications and Engineering Estimates for the design of the Buckman Road Bridge (29C-307) over North Duck Creek Branch and the Messick Road Bridge (29C-274) over Mosher Creek Replacement Projects (PROJECT). The highest ranked CONSULTANT will provide the requested services for the Messick Road Bridge (29C-274) Project and the second highest ranked CONSULTANT will provide the requested services for the Buckman Road Bridge (29C-307) Project. This Solicitation is also available at https://www.sjgov.org/department/pwk/rfps_and_rfqs?solicitations=current.
02/08/2019 09:00 PM UTC
Victory Road Bridge 29C-467 Over Lone Tree Creek Replacement Project
Federal Aid Project No. BRLO-5929(216) The work, is located at the southeastern boundary of San Joaquin County adjacent to Stanislaus County, approximately 1.5 miles north of State Route 120, on Victory Road, between Dutra Lane and Anker Road. The work, in general, consists of replacing the existing 2-span concrete slab bridge on driven piles and the associated work with the roadway, drainage, driveway conforms, RSPs, retaining walls, and striping. Base Estimate Range Between: $1,710,000 to $2,090,000
01/17/2019 09:31 PM UTC
Crack Seal 2018-2019
Various Roads in Districts 1-5 The work is located in various locations throughout the County. The work, in general, consists of crack sealing existing urban and rural roadways throughout the County with crack treatment material. Base Estimate Range Between: $455,000 to $555,000
01/17/2019 09:31 PM UTC
Construction of Module 2B at the Foothill Sanitary Landfill
The work is at the Foothill Landfill, 6484 North Waverly Road located near Linden, California. The work, in general, consists of constructing a new lined containment module. Base Estimate Range Between: $7,000,000 to $8,531,000
01/10/2019 09:31 PM UTC
Sowles Road Resurfacing
Sowles Road from Peltier Road to Collier Road This project, in general, consists of reconstructing and surfacing approximately 2.0 miles of existing rural roadway. Base Estimate Range Between: $611,000 to $747,000
08/02/2018 08:31 PM UTC
231 - 236 of 236 Solicitations
1 2 16 17 18 19 20 21 22 24 Next →