Midland County Road Commission
2334 N. Meridian Rd., Sanford, MI 48657
(989) 687-9060
2334 N. Meridian Rd., Sanford, MI 48657
(989) 687-9060
Name * | Description | |
---|---|---|
MCRC Standard Instructions to Bidders.pdf (87.7 KB) | ||
Number | Deadline |
---|---|
2025-07 Chip Seal Program
Chip Seal / Fog Seal Application
Estimated 48 Miles, to include both Primary and Local Roads
| 03/07/2025 05:00 PM UTC |
2025-08 Overband Crack Fill and HMA Crack Treatment
Overband Crack Fill
-Estimated 28.57 Miles on primary and local roads throughout Midland County.
-Additional projects throughout the county as agreed upon between contractor and the Road Commission.
| 03/07/2025 05:00 PM UTC |
2025-09 Retaining Wall Block Supply
Supplying and delivering retaining wall blocks to serve as the small block units for a Geosynthetic Reinforced Soil Abutment bridge in Midland County, MI.
| 03/20/2025 04:00 PM UTC |
2025-10 Aggregates
Aggregates - Stockpiled & Delivered On Road
| 03/20/2025 04:00 PM UTC |
2025-11 Large Culvert Supply
Supplying and delivering the following types and sizes of culvert:
Smiths Crossing Rd over Emory Drain - 112" x 75" CMP Arch, 46 FT Long, Aluminized Type II
Bradford Rd over Duncan & Brooks Drain - 137" x 87" CMP Arch, 57 FT Long, Aluminized Type II
Alamando Rd over Krick Intercounty Drain - 142" x 91" CMP Arch, 60 FT Long, Aluminized Type II
| 03/20/2025 04:00 PM UTC |
2025-12 Geotextiles and Erosion Control
Supplying Geotextile Materials including:
-Rip Rap Liner
-High Strength Polypropylene
-Erosion Control Materials
| 03/20/2025 04:00 PM UTC |
2025-13 Pulverization
Crushing existing asphalt pavement and/or seal coat.
| 03/20/2025 04:00 PM UTC |
2025-14 Hydroseed Materials
Supplying and delivering Hydroseed Materials to the Midland County Road Commission Sanford location, 2334 N Meridian Rd, Sanford, MI 48657
| 03/20/2025 04:00 PM UTC |
2025-15 Precast Concrete Deck Panels
Precast Concrete Deck Panel System
| 03/20/2025 04:00 PM UTC |
Number | Deadline |
---|---|
2019-12 Signs & Posts
Street Signs and Steel Posts
| 03/15/2019 05:00 PM UTC |
2019-01 Aggregates
Aggregates - Stockpiled & Delivered On Road
| 03/15/2019 05:00 PM UTC |