Franklin County Engineer's Office
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
2025-07
2025 Franklin County Township Resurfacing Program
EBE Goal = 8%
Upgrading various sections of Franklin County township roadways, detailed within; with asphalt resurfacing, curb, and sidewalk replacement.
Engineer's Estimate = $5,095,953.05
| 04/15/2025 02:00 PM UTC |
2025-11
2025 General Bridge Maintenance Contract:
EBE Goal: 6%
Rehabilitating the Norton Road 6.33 Bridge over Hellbranch Run by installing approach slabs, upgrading the bridge railing, and installing a new concrete overlay. A new concrete overlay will be installed on the Hayden Run Road 3.37 Bridge over Hayden Run and the Hague Avenue 1.72 Bridge over Barbee Ditch.
ENG ESTIMATE = $558,768
| 04/15/2025 02:00 PM UTC |
Number | Deadline |
---|---|
2019-07
2019 Franklin County Road Maintenance & Safety Program - Upgrading various sections of Franklin County roadways with pavement preservation and safety enhancements.
Engineer's Estimate $496,697.40
| 09/03/2019 06:00 PM UTC |
2019-12
MAD-TR232-1.02 Braun Road over Snyder Ditch
This project entails the replacement of an existing concrete slab culvert with a new precast concrete box culvert and other incidentals necessary to complete the work.
ENGINEER'S ESTIMATE: $323,124.75
| 07/30/2019 06:00 PM UTC |
2019-10
2019 City of Groveport/Village of Obetz Resurfacing Program - Upgrading various sections of roadway within The City of Groveport and The Village of Obetz with asphalt resurfacing and aggregate berm material.
| 07/24/2019 06:00 PM UTC |
2019-01
JAC-TR266-1.66 Borror Road over Plum Run North
This project entails the replacement of the existing structure on Borror Road over Plum Run North with a three sided flat topped precast concrete culvert and approximately 175 feet of approach roadway work.
ENG ESTIMATE = $481,938.10
| 07/02/2019 06:00 PM UTC |
2019-04
Reynoldsburg-New Albany Road Improvement.
This project consists of full-depth asphalt pavement widening and resurfacing over 0.49 miles of Reynoldsburg-New Albany Road. Widening is required to add a northbound left turn lane and a southbound right turn lane at the newly constructed Wolli Creek Drive ( entrance to a new residential development) as well as 1,000 feet of a two way left turn lane between Wolli Creek Drive and existing Hannah Farms Court. Improvements also include ditch grading north of the new drive, curb and gutter with storm sewers to the south of the drive and pavement striping.
ENGINEERS ESTIMATE $753,868
| 05/30/2019 06:00 PM UTC |
2019-06
JAC-TR266-1.66 Borror Road over Plum Run North
This bid only consists of the fabrication and delivery of precast 3-sided flat top boxes, wingwalls and headwalls and the necessary materials to properly install the prefabricated structures.
| 05/21/2019 05:36 PM UTC |
2019-08
2019 Franklin County Township Resurfacing Program - Upgrading various sections of township roadways, detailed within; with asphalt resurfacing and aggregate berm material.
| 05/21/2019 01:00 PM UTC |
2019-02
2019 Drainage Investigation and Repair Services
This solicitation seeks bids on a variety of items related to drainage repair and investigation. Our intent is to apply the prices on the winning bid to a variety of small drainage related projects as the need dictates throughout 2019. The Engineer's Estimate is $275,598.00 and the maximum acceptable bid is $303,157.80. However we anticipate not using all of the items on the bid and expect to spend up to $100,000.00.
| 05/07/2019 06:00 PM UTC |
2019-05
2019 Franklin County Resurfacing Program - Upgrading 15.069 miles of various sections of Franklin County roadways, detailed within; with asphalt resurfacing and aggregate berm material.
| 04/23/2019 06:00 PM UTC |
2018-08
Intersection improvements of Norton Road (CR3) and Johnson Road (TR 293) by converting from a two-way stop controlled intersection to a single lane roundabout.
Engineer's Estimate $2,165,777
| 04/09/2019 06:00 PM UTC |