Franklin County Engineer's Office
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
2025-07
2025 Franklin County Township Resurfacing Program
EBE Goal = 8%
Upgrading various sections of Franklin County township roadways, detailed within; with asphalt resurfacing, curb, and sidewalk replacement.
Engineer's Estimate = $5,095,953.05
| 04/15/2025 02:00 PM UTC |
2025-11
2025 General Bridge Maintenance Contract:
EBE Goal: 6%
Rehabilitating the Norton Road 6.33 Bridge over Hellbranch Run by installing approach slabs, upgrading the bridge railing, and installing a new concrete overlay. A new concrete overlay will be installed on the Hayden Run Road 3.37 Bridge over Hayden Run and the Hague Avenue 1.72 Bridge over Barbee Ditch.
ENG ESTIMATE = $558,768
| 04/15/2025 02:00 PM UTC |
Number | Deadline |
---|---|
2021-18
Elliott Road & Hayden Run Road Drainage Improvement Project
Drainage improvements along Hayden Run Road and Elliott Road, including repairing and replacing failed drainage systems along the existing Joseph Carr Ditch (JCARR), and building 2.95 miles of new storm sewer and ditch on a new alignment.
EBE GOAL: 8%
ENG ESTIMATE: $3,346,843.80
| 04/05/2022 05:00 PM UTC |
2022-06
Clark State Road Curve Improvement. EBE Goal: 6%.
Improving 0.13 miles of Clark State Road by installing an outlet for existing roadside drainage, constructing a full depth pavement repair, and performing resurfacing and shoulder reconditioning.
ENGINEER'S ESTIMATE: $171,210.00
| 04/05/2022 02:30 PM UTC |
2022-01
Improvements of Fisher Road. EBE Goal: 7%.
Milling/Resurfacing and widening of 0.16 miles of Fisher Road to add an eastbound right-turn lane and westbound left-turn lane for the Franklin County Correctional Facility. Work also includes curb and sidewalk.
ENGINEER'S ESTIMATE $1,373,567.00
| 04/05/2022 02:00 PM UTC |
2021-13
Agler Rd 1.52 over Alum Creek (FRA-CR16-1.52), Full Closure, PID 105741 -
DBE Goal: 10%
Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail).
ENG ESTIMATE = $6,665,759.58
| 03/29/2022 06:00 PM UTC |
2021-19
Winchester Pike 0.87 over Georges Creek (FRA-CR376-0.87), PID 105761, DBE Goal: 10% -
Upgrading 0.04 miles of C.R. 376 (Winchester Pike) by replacement of an existing non-composite box beam bridge over Georges Creek with a continuously reinforced concrete slab bridge and minimal roadway approach work.
ENG ESTIMATE = $1,486,838.36
| 03/15/2022 06:00 PM UTC |
2021-21
Commerce Street, Vause Road, Canal Road Improvements:
Improve Vause Road by installing a truck turnaround between the Norfolk Southern Railroad bridge and the CSX Railroad bridge. Improve the intersection of Vause Road and Canal Road with a widened pavement truck turnaround. EBE Goal 8%
ENGINEER'S ESTIMATE: $453,442.00
| 02/08/2022 03:30 PM UTC |
2021-24
Lockbourne Road & London-Groveport Road (SR 317) Roundabout:
Upgrading 0.17 miles of London-Groveport Road (SR 317) and 0.17 miles of Lockbourne Road by constructing a single-lane roundabout. The project will improve drainage, pavement, signing, pavement markings and street lighting at the intersection.
ENGINEER'S ESTIMATE: $2,050,518.00
| 02/08/2022 03:00 PM UTC |
2021-13
Agler Rd 1.52 over Alum Creek (FRA-CR16-1.52), PID 105741 -
DBE Goal: 10%
Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail).
ENG ESTIMATE = $5,429,368.46
| 01/06/2022 07:00 PM UTC |
2021-16 B
Morse Road at Babbitt Road Roundabout Improvement:
FRA-CR 17-11.80 PID 109494
DBE Goal 8%
This project consists of the construction of a single lane modern roundabout at the intersection of Morse Road and Babbitt Road. The project will replace the existing bridge over Swisher County Ditch with a box culvert, enclosing Swisher County Ditch within the project limits. The project will also provide a new enclosed storm sewer system, new pedestrian facilities, new 16" waterline and new street lighting.
ENG ESTIMATE: $4,042,652.00
| 01/04/2022 03:00 PM UTC |
2021-16
Morse Road at Babbitt Road Roundabout Improvement:
FRA-CR 17-11.80 PID 109494
DBE Goal 8%
This project consists of the construction of a single lane modern roundabout at the intersection of Morse Road and Babbitt Road. The project will replace the existing bridge over Swisher County Ditch with a box culvert, enclosing Swisher County Ditch within the project limits. The project will also provide a new enclosed storm sewer system, new pedestrian facilities, new 16" waterline and new street lighting.
ENG ESTIMATE: $4,105,826.26
| 11/30/2021 03:00 PM UTC |