Franklin County Engineer's Office
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
2025-07
2025 Franklin County Township Resurfacing Program
EBE Goal = 8%
Upgrading various sections of Franklin County township roadways, detailed within; with asphalt resurfacing, curb, and sidewalk replacement.
Engineer's Estimate = $5,095,953.05
| 04/15/2025 02:00 PM UTC |
2025-11
2025 General Bridge Maintenance Contract:
EBE Goal: 6%
Rehabilitating the Norton Road 6.33 Bridge over Hellbranch Run by installing approach slabs, upgrading the bridge railing, and installing a new concrete overlay. A new concrete overlay will be installed on the Hayden Run Road 3.37 Bridge over Hayden Run and the Hague Avenue 1.72 Bridge over Barbee Ditch.
ENG ESTIMATE = $558,768
| 04/15/2025 02:00 PM UTC |
Number | Deadline |
---|---|
2021-11
This project will provide potable water to the Franklin County Engineer’s Office East Maintenance Facility at 4801 Hendron Road, Groveport, Ohio. This project will replace an existing well that currently services the site.
| 09/07/2021 06:00 PM UTC |
FCTID-BID
The following is a notification of a project bidding on the Franklin County Transportation Improvement District Bid Express site. Please see attachment below and add notifications for upcoming FCTID projects.
The project currently bidding on FCTID Bid Express site is:
2021-23
50 E. Mound Street Surface Parking Lot
Engineer's Estimate: $691,457.85
| 08/05/2021 06:30 PM UTC |
2021-20
Olentangy River Rd 11.40 over Carhart Ditch (SHA-CR9-11.40) & Olentangy River Rd 11.62 over Linworth Run (SHA-CR9-11.62) -
At Carhart Ditch, upgrading 450 feet of Olentangy River Road buy providing the replacement of the existing bridge over Carhart Ditch (SHA-CR9-11.40), north of S.R. 161. At Linworth Run, replacement of the existing 3-sided culvert carrying Linworth Run under Olentangy River Road (SHA-CR9-11.62) just north of Whieldon Lane. The project includes additional roadway resurfacing quantities on either end of the project.
ENG ESTIMATE = $1,409,587.72
EBE Goal = 8%
| 07/20/2021 06:00 PM UTC |
2021-22
Combined Schleppi Road Drainage Improvement and Schleppi Road Bridge Replacement -
Upgrading approximately 575' of storm sewer and replacing two drive culverts along Franklin County Road No. 191 (Schleppi Rd.) and the other incidentals necessary to complete the work.
Replacement of the existing Schleppi 0.97 concrete slab culvert with a new concrete box culvert and the other incidentals necessary to complete the work.
ENG ESTIMATE: $585,190.55
EBE Goal: 6%
| 07/13/2021 07:00 PM UTC |
2021-04
Hoover Rd 2.04 over Tributary of Grant Run (JAC-CR262-2.04) - Complete replacement of the existing structure with a 12 ft. span by 6 ft. rise box culvert and approach roadway work.
ENG ESTIMATE = $359,443.90
EBE Goal = 6%
| 07/13/2021 06:30 PM UTC |
2021-15
Precast Box Culverts & Wingwalls for Olentangy 11.40 over Carhart Ditch and Olentangy 11.62 over Linworth Run - This bid consists of the fabrication and delivery of 36 linear feet of 12’x6’ precast concrete boxes and 126 linear feet of 12’x8’ precast concrete boxes. This bid also consists of the fabrication and delivery of precast wingwalls and headwalls for one of the culverts. All necessary materials to properly install the prefabricated systems shall be included.
ENG ESTIMATE = $176,300
| 06/15/2021 06:00 PM UTC |
2021-14
2021 Franklin County Township Resurfacing Program
Upgrading various sections of Franklin County township roadways with asphalt resurfacing and aggregate berm material.
ENG. ESTIMATE $3,320,129.98
| 06/10/2021 06:00 PM UTC |
2021-05
Borror Rd 0.11 over Tributary of Strader Ditch (JAC-TR266-0.11) - Complete replacement of the existing structure with a 12 ft. span by 6 ft. rise box culvert and approach roadway work.
ENG ESTIMATE = $233,670
EBE Goal = 5%
| 06/08/2021 06:00 PM UTC |
2021-08
Eureka Avenue, Valley View Drive, Highland Avenue & Harper Road Paved Shoulder Improvement
Providing paved shoulder improvements for 0.05 miles along Eureka Avenue (CR65A), 0.19 miles along Valley View Drive (CR65), and 0.08 miles along Highland Avenue (CR65). An ADA shared use path crossing will be provided on both sides of Eureka Avenue at the Camp Chase Railroad. Additionally, the project includes drainage improvements and resurfacing.
ENG ESTIMATE = $548,375.00
| 06/08/2021 02:00 PM UTC |
2021-05
Borror Rd 0.11 over Tributary of Strader Ditch (JAC-TR266-0.11) - Complete replacement of the existing structure with a 12 ft. span by 6 ft. rise box culvert and approach roadway work.
ENG ESTIMATE = $222,534.63
EBE Goal = 5%
| 05/20/2021 06:00 PM UTC |