Franklin County Engineer's Office
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
2025-07
2025 Franklin County Township Resurfacing Program
EBE Goal = 8%
Upgrading various sections of Franklin County township roadways, detailed within; with asphalt resurfacing, curb, and sidewalk replacement.
Engineer's Estimate = $5,095,953.05
| 04/15/2025 02:00 PM UTC |
2025-11
2025 General Bridge Maintenance Contract:
EBE Goal: 6%
Rehabilitating the Norton Road 6.33 Bridge over Hellbranch Run by installing approach slabs, upgrading the bridge railing, and installing a new concrete overlay. A new concrete overlay will be installed on the Hayden Run Road 3.37 Bridge over Hayden Run and the Hague Avenue 1.72 Bridge over Barbee Ditch.
ENG ESTIMATE = $558,768
| 04/15/2025 02:00 PM UTC |
Number | Deadline |
---|---|
2021-10
2021 Franklin County Resurfacing program for upgrading
18.430 miles of various Franklin County roadways, detailed within; with asphalt resurfacing and aggregate berm material
ENG ESTIIMATE: $3,354,528.25
| 05/06/2021 06:00 PM UTC |
2020-15
Ormond Avenue Drainage Improvement Part II -
Rebuild drainage system along the south side of Ormond Avenue between Walford Street and Cleveland Avenue. Improve pedestrian access by adding sidewalk to provide a contiguous path between Walford Street and Cleveland Avenue. This project is the second part of drainage improvements which began with reconstruction of the north side in 2018. This project is funded through the Ohio Public Works Commission (OPWC) and matching fund participation from Clinton Township.
ENGINEER'S ESTIMATE: $394,341.00
| 05/04/2021 06:00 PM UTC |
2021-07
Toy Road, Swisher Road, Saltzgaber Road and Groveport Road Improvement Part 1 & 2
Groveport Road and Saltzgaber Road Improvements Part 1:
The project involves a roadway widening plan for Groveport Road for approximately 0.34 miles and Saltzgaber Road for approximately 0.48 miles. The typical section for Saltzgaber Road will be 3 lanes with a two-way left turn lane along the majority of the alignment. Groveport Road widening includes an eastbound left and eastbound right turn lane along with a westbound left turn lane. The project will also improve drainage.
Improvements of Toy Road, Swisher Road & Saltzgaber Road Part 2:
Improve Toy Road with dual cul-de-sac east of the intersection of Centerpoint Parkway. Resurface the remaining Toy Road and Swisher Road and part of Saltzgaber Road with 1.5” asphalt overlay. Improve drainage and install traffic control items.
ADD ENG ESTIMATE $2,739,346.17
| 04/06/2021 02:00 PM UTC |
2020-16
Olentangy River Road Storm Sewer Improvement - This project consists of the installation of a storm sewer trunk that will alleviate drainage issues along the west side of Olentangy River Road, south of Crestway Drive and north of the existing culvert at Turkey Run.
ENG ESTIMATE = $269,430.20
| 03/09/2021 07:00 PM UTC |
2020-07
Refugee Rd 5.99 over Big Walnut Creek (MAD-C14-5.99) - Rehabilitation of the Refugee Rd over Big Walnut Creek Bridge by providing a new concrete sidewalk, new concrete barriers, and new exterior beams. Construction of 0.40 miles of shared use path and walk on a new alignment, including associated grading, drainage, and drive approaches.
ENG ESTIMATE = $2,785,652.79
EBE Goal: 12%
| 01/20/2021 07:00 PM UTC |
2020-12
Clark State Road and Longstreth Park Place Drainage Improvements
Upgrading the storm sewer system within Longstreth Subdivision.
$528,141.00
| 09/15/2020 06:00 PM UTC |
2020-13
Murnan Road Drainage Improvement
Drainage Improvements along Murnan Road from the intersection with Kuhlwein Road to approximately 1,900 feet south of the intersection. Improvements include minor grading to enhance roadside ditches to allow stormwater to drain to the approximately 5,200 linear feet of new storm sewer.
$1,184,655.00
| 08/18/2020 06:30 PM UTC |
2020-10
2020-21 General Drainage Maintenance
Assist the Franklin County Drainage Engineer and the Franklin County Engineer with work to excavate, repair, replace and upgrade various on road and off road stormwater drainage systems in Franklin County.
ENG ESTIMATE: $1,199,999.00
| 07/23/2020 06:00 PM UTC |
2020-11
REBID of Smothers Road at Harlem Road BMP Redesign.
Reconstruction of the existing water quality and detention basin that provides storm-water management for the intersection of Smothers Road and Harlem Road.
ENG ESTIMATE $128,438.98
| 07/14/2020 02:00 PM UTC |
2020-09
Upgrading various sections of Franklin County township roadways with asphalt resurfacing and aggregate berm material.
ENG ESTIMATE $2,487,943.25
| 07/07/2020 06:30 PM UTC |