Franklin County Engineer's Office
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
970 Dublin Rd, Columbus , OH 43215
(614) 525-3030
Brad Foster, P.E., P.S. Franklin County Engineer
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
2025-07
2025 Franklin County Township Resurfacing Program
EBE Goal = 8%
Upgrading various sections of Franklin County township roadways, detailed within; with asphalt resurfacing, curb, and sidewalk replacement.
Engineer's Estimate = $5,095,953.05
| 04/15/2025 02:00 PM UTC |
2025-11
2025 General Bridge Maintenance Contract:
EBE Goal: 6%
Rehabilitating the Norton Road 6.33 Bridge over Hellbranch Run by installing approach slabs, upgrading the bridge railing, and installing a new concrete overlay. A new concrete overlay will be installed on the Hayden Run Road 3.37 Bridge over Hayden Run and the Hague Avenue 1.72 Bridge over Barbee Ditch.
ENG ESTIMATE = $558,768
| 04/15/2025 02:00 PM UTC |
Number | Deadline |
---|---|
2020-02
Installation of traffic signal interconnect and communications equipment required to integrate the traffic signals along Alum Creek Drive onto the regional Columbus Traffic Signal System for remote signal coordination and monitoring and to establish a connected vehicle environment for the deployment and testing of vehicle to infrastructure communication technologies.
ADD ENG ESTIMATE: $1,361,675
| 02/25/2020 07:00 PM UTC |
2019-19
Madison Township Fire Station 182 Improvement: The reconstruction of a parking lot and access road for Fire Station #182 located at 6600 Gender Road. The work will include removing existing pavement and replacing with concrete pavement. Additionally, a closed storm sewer system will be constructed as part of the improvement.
| 02/04/2020 03:00 PM UTC |
2019-13
Havenwood Improvement: The project includes the rehabilitation of 0.52 miles of Westport Road, 0.20 miles of Nationwide Boulevard, and 0.16 miles of Lincoln Park Court with chemically stabilized subgrade and asphalt. The project also includes ADA compliant sidewalk replacements, curbs and driveway replacements along 0.07 miles of Industrial Mile Road as well as the work areas noted above. The project is located in Franklin and Prairie Townships, Franklin County, Ohio.
ENG ESTIMATE $2,106,691
| 01/28/2020 03:00 PM UTC |
2019-22
Precast Culvert Sale 2019 (Multiple Bridges):
This bid consists of the fabrication and delivery of 112 linear feet of 10’x10’ precast concrete boxes and 228 linear feet of 12’x6’ precast concrete boxes. This bid also consists of the fabrication and delivery of precast wingwalls and headwalls and the necessary materials to properly install the prefabricated systems for one of the culverts.
| 01/14/2020 07:00 PM UTC |
2019-23
The Kahler Tile Replacement Drainage Improvement Plan includes constructing a permanent stormwater outlet for Basin B within Hoover Farms Development (City of Columbus Plan 3592E). Additionally, the western outlet of the existing 36” culvert crossing Cubbage Road @ Sta. 44+73 (South of Walnut Street) will be repaired and improved to reduce downstream erosion of the embankment. This work will require a closure of Cubbage Road and disturb approximately 1.54 Acres.
ENG ESTIMATE: $634,263.35
| 01/07/2020 03:00 PM UTC |
2019-24
Hayden Run Central Ohio Greenways Trail Improvements (Prefab Material Purchase).
This bid only consists of the fabrication and delivery of a Prefabricated Steel Truss and Components along with the necessary materials to properly install the deliverables.
ENG ESTIMATE - $105,000
| 01/07/2020 03:00 PM UTC |
2018-12
FRA-CR27-7.85 Trabue Road over Norfolk Southern Railroad.
Rehabilitation of the existing Trabue Road Bridge over Norfolk Southern Railroad, including approximately 2100 feet of shared use path and associated roadway and resurfacing work.
ADD ENG ESTIMATE: $3,854,273.95
| 12/10/2019 01:00 PM UTC |
2019-16
Site Clearing-Reynoldsburg-New Albany at Clark State This project consists of site clearing for the future improvement of the intersection of Reynoldsburg-New Albany Road and Clark State Road by removing trees and stumps which conflict with the proposed roadway improvements.
| 11/26/2019 03:00 PM UTC |
2019-17
2020 Franklin County Traffic Maintenance Contract
On-call maintenance of electronic traffic control equipment within unincorporated Franklin County, Ohio.
ENG ESTIMATE = $583,545
| 10/29/2019 06:00 PM UTC |
2019-09
Roberts Road Shared Use Path: This project consists of approximately 825 linear feet of improvements along the north side of Roberts Road to include an asphalt shared use path, curb ramps, and detention basin within Norwich Township, Franklin County, Ohio.
Engineer's Estimate $212,600.
| 09/05/2019 06:00 PM UTC |