The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240592 BRT - Condensate Tank Replacement
Description
The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
| 04/10/2025 05:00 PM UTC |
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
| 04/16/2025 06:00 AM UTC |
Number | Deadline |
---|---|
OSU-220393 University Hall - Rm 014 Renovation
Renovation of lecture hall to include fixed seating, ADA access to instructor, finishes, and technology
| 02/08/2023 07:00 PM UTC |
OSU-210265 Roof Repairs and Replacements
Roof Repairs and Replacements for 1315 Kinnear Road. Includes associated interior protection, HVAC, plumbing, and electrical work.
| 01/27/2023 06:00 PM UTC |
OSU-210265 Roof Repairs and Replacements
Roof Repairs and Replacements for 1315 Kinnear Road. Includes associated interior protection, HVAC, plumbing, and electrical work.
| 01/27/2023 11:00 AM UTC |
OSU-221154 ESL - Steam & Condensate Piping Replacement
This project will replace steam and condensate piping.
| 01/26/2023 07:00 PM UTC |
OSU-221154 ESL - Steam & Condensate Piping Replacement
This project will replace steam and condensate piping.
| 01/26/2023 05:00 AM UTC |
OSU-210626, Doan - Room 425 Pre Op Refresh
Interior renovation including ceilings, flooring, paint, and other general construction.
| 01/25/2023 07:00 PM UTC |
OSU-210456 Wooster - Lab Bldg USDA Rm 305 Build Out REBID
This project will improve the shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
| 01/24/2023 07:00 PM UTC |
OSU-220002, MMP Pavilion - SOLA MRI REBID
Removal of existing MRI Equipment and replacement within existing MRI suite. Associated work to include limited demolition and upgrades to associated structural and MEP systems within the suite and on the roof of the existing building. Work to be completed within an active patient environment.
| 01/19/2023 07:00 PM UTC |
OSU-190128 Envelope Modernization
This project will repair Larkins Plaza waterproofing, drains, and concrete as well as portions of the curtain walls on RPAC. Project will add lighting and repair concrete ramps and stairs.
| 01/11/2023 08:00 PM UTC |
OSU-210420, Newark - Founders Hall Enhancements
Full abatement services to the Founders Hall building on the OSU/COTC Newark Campus.
| 01/05/2023 07:00 PM UTC |