OSU-240592 BRT - Condensate Tank Replacement
Description
The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
| 04/10/2025 05:00 PM UTC |
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
| 04/16/2025 06:00 AM UTC |
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-150031, OSU African-American Extension Center (Community Project)
Renovation of 4,892 SF of the OSU African-American Community Extension Center located at 905 Mount Vernon Avenue, Columbus, Ohio. The project scope includes: The removal of an existing computer lab, three (3) offices and an equipment storage area to create a new flexible Computer Lab, a new Classroom, new ADA family Toilet Room and new open Gathering/Library Space. See also Alternates.
| 05/24/2022 06:00 PM UTC |
OSU-160917, Wooster - Campus Identification
OSU Wooster Campus: Removal of existing masonry campus identification sign, fabrication and installation of large internally illuminated campus identification sign, and construction of masonry wall with engraved pre-cast sign panel.
| 05/11/2022 06:00 PM UTC |
OSU-210288, Marion - Building Standby Generator Replacements
OSU Marion Campus: Remove existing interior, natural gas generators, associated transfer switches and distribution equipment at Morrill Hall and the Library Classroom Building.
Provide a new emergency natural gas generator exterior to Morrill Hall. Provide new transfer switches and distribution for emergency and standby loads.
Provide a new emergency natural gas generator exterior to Library Classroom Building. Provide new transfer switches and distribution for emergency and standby loads.
| 05/11/2022 06:00 PM UTC |
OSU-210682 - Mansfield - Civic Plaza Improvements
This project will create a new outdoor plaza area between Eisenhower Memorial Center and Conard Hall - approx. 4,000 SF. OSU Mansfield Campus, Mansfield OH.
| 04/22/2022 06:00 PM UTC |
OSU-190314, James - Clinical Eng Offices
Renovations to rooms L004 and L060 on the Conference Level of the James Cancer Hospital, to accommodate Clinical Engineering, Zone Shop, and Materials Management.
| 04/22/2022 06:00 PM UTC |
OSU-210096, Doan-Rhodes - Replace Imaging Equipment
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase one – the Zee MP and Spect CT areas, phase two – the Agile
area and phase three – the tech work area.
| 04/12/2022 06:00 PM UTC |
OSU-210287, Marion - Alber Student Center Renovation Ph 2
OSU Marion: Interior renovation and improvement of selected areas of the Alber Student Center, including the existing public restrooms, locker rooms, game room, and gymnasium.
| 04/08/2022 06:00 PM UTC |
OSU-190066 HVAC Replacements FY 2019 - Bid Package 02
Davis Heart and Lung: Delta Controls Replacements
| 04/01/2022 06:00 PM UTC |
OSU-210440, Airport - Hangar Airpark Development (REBID)
OSU Airport: Extension of Taxiway A8 and Service Road (REBID)
| 03/30/2022 06:00 PM UTC |
OSU-210286 - Mansfield - Exterior Signs and Walk Renovation
This project will include the fabrication and installation of campus-wide exterior signage including vehicular directional, pedestrian directional, service area identification, building identification, parking lot identification. Also includes removal of some existing exterior signs
| 03/25/2022 06:00 PM UTC |