The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240592 BRT - Condensate Tank Replacement
Description
The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
| 04/10/2025 05:00 PM UTC |
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
| 04/16/2025 06:00 AM UTC |
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-200328 Tunnel System Evaluation - BP 1 Tunnel Temporary
The project consists of the installation of temporary structural supports within the 19th Avenue Tunnel and the Cockins Hall Vault. The project will also remove and replace piping within the Cockins Hall Vault, remove abandoned utilities within the 19th Avenue Tunnel, and re-rack existing communications cabling within the 19th Avenue Tunnel. Temporary lighting will also be installed in the 19th Avenue Tunnel.
| 03/25/2022 06:00 PM UTC |
OSU-210274-1, BMEC Ph 2 - Demolition
OSU Columbus Campus:
The scope will include the total demolition of Watts Hall (2041 College Rd, Columbus, OH 43210-1178) which is physically connected to MacQuigg Hall (105 W Woodruff Ave, Columbus, OH 43210-1117). The buildings are located in the central core of campus which is highly populated.
The building to remain will need to be shored and separated from Watts along with disconnection and termination of any utility and mechanical pipes that may feed the building from MacQuigg.
The scope of work to include building demolition, abatement, MEP / Electrical disconnects, site work, and shoring of building to remain. Upon completion of the demolition, the site will need to be brought to grade and seeded. The demolition will allow for future building to be erected for the Biomedical and Materials Engineering Complex.
| 03/23/2022 06:00 PM UTC |
OSU-210440, Airport - Hangar Airpark Development
OSU Airport: Extension of Taxiway A8 and Service Road
| 03/03/2022 07:00 PM UTC |
OSU-210473 National Pan-Hellenic Council (NPHC) Plaza
This project will construct a National Pan-Hellenic Council Plaza adjacent to Hale Hall at OSU Columbus Campus.
| 03/02/2022 07:00 PM UTC |
OSU-210271 Road/Bridge Improvements BP 1
Project includes improvements to College Road between Woodruff Avenue and 18th Avenue. Improvements to College Road include installation of curb ramps, installation of bus lane, replacement or installation of sidewalk, full depth replacement of pavement, replacement of curb, lighting, and storm sewer improvements.
| 02/22/2022 02:00 PM UTC |
OSU-200101-BP 3
West Campus Infrastructure Phase 1
Bid Package 3- Provide infrastructure and lane widening for Kenny Road
| 02/21/2022 04:00 PM UTC |
OSU-210273 Infrastructure Renewal
Project includes removal of existing storm infrastructure and replacement with new infrastructure along with some new storm sewers. Project is located near intersection of Tuttle Park Place and W 17th Avenue.
| 02/18/2022 04:00 PM UTC |
OSU-220049, Outpatient Gahanna, Pelvic Health Renovation
Renovation of approximately 3,600 square feet of tenant space of the
Pelvic Health clinic located at Outpatient Gahanna. The renovation
is the conversion of an existing nuclear camera suite, restroom,
stress lab, hot lab, tech space, prep areas, sub waiting and phone
triage rooms into a PT gym with large team room. The plan converts
existing offices, reading room and echo lab into additional exam
rooms. It reworks nurses station into clean and soil rooms and adds
storage areas. The project contains several bid alternates allowing
the suite to be refreshed in the new OSUWMC finish standards.
| 02/17/2022 07:00 PM UTC |
OSU-210338, Bevis Hall - 3rd Flr SIM Center Relocation
OSU Columbus Campus: The renovation of approximately 3,692 SF of existing office space on the 3rd Floor of Bevis Hall located at 1080 Carmack Road, in Columbus, Ohio. The project scope includes the following Rooms: Base Bid: Third Floor - 317, 341, 371, 386, 387, 389, 390, 393, 394, 397, 398, X305C and X307C. The scope of the project is to create an open and collaborative work environment and upgrade finishes throughout the project area. Alternate G-1: Provide and install new paint on exposed existing concrete structure in Room 315.
| 02/15/2022 07:00 PM UTC |
OSU-210296, PAST Innovation Lab
The PAST Foundation
Interior renovations consisting of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems.
| 02/04/2022 07:00 PM UTC |