General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240592 BRT - Condensate Tank Replacement
Description The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
04/10/2025 05:00 PM UTC
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
04/16/2025 06:00 AM UTC
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty department members and their lab personnel. Suite 121 is currently fit out with single occupant research rooms and supporting mechanical, electrical, and technology infrastructure. The intent of this renovation is to remove the small research rooms and create an open environment to support new research teams. This renovation requires hazardous materials abatement, demolition, ADA compliance review, and interior finish upgrades. Mechanical and electrical design will include HVAC, electric, IT coordination, and fire alarm modifications
04/24/2025 06:00 PM UTC
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-200104
OSU HVAC Replacements FY 2020 This project will renovate and update building HVAC systems in buildings constructed after 1999.
10/20/2021 06:00 PM UTC
OSU-200666, Riffe-6th Floor Labs Renovation
OSU Main Campus - Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
10/13/2021 06:00 PM UTC
OSU-210030, Outpatient Gahanna - Neurology Renovation
Renovation of approximately 2,470 square feet of tenant space of the Neurology Suite located at Outpatient Gahanna. The renovation is the conversion of an existing infusion space into exam rooms, team rooms, and support space.
10/12/2021 06:00 PM UTC
OSU-210360, Sisson Domestic Water Loop
The Project consists of the installation of an 8-inch domestic cold waterline in the Sisson Hall parking lot that cross connects with the 20-inch OSU domestic cold waterline on the east side of Olentangy River Road. The line will be installed via a jack and bore method and will be connected to the existing OSU 20-inch OSU main domestic cold water line using a tapping sleeve per OSU BDS Division 33.
09/30/2021 06:00 PM UTC
OSU-210137, Healthy New Albany Renovation
Interior Renovation and room re-configuration from Family Practice to Behavior Health (outpatient) Practice.
08/24/2021 06:00 PM UTC
OSU-190279, Wooster - GDAL Swine Finishing
Wooster Campus: Provide and install a new prefabricated, modular building structure, site preparation and all supporting utility infrastructure.
08/24/2021 06:00 PM UTC
OSU-190122 Infrastructure Improvements 1
Replace approximately two dozen failing and non-compliant curb ramps across campus.
08/12/2021 12:35 PM UTC
OSU-200538 Orton Hall Envelope Repairs
OSU-200358 This project includes building envelope repairs to Orton Hall, including isolated masonry and below-grade waterproofing repairs, as well as roofing. The roofing scope includes repairs to the main roof flashings and drainage elements, as well as replacement of the apse roof and leakage repairs at the northeast corner.
08/06/2021 06:00 PM UTC
OSU-210119, 600 & 610 Ackerman Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
08/04/2021 06:00 PM UTC
OSU-200102 Enhanced Maintenance FY 2020
This project includes the rehabilitation of building enclosure elements at Lazenby Hall, including isolated masonry and window repairs, and replacement of the clay tile roof. The roof replacement will include new flashings and drainage elements, and reuse the clay roof tiles.
07/29/2021 06:00 PM UTC
201 - 210 of 546 Solicitations
1 2 17 18 19 21 23 24 25 54 55