General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240592 BRT - Condensate Tank Replacement
Description The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
04/10/2025 05:00 PM UTC
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
04/16/2025 06:00 AM UTC
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty department members and their lab personnel. Suite 121 is currently fit out with single occupant research rooms and supporting mechanical, electrical, and technology infrastructure. The intent of this renovation is to remove the small research rooms and create an open environment to support new research teams. This renovation requires hazardous materials abatement, demolition, ADA compliance review, and interior finish upgrades. Mechanical and electrical design will include HVAC, electric, IT coordination, and fire alarm modifications
04/24/2025 06:00 PM UTC
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OSU-190141, Sea Grant - Stone Laboratory
OSU Stone Laboratory, South Bass Island: The project will add ~3,500 sq ft of laboratory and support space to the Research Building at Peach Point on South Bass Island.
10/22/2020 06:00 PM UTC
OSU-200307, Family Medicine and Mammography - Pickerington
Renovation approximately 11,000 SF for tenant lease space on the second floor. Space to have two separate entrances for Family Medicine and Mammography. The Family Medicine space will also contain an Optometry clinic.
09/29/2020 06:00 PM UTC
OSU-200218, Celeste - Room 36 Nexus Laser Renovation (REBID)
REBID: The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
09/24/2020 06:00 PM UTC
OSU-190385, Parks-Room 145 Renovation (REBID)
OSU Columbus Campus: (REBID) Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
09/02/2020 06:00 PM UTC
OSU-200218, Celeste - Room 36 Nexus Laser Renovation
The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. The lab space will be cleanroom ISO 7 classification. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
08/27/2020 06:00 PM UTC
OSU-190385, Parks - Room 145 Renovation
OSU Columbus Campus: Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
08/18/2020 06:00 PM UTC
OSU-190881, Doan - 9 North Office Reconfiguration
3,000 square foot interior renovation providing a reconfiguration of existing administrative offices on the 9th floor of Doan Hall. New interior floor, wall, window shades and ceiling finishes are provided with corresponding upgrades to the existing mechanical, electrical power, lighting, data, fire alarm and fire suppression systems. Upgrades to the existing temperature control pneumatic and isolation values connecting to new thermostats are also a part of the scope of work if Alternates G1and H1 are accepted by the Owner. The work will be performed in 2 Phases.
08/11/2020 06:00 PM UTC
OSU-180707 Ag Admin Chiller Replacment
Remove water cooled chiller, cooling tower, condenser water pump, condenser water tank and associated piping and controls. Remove multizone air handler, piping and controls. Provide new air cooled condensing unit on roof, piping and controls. Provide new multizone air handler, piping and controls. Provide new direct digital controls. Hazardous material abatement.
08/04/2020 05:00 PM UTC
OSU-190128 Envelope Modernization
RPAC, McCorkle Pavilion and Larkins Plaza -This project will restore plazas and envelopes.
08/03/2020 06:00 PM UTC
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-02
This project will mill and fill, and improve sidewalks and curbs
07/31/2020 06:30 PM UTC
241 - 250 of 546 Solicitations
1 2 21 22 23 25 27 28 29 54 55