The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
| 04/16/2025 06:00 AM UTC |
OSU-240592 BRT - Condensate Tank Replacement
Description
The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
| 04/17/2025 05:00 PM UTC |
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-170011, Fry Hall - Optometry Clinic Entrance - Bid Package #3
Interior renovation to the limited areas of six levels of an existing 6-story academic and office building. Renovations include reconfiguration of office, conference room, and classroom areas, addition and reconfiguration of toilet rooms, and finish improvements. HVAC, lighting, fire protection, and fire alarm upgrades and improvements are included in the areas of renovation. Project is to be completed in three phases with multiple turn over milestones.
| 04/16/2019 06:00 PM UTC |
OSU-190132 Civic Space Improvements
This project will improve key gathering, social and study spaces
| 04/09/2019 06:00 PM UTC |
OSU-180723, Bradley & Paterson - Entry Hardscape Improvements
This project removes existing improvements around the north entry for Bradley and Paterson Halls and installs new improvements including sidewalk, pavers, seating walls, stairs, seating, plantings, turf, drain basins, lighting modifications, and other restoration items required to complete the work.
| 04/04/2019 06:00 PM UTC |
OSU-170816, Campbell - Teaching Kitchen Fire Suppression
OSU Main Campus: The project is a general demolition of an existing 700 plus square foot space previously utilized as a home economics type cooking space. The existing cabinets, ovens, dishwashers, garbage disposals are to be demolished and removed. All existing finishes including ceiling, flooring and walls are to be removed and replaced. The space is to be re-constructed with new casework into a demonstration type teaching kitchen. A new exhaust hood with fire suppression system is to be installed along with new MEP systems in the room as well as new exhaust equipment on the roof. Existing shafts are to be re-used for the exhaust system in the neighboring classroom. Work in the neighboring classroom will need to be completed around the scheduled classroom activities. All new kitchen equipment is to be provided and installed as part of this contract.
| 04/03/2019 06:00 PM UTC |
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms
RENOVATION OF 2,003 SF EXISTING 2ND FLOOR OF THE HOSPITAL. WORK INCLUDING DEMOLITION, FINISHES (FLOOR, ROOM BASE, PAINT, CEILINGS), RIGID PLASTIC WAINSCOT, CORNER GUARDS, STRUCTURAL AND RELATED MEP ITEMS. WORK ALSO INCLUDES NEW HVAC FOR BRONCH ROOMS.
| 03/28/2019 06:00 PM UTC |
OSU-190063 Arwell Chiller Replacement
The Project consists of replacement of a nominal 350 ton water-cooled centrifugal chiller with a new unit of the same capacity. Existing pumps and cooling tower to remain. The University has pre-purchased the chiller for installation by the contractor. Project includes enlarging an existing wall opening to get new chiller into the
Penthouse.
| 03/20/2019 06:00 PM UTC |
OSU-190194, Drinko - Saxbe Auditorium Renovation
OSU Main Campus: Interior renovation of the existing auditorium to meet the current needs of the college. New seating, accessibility modifications, and revised mechanical, electrical, and technology systems associated with the renovation.
| 03/14/2019 06:00 PM UTC |
OSU-180784, Lima - Campus Paving Improvements
OSU Lima: Replace Parking Lot C at OSU Lima Campus by process of reclaiming asphalt base. Alternate 1 will include full depth asphalt replacement in Parking Lot C in lieu of reclaiming asphalt base per base bid. Alternate 2 will include improvements to the Public Service Building Entry. Alternate 3 will include removal and replacement of the drive connecting Parking Lot C and Parking Lot A. Alternate 4 will include pavement repair in Parking Lot A.
| 03/05/2019 07:00 PM UTC |
OSU-190144, Airport - North Runway Rehabilitation Phase 2
OSU Airport: The scope of work for the Base Bid includes items to reconstruct Runway 9L and 27R ends. The work associated with this bid includes, but is not limited to unclassified excavation, placement of crushed aggregate base course, placement of plant mix bituminous pavement, bituminous pavement removal, bituminous surface removal, temporary soil erosion control, permanent erosion control, installation of drainage structures and pipe, and mulched seeding.
The scope of work for Alternate Bid 1 includes items required to repair Taxiway G. The work associated with the bid includes but is not limited to microsurfacing of Taxiway G.
The scope of work for Alternate Bid 2 includes items required to rehabilitate Taxiway F. The work associated with the bid includes but is not limited to bituminous surface removal, pavement crack repair, placement of plant mix bituminous pavement, temporary soil erosion control, and mulched seeding.
| 03/01/2019 07:00 PM UTC |
OSU-160935, Jameson Crane-Surgical Skills Lab-REBID
REBID: The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
| 02/26/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.