General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240592 BRT - Condensate Tank Replacement
Description The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
04/10/2025 05:00 PM UTC
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
04/16/2025 06:00 AM UTC
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty department members and their lab personnel. Suite 121 is currently fit out with single occupant research rooms and supporting mechanical, electrical, and technology infrastructure. The intent of this renovation is to remove the small research rooms and create an open environment to support new research teams. This renovation requires hazardous materials abatement, demolition, ADA compliance review, and interior finish upgrades. Mechanical and electrical design will include HVAC, electric, IT coordination, and fire alarm modifications
04/24/2025 06:00 PM UTC
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OSU-160982 Roof Repair and Replacements Ph 2
Roof repairs and replacements at (04) locations: • 1100 Kinnear • Service Building Annex CABS Bus Garage • Enarson Classroom Building • Central Service Building
06/14/2018 05:00 PM UTC
OSU-160340, Vet Hospital - Expand Oncology (REBID)
Renovation of the existing Veterinary Oncology Suite on the ground floor of the OSU Veterinary Hospital. The project includes demolition of existing walls, ceilings and finishes; new walls, doors, millwork, ceilings, lighting, finishes, electrical and HVAC work.
06/11/2018 06:00 PM UTC
OSU-150019, Wooster Farm Operations Improvements (REBID)
Wooster Campus: Project includes new construction of the Centralized Farm Operations Facility and the Grace Drake Learning Laboratory Facility. New work includes new structures, slabs, roofs, exterior facades, interior work, mechanical, electric, pluming, and site. Refer to project narratives for further descriptions.
06/05/2018 06:00 PM UTC
OSU-160793 Parks-Pharmacy Practice Lab
Renovation of labs 233, 233A, 233C, 233E, 241, 243, 243A, and 246 on the second floor of Parks Hall into Pharmacy Practice Labs, plus renovations of corridors X207C and X208C.
05/30/2018 06:00 PM UTC
OSU-170533, Lincoln Tower 14th Floor Renovation
Lincoln Tower 14th Floor Renovation 1800 Cannon Drive, Columbus, OH 43210 Complete renovation of the 14th floor of Lincoln Tower.
05/15/2018 06:00 PM UTC
OSU-180042 Atwell - Entrance & First Floor Renovation
This project will renovate the first floor entry, lobby, restrooms and corridors.
05/08/2018 06:00 PM UTC
OSU-180169, Newark - Campus Boiler Replacements
Newark Campus: Replace the two Kewanee heating hot water (HHW) boilers and make improvements to the HHW pumping and piping arrangement in the boiler room.
04/30/2018 06:00 PM UTC
OSU-170233 Riffe - First Floor Renovation
This project will build out shelled space on the 10th and 12th floors to create ICU beds.
04/25/2018 06:00 PM UTC
OSU-160920, Kunz-Brundige Franklin County Extension Building
OSU Main Campus: The Kunz-Brundige Franklin County Extension Building will be a newly constructed single-story, 10,475 square foot building located on an agriculture site. It will house offices, a multipurpose room, a gardener’s lab, a demonstration kitchen, pantry, and support spaces. A sloped green roof with deep overhangs will direct storm water runoff to a landscaped basin adjacent to a partially paved parking lot.
04/24/2018 06:00 PM UTC
OSU-170619 Dodd Elevator Upgrades
This project will modernize the machinery, controls and cabs for elevators #1, #2 and #3 in Dodd Hall.
04/17/2018 06:00 PM UTC
361 - 370 of 546 Solicitations
1 2 33 34 35 37 39 40 41 54 55