The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240592 BRT - Condensate Tank Replacement
Description
The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
| 04/10/2025 05:00 PM UTC |
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
| 04/16/2025 06:00 AM UTC |
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-170534, Lincoln - Exterior Repairs
Exterior Concrete repairs; removal and replacement of existing concrete coating; removal and replacement of existing joint sealants; spot tuckpointing/repairs to masonry.
| 03/20/2018 02:00 PM UTC |
OSU-170752, WHAC - East Wing Renovation
Renovation of a portion of the existing building, construction of an addition, and expansion of the mezzanine into existing high volume spaces. Renovations will include protection, selective demolition, and new construction including but not limited to new structure, roof, walls, doors, finishes, casework, countertops, kitchen equipment, fire suppression, plumbing, fixtures, HVAC, exhaust, lighting, electrical, fire alarm, security and data.
| 03/14/2018 05:00 PM UTC |
OSU-170872, Morehouse Pavilion - First Floor MRI (REBID)
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
| 03/13/2018 06:00 PM UTC |
OSU-160805 Mendenhall-Indoor Air Quality Improvement
The project consists of the replacement of 27 existing fume hood exhaust fans with 6 new fume hood exhaust fans with high velocity discharge. Existing ductwork will be connected in manifolds to new fans. Existing motor starters will be replaced with new motor starters fed from existing electrical panels.
| 03/13/2018 05:00 PM UTC |
OSU-160420, WMC East - West 4th Fl Renovation (REBID 2)
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
Specific Project Experience Requirement: All bidders are required to have previous experience with ICU renovations. All contractors and sub-contractors shall be required to be fully badged prior to commencement of any work. All contractors are subject to rules and regulations set forth by the Wexner Medical Center Standards found in Division 1 of the project manual.
| 03/08/2018 06:00 PM UTC |
OSU-160162, Evans - Polymer Synthesis Facility
Main Campus: This project will convert Room 4073 of Evans Laboratory into a Polymer Synthesis Lab.
| 03/07/2018 07:00 PM UTC |
OSU-170502 Arnoff - Hotwater Heater Replacement
Base Bid Work consists of replacement of two steam-fired domestic hot water heaters with two gas-fired domestic hot water heaters. This work shall be done without interrupting supply of domestic hot water to the building. Alternate 1 Work consists of providing a desuperheater system to cool superheated steam to saturated temperature for use in autoclaves and condensate pumps. This work
shall be done with minimal interruption of steam supply.
| 03/01/2018 06:00 PM UTC |
OSU-180054 Curl Hall - Patio Upgrades
The construction of an outdoor kitchen facility, overhead canopy and Food Service equipment.
| 02/23/2018 03:00 PM UTC |
OSU-150661 Bolz-Central Svc-Window Replacement BP3 Converse Hall
OSU-150661 - Bolz-Central Svc-Window Replacement
Bid Package No.3 Converse Hall
The demolition and hazardous material abatement of the original steel and plate glass window system and wood window units on three levels.
The replacement of windows units. System consists of clear glazing sections with single-hung vinyl windows.
The temporary removal and reattachment of existing window treatments including blinds and shades.
The patching of interior finishes adjacent the replacement window units including painting touch-up, aluminum break metal trim where applicable.
Replacement of existing AC window Units with a standardized unit.
Replacement of gutters and downspouts storm water drainage systems.
Patching and painting of exterior parged concrete, CMU walls, hollow metal doors and frames, and woodwork.
| 02/21/2018 06:00 PM UTC |
OSU-160890, Marion - Electrical, Lighting and HVAC Upgrades (Bid Package #2)
Marion Campus: This project consists of upgrading existing roadway, parking lot, walkway, building mounted, and landscape lighting on the OSU Marion / Marion Technical College Campus to new LED fixtures. This upgrade includes replacing some of the associated light poles as well as controlling all of the new pole mounted lights with the campus's existing lighting control system. The rest of the project scope includes the replacement of a boiler system at the Alber Student Center and the addition of a new air terminal unit (VAV box) at Bryson Hall, Room 199A.
| 02/14/2018 07:00 PM UTC |