OSU-240592 BRT - Condensate Tank Replacement
Description
The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
| 04/10/2025 05:00 PM UTC |
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
| 04/16/2025 06:00 AM UTC |
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-160535 Doan Nuclear Medicine Renovation
This project will redesign and renovate the waiting room, injection rooms, radiopharmaceutical storage and clean supply storage areas on the second floor.
| 08/22/2017 06:00 PM UTC |
OSU-170391 Transportation Plan Implementation BP5
BP #5 includes construction of two new soccer fields adjacent to Carmack Road.
| 08/08/2017 06:30 PM UTC |
OSU-160770
OSU Vet Hospital Simulation Lab - This project will renovate space to create a lab where students can practice techniques.
| 08/08/2017 06:00 PM UTC |
OSU-120059 Cannon Drive Relocation - Phase 1
Cannon Drive Relocation - Phase 1
| 07/12/2017 06:30 PM UTC |
OSU-160029 PAES - Sanitary Lift Station
PAES - Sanitary Lift Station
| 07/11/2017 06:00 PM UTC |
OSU-160928, Lima - Reed Hall Roof Replacement
OSU Lima Campus: Project includes a complete tear-off of the roof membrane and insulation, down to metal deck of roof areas indicated and replacement with a new single-ply roof membrane and insulation. Project also includes limited masonry work at through wall flashings, lightning protection and limited fall protection.
| 07/06/2017 06:00 PM UTC |
OSU-160969 Doan Public Elevators 4-7 REBID
This project will replace elevator controls and refurbish the cabs.
| 07/06/2017 06:00 PM UTC |
OSU-140356 Mirror Lake Enhancements
Improvements associated with the Mirror Lake renovations, including planting, hardscape, lake edge adjustments, quick drain installation and historic grotto re-construction.
| 07/05/2017 03:00 PM UTC |
OSU-170419 Rhodes-11W Observation Unit
OSU Rhodes 11W Observation Unit Interior Upgrades to include selective demolition, interior partitions and finishes, cabinetry and doors as well as supporting work on fire protection, plumbing, mechanical and electrical systems.
| 06/29/2017 06:00 PM UTC |
OSU-170011 Fry Hall Optometry Clinic Entrance
This project will renovate the entrance, both inside and out,
of the clinic in Fry Hall. The project includes spaces in the
basement and first floor of the original portion of the
building.
| 06/28/2017 06:00 PM UTC |