OSU-240592 BRT - Condensate Tank Replacement
Description The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
04/10/2025 05:00 PM UTC
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
04/16/2025 06:00 AM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-150012 Elevator Safety Repair and Replacements BP1
The work consists of the modernization of four (4) traction elevators and one (1) hydraulic elevator in Dreese Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
07/13/2016 05:00 PM UTC
OSU-160203, Newark - Founders Administrative Office
The project scope covers the renovation of existing interior spaces for a new Executive Office Suite for the Dean of The Ohio State University, Newark Campus. The areas to be remodeled comprise approximately 1,550 square feet. Existing walls, doors, finishes, electric and HVAC systems will be removed.
07/11/2016 06:00 PM UTC
OSU-150015 Plumbing Repair - RPAC Steam and Hot Water
RPAC Plumbing Repairs
06/13/2016 06:30 PM UTC
OSU-150626 Ag Admin - Renovate 1st & 2nd Floor Offices
Ag Admin - Renovate 1st & 2nd Floor Offices: Demolition and renovation of the Ag Admin second floor to create a new Administrative Suite for the Business Office and Student Services.
06/08/2016 07:00 PM UTC
OSU-108006 Hot Water Pipe Upgrades (REBID)
Installation of 12 domestic water systems (3 heating water, 5 electric, 4 natural as) to facilitate the decentralization of 17 buildings from the campus domestic hot water system loop from McCracken. Alternate 1, adds 1 heating water system and includes extensive tunnel work Alternate 2 add 4 electric system
06/06/2016 06:00 PM UTC
OSU-160070 FAWCETT CENTER - BALLROOM CEILING AND LIGHTING
Renovation of the Fawcett Center Ballroom ceiling and lighting.
06/01/2016 06:00 PM UTC
OSU-150017 Electrical Infrastructure Improvements
This project will install 3 transformers and 3 primary switches at various locations on main campus and paint and repair the concrete at the OSU substation
05/24/2016 05:00 PM UTC
OSU-150009 Roof Repair and Replacement
Roof Repair and Replacement Agricultural Engineering Building Maintenance Building
05/20/2016 05:30 PM UTC
OSU-138009 Steam and Condensate Systems Upgrades Phase 3 BP2 (South Neil Tunnel)
This project performs structural repairs, replaces condensate piping, and completes other utility improvements to the South Neil Avenue tunnel from south of 17th Avenue to just south of 12th Avenue westbound in the base bid.
05/19/2016 05:00 PM UTC
OSU-150345 Harding Hospital - Elevator Controls
This project will upgrade the elevator controls.
05/16/2016 05:30 PM UTC