OSU-240592 BRT - Condensate Tank Replacement
Description The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
04/10/2025 05:00 PM UTC
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
04/15/2025 06:00 PM UTC
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
04/16/2025 06:00 AM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-140680 Doan Dialysis Renovation and Relocation
This project will move Dialysis from 9W Rhodes to 10W Doan.
03/23/2016 06:30 PM UTC
OSU-150473, Bradley - Elevator Modernization
The Work consists of modernization of an existing overhead traction type, 5-stop elevator located at Bradley Hall on Ohio State University’s Columbus campus. The project will update the elevator including cab, hoistway equipment, machine room equipment and controls, and necessary HVAC and electrical upgrades to support the new elevator and to meet current code requirements.
03/23/2016 05:00 PM UTC
OSU-150513 CCCT- James Family Resource Ctr
This project will fit out shelled space on the ground floor for the James Family Resource and Welcome Center.
03/21/2016 05:30 PM UTC
OSU-150729, Coffey Road Lighting
This project installs new athletic field lighting for the Coffey Road athletics fields.
03/15/2016 05:00 PM UTC
OSU-110215 Street and Bridge Maintenance Phase 1 BP6
This project will preform street and bridge maintenance across campus
03/02/2016 06:00 PM UTC
OSU-150018 Emergency Generator Replacement
This project will replace emergency generators on campus. Exact replacements will be determined during planning/design phase.
03/01/2016 06:00 PM UTC
OSU-150139 Kuhns Hail Damage Repair
This project will completely replace 27 squares of roof.
02/26/2016 07:00 PM UTC
OSU-081049 Selected Tunnel Replacement Projects BP 2
This project will replace tunnel sections
02/17/2016 06:00 PM UTC
OSU-150030, Marion Roof and Electrical Repairs
Roof and Electrical Repairs on the OSU Marion Campus. The buildings associated with the project are Alber Student Center, Morrill Hall and Technical Education Center.
02/05/2016 07:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement
This project will replace the windows in both buildings.
02/04/2016 07:30 PM UTC