OSU-240592 BRT - Condensate Tank Replacement
Description
The steam-powered condensate receiver tank in the vault outside Biomedical Research Tower (BRT) shall be demolished. A new stainless steel condensate receiver packaged skid including electrically powered pumps and piping is specified to be installed in the mechanical room 0190M and reconnected to the BRT utility system.
| 04/03/2025 05:00 PM UTC |
OSU-210266 Fire System Replacements
Replace/Modify fire alarm systems in (5) University Buildings.
| 04/09/2025 06:00 AM UTC |
OSU-230397 - East Main X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
OSU-230379, Rhodes - S229 X-Ray Replacement
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 04/15/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-150418 Compressed Natural Gas Station
Plans, elevations, sections, details, and schedules
| 02/02/2016 07:00 PM UTC |
OSU-150189, Scott Lab-Instructional Lab
Ohio State University Main Campus. The Project renovates portions of the lower level, first and second floor of the west building of Scott Laboratory.
| 02/02/2016 06:00 PM UTC |
OSU-160091, WHAC - Air Handler Replacement
This project will replace the air handler for the Woody Hayes Athletic Center.
| 01/13/2016 06:00 PM UTC |
OSU-081056 South Campus Sewer Separation and Site Improvements REBID
REBID - construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
| 01/13/2016 06:00 PM UTC |
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
| 12/10/2015 07:00 PM UTC |
OSU-081049 Selected Tunnel Replacement Projects - BP2
This project will replace tunnel sections in order of priority as shown below. Phasing of each construction segment will be determined during the design stage. T-1 Beneath College Road between Page Hall and Hagerty Hall
| 12/04/2015 07:00 PM UTC |
OSU-130331 University Hospitals East - Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions.
| 12/04/2015 06:30 PM UTC |
TEST
This is a test.
| 12/02/2015 07:45 PM UTC |
OSU-100652 Various Building Demolitions Phase 2
Demolition of up to five (05) buildings noted as KRC A, B, C, D, and E located at The Ohio State University Campus in Columbus, Ohio. Work includes abatement; complete removal of all foundations, footings, etc.; proper back-fill and compaction; adjustments to site lighting and site utilities; site grading and repair.
| 11/19/2015 03:00 PM UTC |
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
| 11/12/2015 07:00 PM UTC |