General Info

Business Logo

City of Fairborn, OH

44 W Hebble Ave,, Fairborn,, OH 45324
(937) 754-3055

The Engineering Division plans, designs, maintains, and manages all infrastructure within the City rights-of-way in order to provide the general public with safe, efficient, and quality roadways, sidewalks, utilities, and mapping (GIS) information.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Broad Street Improvements - Phase 3 PID 113660
The City of Fairborn will receive bids for this project which includes the following work: • Resurfacing with pavement repair • Installation of new of curb and gutter • Replacement of storm sewer • Addition of a sidewalk and a shared-use path on Broad Street (SR 444) from Central Avenue to Sandhill Road. DBE Goal 8%
04/08/2025 05:00 PM UTC
Broad Street Improvments - Phase 3 PID 113660
The City of Fairborn will receive bids for this project which includes the following work: • Resurfacing with pavement repair • Installation of new of curb and gutter • Replacement of storm sewer • Addition of a sidewalk and a shared-use path on Broad Street (SR 444) from Central Avenue to Sandhill Road. DBE Goal 8%
03/07/2025 06:00 PM UTC
Chapelgate Area Drainage Improvements
This project consists of replacing and installing new storm sewer, lowering existing water main, and regrading areas within the City of Fairborn. The project area runs parallel along Spangler Road, west of the Spangler Road and W. Yellow Springs Fairfield Road location. Please note the locations listed in the "Locations" module show an approximate vicinity only. See the attached drawings for more details on project area.
11/01/2024 05:00 PM UTC
2025 CSA Program
This project includes work at properties on/adjacent to Ironwood Drive (approximately 100 addresses). The project shall be completed by the end of the 2024 calendar year. Work includes, but is not limited to: • Removal / Replacement of: Curbing (including sawing and patching) • Removal / Replacement of: ADA Compliant Curb Ramps with Detectible Warning Devices • Removal / Replacement of: Concrete Sidewalk (4”, 6”) • Removal / Replacement of: Concrete Drive Approaches (6”, 8”) After updating quantities on 9/3/24, the project estimated budget is $115,530.
09/13/2024 05:00 PM UTC
Commerce Center Blvd Resurfacing
The Commerce Center Blvd Resurfacing Projects aims to improve the roadway from Dayton Yellow Springs Rd to Garland Ave. Work includes the following: • Milling of old surface asphalt roadway. • Cold In-Place Recycling of existing asphalt roadway • Installation of hot mix asphalt • Installation of roadway striping • Maintenance of traffic for duration of project • Manhole and other various structure adjustments The project completion is August 9, 2024.
04/26/2024 05:00 PM UTC
Dayton Yellow Springs Concrete Repairs PID 117131
The City of Fairborn will receive bids for this project which includes the following work: • Concrete pavement panel replacement • Concrete joint repairs • Diamond grinding to improve rideability • New epoxy striping DBE Goal 6%
02/02/2024 06:00 PM UTC
Chapelgate Xenia Traffic Signal
The City of Fairbon will be installing a traffic signal at the intersection of Chapelgate Dr & E Xenia Dr. Work includes, but is not limited to: • ODOT standard black signal supports with mast arms o NOTE: The signal supports have been ordered by the City of Fairborn. This contract will entail installation of the supports only. • New signal cabinet and controller with UPS battery backup • LED vehicular signals with backplates • Radar detection • LED countdown pedestrian signals • Audible pedestrian pushbuttons • Temporary traffic signal installation to coincide with the opening of Sheetz Development • ADA curb ramps and updated crosswalk markings Bid items 34 to 54 are for the Temporary Traffic Signal Installation
11/17/2023 06:00 PM UTC
Ohio, Greene, South Traffic Changes Project
• Curb / Median changes on Ohio, Greene, and South Street as part of permanent traffic control adjustments.
03/28/2023 06:00 PM UTC
Broad Street Enhancement - Phase 2 PID 108266
• Reducing vehicle lanes on Broad Street and resurfacing • Installing on-street bike lanes • Widening sidewalks • Adding street trees • Adding street lighting • Applying access management principles • Adding additional decorative elements. • Installing Waterline along Broad Street DBE Goal: 8%
03/28/2023 06:00 PM UTC
Broad Street Enhancement - Phase 2 PID 108266 & Broad Street Traffic Changes
• Reducing vehicle lanes on Broad Street and resurfacing • Installing on-street bike lanes • Widening sidewalks • Adding street trees • Adding street lighting • Applying access management principles • Adding additional decorative elements. • Installing Waterline along Broad Street • Curb / Median changes on Ohio, Greene, and South Street as part of permanent traffic control adjustments. DBE Goal: 8%. This goal will only apply to the Broad Street Phase 2 work. (Bid Form 1)
02/24/2023 06:00 PM UTC
1 - 10 of 21 Solicitations
← Previous 1 3