City of Fairborn, OH

44 W Hebble Ave,, Fairborn,, OH 45324
(937) 754-3055

The Engineering Division plans, designs, maintains, and manages all infrastructure within the City rights-of-way in order to provide the general public with safe, efficient, and quality roadways, sidewalks, utilities, and mapping (GIS) information.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Chapelgate Area Drainage Improvements
This project consists of replacing and installing new storm sewer, lowering existing water main, and regrading areas within the City of Fairborn. The project area runs parallel along Spangler Road, west of the Spangler Road and W. Yellow Springs Fairfield Road location. Please note the locations listed in the "Locations" module show an approximate vicinity only. See the attached drawings for more details on project area.
11/01/2024 05:00 PM UTC
2025 CSA Program
This project includes work at properties on/adjacent to Ironwood Drive (approximately 100 addresses). The project shall be completed by the end of the 2024 calendar year. Work includes, but is not limited to: • Removal / Replacement of: Curbing (including sawing and patching) • Removal / Replacement of: ADA Compliant Curb Ramps with Detectible Warning Devices • Removal / Replacement of: Concrete Sidewalk (4”, 6”) • Removal / Replacement of: Concrete Drive Approaches (6”, 8”) After updating quantities on 9/3/24, the project estimated budget is $115,530.
09/13/2024 05:00 PM UTC
Commerce Center Blvd Resurfacing
The Commerce Center Blvd Resurfacing Projects aims to improve the roadway from Dayton Yellow Springs Rd to Garland Ave. Work includes the following: • Milling of old surface asphalt roadway. • Cold In-Place Recycling of existing asphalt roadway • Installation of hot mix asphalt • Installation of roadway striping • Maintenance of traffic for duration of project • Manhole and other various structure adjustments The project completion is August 9, 2024.
04/26/2024 05:00 PM UTC
Dayton Yellow Springs Concrete Repairs PID 117131
The City of Fairborn will receive bids for this project which includes the following work: • Concrete pavement panel replacement • Concrete joint repairs • Diamond grinding to improve rideability • New epoxy striping DBE Goal 6%
02/02/2024 06:00 PM UTC
Chapelgate Xenia Traffic Signal
The City of Fairbon will be installing a traffic signal at the intersection of Chapelgate Dr & E Xenia Dr. Work includes, but is not limited to: • ODOT standard black signal supports with mast arms o NOTE: The signal supports have been ordered by the City of Fairborn. This contract will entail installation of the supports only. • New signal cabinet and controller with UPS battery backup • LED vehicular signals with backplates • Radar detection • LED countdown pedestrian signals • Audible pedestrian pushbuttons • Temporary traffic signal installation to coincide with the opening of Sheetz Development • ADA curb ramps and updated crosswalk markings Bid items 34 to 54 are for the Temporary Traffic Signal Installation
11/17/2023 06:00 PM UTC
Ohio, Greene, South Traffic Changes Project
• Curb / Median changes on Ohio, Greene, and South Street as part of permanent traffic control adjustments.
03/28/2023 06:00 PM UTC
Broad Street Enhancement - Phase 2 PID 108266
• Reducing vehicle lanes on Broad Street and resurfacing • Installing on-street bike lanes • Widening sidewalks • Adding street trees • Adding street lighting • Applying access management principles • Adding additional decorative elements. • Installing Waterline along Broad Street DBE Goal: 8%
03/28/2023 06:00 PM UTC
Broad Street Enhancement - Phase 2 PID 108266 & Broad Street Traffic Changes
• Reducing vehicle lanes on Broad Street and resurfacing • Installing on-street bike lanes • Widening sidewalks • Adding street trees • Adding street lighting • Applying access management principles • Adding additional decorative elements. • Installing Waterline along Broad Street • Curb / Median changes on Ohio, Greene, and South Street as part of permanent traffic control adjustments. DBE Goal: 8%. This goal will only apply to the Broad Street Phase 2 work. (Bid Form 1)
02/24/2023 06:00 PM UTC
CDBG AREA IMPROVEMENTS
The goal of this project is to rehab the roadway pavement while making improvements within the right-of-way that will include but are not limited to drainage improvements, sidewalk and ADA Improvements, and minor roadway geometrical improvements. A mandatory Pre-bid Meeting is set for Tuesday, January 10, 2022 at 10:00am at the City of Fairborn Office located at 44 W. Hebble Avenue, Fairborn, OH 45324. If you wish to bid, please attend this meeting. If you attended the pre-bid meeting during the first solicitation, you do not need to attend this meeting to be eligible to bid. The Attendance sheet from the first pre-bid meeting is in the bid docs. The Completion Date for this project is set for July 31, 2023.
01/19/2023 07:00 PM UTC
CDBG Improvements Area - Phase 1
The goal of this project is to rehab the roadway pavement while making improvements within the right-of-way that will include but are not limited to drainage improvements, sidewalk and ADA Improvements, and minor roadway geometrical improvements. A mandatory Pre-bid Meeting is set for Wednesday, November 30, 2022 at 10:00am at the City of Fairborn Office located at 44 W. Hebble Avenue, Fairborn, OH 45324.
12/12/2022 03:00 PM UTC
1 - 10 of 19 Solicitations