General Info

Business Logo

Grove City, OH

4035 Broadway, Grove City, OH 43123-3001
(614) 277-3000

Grove City is proud of its rich history and superb quality of life with the conveniences of metropolitan living and the comforts of a unique, small town.

Mission:
Continuously strive to efficiently improve City services, programs and facilities. Offer the highest quality of life achievable.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Fryer Park Water Tank Repainting & Modifications
Work shall generally include: spot preparation of the interior dry coating system and a full application of an overcoat on the interior dry surfaces excluding the bottom of the bowl, an abrasive blast preparation and full coating of the exterior bottom of the bowl, two spot coating repairs in the interior wet and modification of the tank drain line. The subject tank is a 1.25 MG steel-fluted column elevated water storage tank. • Interior Dry (Excluding the bottom of the bowl): Spot power tool cleaning of failed coatings will be completed, a primer shall be applied to the spot prepared areas and the entirety of the interior dry surface shall then receive a single overcoat. This work shall only occur above the condensate ceiling level. • Interior Dry – Bottom of the bowl: Abrasive blast cleaning to SSPC-SP6; 1.0 mil angular profile and application of a primer and finish coat for the entirety of the bowl exterior. • Interior Wet – Localized repair of two failed areas through power tool preparation and spot coatings. • Tank Drain Line Modification: Replacement of the existing 2” mud/drain valve with a 4” drain valve and replacement of the connecting drain pipe with a 3” pipe.
08/11/2023 03:00 PM UTC
Holton Road Improvements
The City of Grove City, through the City Administrator, will receive sealed bids for the HOLTON ROAD IMPROVEMENTS project via Bid Express, until 11:00 a.m. local time on Aug. 4, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid • Over 16,000 S.Y. of asphalt pavement reconstruction, installation of over 8,400 L.F. of concrete curb and gutter, over 20,100 S.F. of concrete sidewalk and over 18,000 S.F. of asphalt shared-use path, over 5,200 L.F. of storm sewer, over 4,100 L.F. of water main, installation of new street lighting and a new traffic signal, and other related work. The estimated costs of construction for the work outlined in the plans and specifications for the various bids are: Base Bid: $ 7,444,900.00 In order to be considered, Contractors must submit bids on the Base Bid. Hard copies of the Contract Documents and Specifications will not be provided. Contract Documents and Specifications may be obtained from Bid Express only and at costs associated with the Bid Express service fee schedule (https://www.bidexpress.com/businesses/40946/home?agency=true). Payment for these items will not be refunded. Each bid shall contain the full name and address of each person or company interested in the same and shall be accompanied by a bond meeting the requirements of the Contract Documents and written on the form included with the Contract Documents. Each Bidder must ensure that no employees and applicants for employment are discriminated against because of race, color, religion, sex, Vietnam Era nor disabled veterans, or National origin. Schedule: The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed within four hundred eighty (480) calendar days from the City’s issuance of the Notice to Proceed for the Contract.
08/04/2023 03:00 PM UTC
Evans Center Furnace, Air Conditioners and Controls Replacement
The City of Grove City, through the City Administrator, will receive sealed bids for the EVANS CENTER FURNACE, AIR CONDITIONERS AND CONTROLS REPLACEMENT project via Bid Express, until 11:00 a.m. local time on June 26, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid • Replacement of mechanical systems and other related work located at the Evans Center, 4330 Dudley Ave. Contract Documents and Specifications may be obtained from Bid Express only and at costs associated with the Bid Express service fee schedule. Payment for these items will not be refunded. A mandatory pre-bid meeting will be held at the Evans Center, located at 4330 Dudley Avenue, Grove City, Ohio 43123 on Monday, June 12, 2023 from 8:00 a.m. to 10:00 a.m. to measure equipment, review facility location and discuss any questions potential bidders may have. Schedule: The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed between Aug. 28, 2023 and Sept. 29, 2023 during the hours of 6:00 a.m. - 5:00 p.m., Monday through Friday. Access to the Evans Center location outside of the dates and times listed above is prohibited.
06/26/2023 03:00 PM UTC
Big Splash Pool Boiler Replacement
The City of Grove City, through the City Administrator, will receive sealed bids for the BIG SPLASH POOL BOILER REPLACEMENT project via Bid Express, until 11:00 a.m. local time on June 26, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid • Replacement of the boiler system and other related work located at The Big Splash Pool, 2831 Southwest Blvd. Contract Documents and Specifications may be obtained from Bid Express only and at costs associated with the Bid Express service fee schedule. Payment for these items will not be refunded. A mandatory pre-bid meeting will be held at the Big Splash Pool on Monday, June 12, 2023 from 10:00 a.m. to 11:00 a.m. to measure equipment, review facility location and discuss any questions potential bidders may have. Schedule: The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed between Sept. 5, 2023 and Sept. 29, 2023 during the hours of 6:00 a.m. - 9:00 p.m., Monday through Friday. Access to the Big Splash Pool location outside of the dates and times listed above is prohibited.
06/26/2023 03:00 PM UTC
City Hall Boiler Replacement
The City of Grove City, through the City Administrator, will receive sealed bids for the CITY HALL BOILER REPLACEMENT project via Bid Express, until 11:00 a.m. local time on June 26, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid • Replacement of the boiler system and other related work located at City Hall, 4035 Broadway. Contract Documents and Specifications may be obtained from Bid Express only and at costs associated with the Bid Express service fee schedule. Payment for these items will not be refunded. A mandatory pre-bid meeting will be held at City Hall on Monday, June 12, 2023 from 1:00 p.m. to 2:00 p.m. to measure equipment, review facility location and discuss any questions potential bidders may have. Schedule: The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed no later than November 1, 2023. Access to the City Hall location outside of the dates and times listed above is prohibited.
06/26/2023 03:00 PM UTC
2023 Street Lighting Improvements
The City of Grove City, through the City Administrator, will receive sealed bids for the 2023 STREET LIGHTING IMPROVEMENTS project via Bid Express, until 11:00 a.m. local time on June 16, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid • Southwest Boulevard Area: This work will include the installation of 12 street lights and all related work. • Haughn Road Area: This work will include the installation of 17 street lights and all related work. Additional Bid 1 • Haughn Road Area: This work will include the retrofit of 19 existing luminaires and all related work. The estimated costs of construction for the work outlined in the plans and specifications for the various bids are: Base Bid: $ 510,500.00 Additional Bid 1: $38,000 In order to be considered, Contractors must submit bids on the Base Bid and Additional Bid 1.
06/16/2023 03:00 PM UTC
2023 Sanitary Manhole Rehabilitation
The City of Grove City, through the City Administrator, will receive sealed bids for the 2023 SANITARY MANHOLE REHABILITATION project via Bid Express, until 11:00 a.m. local time on May 12, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid • The proposed work includes the furnishing of all labor, materials and equipment for the rehabilitation of 28 sanitary sewer manholes, and the replacement of 2 existing cleanouts with new precast concrete manholes, and all other related work. The estimated cost of construction for the work outlined in the plans and specifications for the bid is: Base Bid: $ 101,325.00 Each bid shall contain the full name and address of each person or company interested in the same and shall be accompanied by a bond meeting the requirements of the Contract Documents and written on the form included with the Contract Documents. Each Bidder must ensure that no employees and applicants for employment are discriminated against because of race, color, religion, sex, Vietnam Era nor disabled veterans, or National origin. Schedule: The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed within ninety (90) calendar days from the City’s issuance of the Notice to Proceed for the Contract.
05/12/2023 03:00 PM UTC
2023 Elevator Modifications
The City of Grove City, through the City Administrator, will receive sealed bids for 2023 ELEVATOR MODIFICATIONS via Bid Express, until 10:00 a.m. local time on May 5, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: • Modernization of two elevators, including turnkey services, to comply with State code. A non-mandatory pre-bid meeting will be held at the City of Grove City’s City Hall located at 4035 Broadway, Grove City, OH 43123 on April 25, 2023 at 9:00 a.m. to review both facility locations and discuss any questions potential bidders may have. Each bid shall contain the full name and address of each person or company interested in the same and shall be accompanied by a bond meeting the requirements of the Contract Documents and written on the form included with the Contract Documents. Each Bidder must ensure that no employees and applicants for employment are discriminated against because of race, color, religion, sex, Vietnam Era nor disabled veterans, or National origin. Schedule: The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed within one hundred fifty (150) calendar days from the City’s issuance of the Notice to Proceed for the Contract, expected mid-May 2023. The work associated with the City Hall location must be completed by Aug. 31, 2023. The Bidder is required to state in full detail, with their Bid, their experience in this class of work; bids from contractors inexperienced in this particular class of work may not be considered.
05/05/2023 02:00 PM UTC
2023 Sidewalk Program
The City of Grove City, through the City Administrator, will receive sealed bids for the 2023 SIDEWALK PROGRAM via Bid Express, until 11:00 a.m. local time on Friday, Apr. 7, 2023 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid • Over 13,000 square feet of residential sidewalk removal & replacement; Over 2,500 square feet of drive approach removal, replacement, and installation; curb ramp removal, replacement, and improvements. The estimated costs of construction for the work outlined in the plans and specifications for the bid is: Base Bid: $ 371,600.00 In order to be considered, Contractors must submit bids on the Base Bid.
04/07/2023 03:00 PM UTC
2023 Community Center Feasibility Study RFP
The City of Grove City Department of Parks and Recreation, in conjunction with the Park Board, wishes to conduct a Community Center Feasibility Study including an Amenities and Programming Prioritization Survey. This survey and study should be completed in a manner that provides information for the city to make informed, educated decisions about the present and future needs of our growing community. This endeavor is an opportunity to expand on previous planning efforts, clarify our citizens’ amenity, cultural programming, and recreational programming priorities and gain insight into impacts of community and recreational centers on economic development, property values, and a range of quality-of-life issues. The proposed Community Center Feasibility Study Update will be based on previous studies and planning efforts and will include the elements outlined in the following requested services. Additionally, the proposed study should have strong identification on community partnerships including (but not limited to) the Grove City YMCA, the Grove City Kids Association, Southwestern City Schools and Regional Health Care Providers.
04/03/2023 09:00 PM UTC
21 - 30 of 57 Solicitations
1 3 5 6