General Info

Business Logo

Grove City, OH

4035 Broadway, Grove City, OH 43123-3001
(614) 277-3000

Grove City is proud of its rich history and superb quality of life with the conveniences of metropolitan living and the comforts of a unique, small town.

Mission:
Continuously strive to efficiently improve City services, programs and facilities. Offer the highest quality of life achievable.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2025 Evans Center Roof Replacement
The City of Grove City, through the City Administrator, will receive sealed bids for the 2025 Evans Center Roof Replacement via Bid Express, until 10:00 a.m. local time on April 4, 2025 and at that time and place will be publicly opened and read aloud. Grove City will neither open nor accept bids received after that time. Subject to the right of Grove City to reject any or all bids, Grove City will award contracts to the bidder(s) submitting the lowest and best bid(s). The work for which Grove City is inviting bids consists of the following: Base Bid: • Project consists of providing all labor and materials to remove and replace the Evans Center roof, located at 4330 Dudley Avenue, per the supplied specifications. The estimated costs of construction for the work outlined in the plans and specifications for the various bids are: Estimate: $100,000.00 Pre-bid Meeting: A Pre-bid meeting for all bidders will be held at the project site at 9:00 a.m. local time on March 20, 2025. Perspective prime bidders are required to attend. Schedule: The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed by August 30, 2025. ADVERTISED: Monday, March 10, 2025
04/04/2025 02:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Columbus Street Extension
Base Bid • Construction of a new roadway connecting existing Columbus Street west of Broadway to a termination point to the northwest. The proposed roadway improvements will include subgrade stabilization, full depth asphalt pavement, brick roadway, brick walks, concrete walks, landscaping and street lighting system. • Construction of a new parking lot. The proposed parking lot improvements will include construction of a new dumpster enclosure, new access drives, lighting and landscaping. • Extensive underground infrastructure including 24-inch and smaller storm sewers, underground stormwater storage chamber system, 8-inch waterline extension and utility duct bank are included in the scope of the improvement. • Construction of a new at-grade railroad crossing and removal of the existing railroad crossing on Grant Avenue. Additional Bid 1 • Construction of an additional underground stormwater storage chamber system. Additional Bid 2 • Railroad crossing improvements on Southwest Boulevard. The estimated costs of construction for the work outlined in the plans and specifications for the various bids are: Base Bid: $ 2,925,000.00 Additional Bid 1: $ 260,000.00 Additional Bid 2: $ 301,000.00 A virtual pre-bid conference will be conducted via Web-Ex at 10:00 am on September 23. Attendance at the pre-bid conference is not mandatory, but is strongly encouraged due to the coordination which must occur between this improvement and other ongoing projects. Those interested in attending the pre-bid meeting shall RSVP at least 24 hours in advance to sspencer@emht.com to receive a link to the meeting. An in-person site pre-bid meeting will be conducted specifically for work to occur within the railroad R/W. This meeting will be conducted at 10:00 am on September 24th. The meeting will commence at the intersection of Grant Avenue and Front Street. A Waiver and release of liability for the railroad will need to be completed and provided before or at the meeting to participate and enter upon railroad property. The release form is available through the Bid Express platform.
10/02/2020 03:00 PM UTC
2020 Traffic Signal and Street Lighting Improvements
Base Bid • Part 1 - Gantz Road & Southpark Place: The work will include the installation of two mast arm signal supports, four pedestrian pushbuttons, eight pedestrian signal heads, four vehicular signal heads, removal and replacement of the existing sidewalk and curb ramps, 2,500 square feet of asphalt multi-use trail, and a road widening. • Part 2 - Hoover Road & Mt Carmel Lane Intersection: The work will include the installation of four mast arm signal supports, four pedestrian pushbuttons, eight pedestrian signal heads, eight vehicular signal heads, removal and replacement of the existing sidewalk, curb ramps, and asphalt multi-use trail. • Part 3 - Scenic Way / Parkview Drive: The work will include the installation of ten street lights and all related work. Additional Bid 1 • Hoover Road & Kingston Ave: The work will include the installation of two mast arm signal supports, one pedestrian pushbuttons, two pedestrian signal heads, two vehicular signal heads, and all related work.
09/04/2020 03:00 PM UTC
61 - 62 of 62 Solicitations
1 2 3 4 5 7 Next →