General Info

Business Logo

The University of Toledo, OH

2801 W. Bancroft St. 2925 East Rocket Drive, Toledo, OH 43606
(419) 530-1427

The University of Toledo is one of just 27 public research universities in the country to offer such a comprehensive menu of academic options - 230+ undergraduate and graduate degree programs across the arts, business, education, engineering, law, medicine, natural sciences, nursing, and pharmacy. At UToledo, it's all about the possibilities and opportunities. No limitations.

At The University of Toledo, we are driven to think smarter, tackle challenges and improve lives. We are renowned for research in the areas of astronomy and astrophysics; solar energy, water quality and sustainable technologies; and cell architecture and dynamics. Other areas of unique distinction include human trafficking, disability studies, hypertension and precision medicine.

UToledo has 20 academic programs - including undergraduate, graduate, online, and professional programs that are nationally ranked by U.S. News & World Report.

UToledo is ranked among the top 100 public universities in the latest Wall Street Journal/Times Higher Education Rankings.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
5005-23-1912
DOW 1.5T MRI Replacement REPLACEMENT OF AN MRI UNIT AND ASSOCIATED EQUIPMENT WITHIN AN EXISTING PROCEDURE ROOM. ADDITIONAL SCOPE INCLUDES THE CREATION OF A REMOVABLE HATCH IN THE EXISTING ROOF TO ALLOW FOR EQUIPMENT INGRESS/EGRESS AND NEW FINISHES FOR AFFECTED SPACES.
08/08/2023 06:00 PM UTC
1130-23-315
BAS Upgrades Phase 4 This project includes Building Automation System (BAS) upgrades at Bowman-Oddy Laboratories, Lancelot Thompson Student Union, UToledo Student Recreation Center, and the Center for Creative Education. Control system components are furnished by the University's BAS system vendor for installation by the Contractor.
07/26/2023 06:00 PM UTC
1130-23-316
Elevator Safety Repairs/Replacements Phase 4 Elevator Modernization work at Gilham Hall, University Medical Center, Student Union, and Health Education Building.
07/18/2023 06:00 PM UTC
5005-23-1919
DOW Redundant UPS: Installation of UPS and associated electrical circuits. Project location is in basement floor of Dowling Hall on the Health Science Campus.
06/27/2023 06:00 PM UTC
6000-23-1913
HSC Solar Field Expansion
05/23/2023 06:00 PM UTC
1130-23-301
Underground Utility Infrastructure Improvements - Ph2
05/09/2023 06:00 PM UTC
1080-23-303
West Mall Hardscape Improvements
04/18/2023 06:00 PM UTC
1130-21-245
Reverse Osmosis Auto Watering System: Installation of Electrical and Piping systems associated with University provided Reverse Osmosis Auto Watering System (Avidity Science). Project is location in Animal Lab Area in the basement of the Health Education Building on the Health Science Campus.
04/04/2023 06:00 PM UTC
1130-23-308
Electrical System Enhancements Ph 3: Replace existing Electrical Services at Gilham Hall and Law Center on Main Campus. Relocate Generator to Law Center from Palmer. Replace existing MCC's at Health Education and Health Science building on the Health Science Campus.
03/21/2023 06:00 PM UTC
1130-23-306
Building Envelope/Weatherproofing Ph4: Project consists of replacement of existing flat roof systems with new adhered EPDM roofing, copings, flashings, roof accessories, and related work on two buildings; recover of existing flat roof systems with new adhered EPDM roofing, copings, flashings, roof accessories, and related work on one building; replacement of roof drains; installation of new scuppers; and tuckpointing of masonry. Project scope is for all work of all trades, complete, as indicated on the Drawings and specified herein in a multiple-prime contract. In addition, various alternate bid work may be included.
03/14/2023 06:00 PM UTC
11 - 20 of 62 Solicitations
2 4 5 6 7