General Info

Business Logo

The University of Toledo, OH

2801 W. Bancroft St. 2925 East Rocket Drive, Toledo, OH 43606
(419) 530-1427

The University of Toledo is one of just 27 public research universities in the country to offer such a comprehensive menu of academic options - 230+ undergraduate and graduate degree programs across the arts, business, education, engineering, law, medicine, natural sciences, nursing, and pharmacy. At UToledo, it's all about the possibilities and opportunities. No limitations.

At The University of Toledo, we are driven to think smarter, tackle challenges and improve lives. We are renowned for research in the areas of astronomy and astrophysics; solar energy, water quality and sustainable technologies; and cell architecture and dynamics. Other areas of unique distinction include human trafficking, disability studies, hypertension and precision medicine.

UToledo has 20 academic programs - including undergraduate, graduate, online, and professional programs that are nationally ranked by U.S. News & World Report.

UToledo is ranked among the top 100 public universities in the latest Wall Street Journal/Times Higher Education Rankings.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
1130-21-240
Underground Utility Infrastructure Upgrades project includes the Main Campus underground utility infrastructure which is 40-50 years old in some locations and is often compromised due to failed sections of piping system. This project will replace 1970’s era underground steam supply and condensate return lines, along with chilled water supply and return lines on Main Campus.
04/19/2022 06:00 PM UTC
0016-22-281
SU Dean's Suite Renovation: The Dean of Students Suite renovation in the Thompson Student Union will consist of movement and expansion of the actual Dean’s suite to include additional office and meeting space, as well as to improve flow for the occupants.
04/19/2022 06:00 PM UTC
REBID 1130-21-242
Accessibility/ADA Improvements and Enhancements project will address accessibility and ADA concerns involving restrooms in Carlson Library and Ritter Astrophysical Research Center (Observatory) on Main Campus.
03/22/2022 06:00 PM UTC
1130-21-242
Accessibility/ADA Improvements and Enhancements project will address accessibility and ADA concerns involving restrooms in Carlson Library and Ritter Astrophysical Research Center (Observatory) on Main Campus.
03/08/2022 07:00 PM UTC
1130-21-234
Classroom Renovations Project will include modifying classroom configuration, upgrade building systems, upgrade audio visual technology, improve network capabilities, and refresh finishes.
02/22/2022 07:00 PM UTC
5004-21-1871
UMC Emergency Power Completion of a new power distribution design for the emergency system feeder breakers (15Kv) and feeders from the Emergency Power Generator Building into the Hospital to terminate at a new double ended unit substation. Project will also include new power distribution to existing Automatic Transfer Switches (ATS) and replacing some existing ATSs along with coordination with Cummins for new sequence of operations for emergency system.
11/16/2021 07:00 PM UTC
5004-22-1881
UMC Cooling Tower Replacement Replace the existing evaporative cooling towers on roof. Demolish and remove the existing cooling towers and piping where indicated. Provide new piping and reconnections to existing condenser water loop. New electrical circuits/equipment as required for new HVAC equipment. VFDs for new 4-cell cooling tower. Modify existing building automation system controls for the towers.
11/02/2021 06:00 PM UTC
5005-22-1883
Dowling Chiller Replacement Replace an existing water cooled chiller and the associated water pump(s) as indicated. The chiller and pump(s) are being upsized. Replace piping and insulation as required to facilitate the equipment replacement. Demolish and remove the existing chiller and pump(s), and piping where indicated. New electrical circuits/equipment as required for new HVAC equipment. Modify existing building automation system controls.
11/02/2021 06:00 PM UTC
1130-21-247
Wireless Infrastructure Upgrades This project includes replacement of wireless access points in various locations on both campuses. This portion of the project is for installation of owner provided equipment. Existing equipment is no longer able to support the high volume of this service need. A large portion of current equipment is at end-of-life by manufacturer and current software versions are no longer supported on the equipment.
10/26/2021 06:00 PM UTC
REBID 1130-21-240
Underground Utility Infrastructure Improvements Project includes the Main Campus underground utility infrastructure which is 40-50 years old in some locations and often compromised due to failed sections of the piping system. This project will replace 1970’s era underground steam supply and condensate return lines, along with chilled water supply and return lines on Main Campus.
10/12/2021 06:00 PM UTC
31 - 40 of 62 Solicitations
1 2 4 6 7