General Info

Business Logo

The University of Toledo, OH

2801 W. Bancroft St. 2925 East Rocket Drive, Toledo, OH 43606
(419) 530-1427

The University of Toledo is one of just 27 public research universities in the country to offer such a comprehensive menu of academic options - 230+ undergraduate and graduate degree programs across the arts, business, education, engineering, law, medicine, natural sciences, nursing, and pharmacy. At UToledo, it's all about the possibilities and opportunities. No limitations.

At The University of Toledo, we are driven to think smarter, tackle challenges and improve lives. We are renowned for research in the areas of astronomy and astrophysics; solar energy, water quality and sustainable technologies; and cell architecture and dynamics. Other areas of unique distinction include human trafficking, disability studies, hypertension and precision medicine.

UToledo has 20 academic programs - including undergraduate, graduate, online, and professional programs that are nationally ranked by U.S. News & World Report.

UToledo is ranked among the top 100 public universities in the latest Wall Street Journal/Times Higher Education Rankings.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
1130-21-232
Building Envelope/Waterproofing project includes roof replacements and associated work at campus locations: Health Education Building, Bowman-Oddy Labs, Center for Sculptural Studies, Ritter Planetarium. The project also includes window replacement and associated work, and exterior facade cleaning at Ritter Planetarium.
07/20/2021 06:00 PM UTC
1130-21-233
Mechanical System Improvements project will involve replacement of air handlers, exhaust fans, and unitary equipment. Replacements will reduce maintenance, improve indoor air quality, and minimize utility use. Energy reduction and efficiencies will be included. The project will involve several buildings on Main Campus and Health Science Campus.
07/13/2021 06:00 PM UTC
5004-21-1876
The MRI Replacement project includes renovations to the MRI suite to coincide with the replacement of the 3T MRI equipment.
07/06/2021 06:00 PM UTC
5002-21-1872
The Mulford Library Renovation Project will renovate the 4th and 5th Floors of the library. The scope includes the conversion of former stack areas to individual study carrels and group study areas. Renovations will also include the computer lab, public entry and service desk, central resource room, restrooms to address accessibility issues, along with furnishing upgrades.
06/22/2021 06:00 PM UTC
5050-21-1870
Laboratory Incubator Center Renovation Project Project will create four renovated laboratories, along with two support spaces and one office in the Laboratory Incubator Center on the Health Science Campus. The scope will involve the creation of growing laboratories, which will include removal of countertops, installation of new plumbing fixtures, new electrical outlets, and a new HVAC so each individual lab can control temperature and humidity.
06/15/2021 06:00 PM UTC
5012-21-1875
Comprehensive Care Center Roof Replacement Project -- Furnish and install a fully adhered or self-adhered, 060 MIL EPDM (Black) unreinforced membrane roofing system on both roof areas with 30-year detailing.
06/08/2021 06:00 PM UTC
1130-21-237
Electrical System Enhancements On the University’s Main Campus, the main electrical switchgear and transformers will be replaced in Bowman-Oddy and Wolfe Hall. On the University’s Health Science Campus, four motor control centers will be replaced in the Health Education Building.
05/25/2021 06:00 PM UTC
0036-21-241
Transportation Center Building Demolition: This project includes the complete building and foundation demolition and removal of the Transportation Center Building on the main campus of The University of Toledo. The building is approximately 20,784 square feet and consists of office space, support areas and a small basement. Existing utilities to the building are to be removed and capped and the site to be filled and seeded. The successful bidder will also be responsible for the asbestos/universal hazardous waste removal associated with this building. The demolition will also include sidewalk areas as well as courtyard asphalt. The area will be converted to green space after the demolition.
04/27/2021 06:00 PM UTC
1080-21-239
Centennial Mall Hardscape Improvements Project is for replacement/improvements of main access road, sidewalks, and plaza spaces within the Centennial Mall on campus. The Project also involves some landscape plantings.
04/06/2021 06:00 PM UTC
0002-20-223
Ancient DNA Lab Renovations This project entails the conversion of an existing storage room into a three room clean lab environment supporting DNA research. Each room will require additive environmental controls as you proceed through the suite, and the DNA extraction process. Beyond the environmental requirements the lab will not require specialty utilities other than standard support within an essentially dry research lab.
03/23/2021 06:00 PM UTC
51 - 60 of 62 Solicitations
1 2 3 4 6