Lane County General Conditions for Construction - 2024 (967 KB)
Lane County General Conditions for Construction - 2024
CompareLaneCountyToODOT_GeneralConditions.pdf (1.28 MB)
Comparison of Lane County 2024 General Conditions to ODOT
LPA QualityAssuranceProgram - 2025.pdf (2.11 MB)
Local Program Agency Quality Assurance Plan (LPA-QAP)
Bid Express Instructions (1.13 MB)
How to submit a bid on Lane County projects and frequently asked questions.
4 Documents

Upcoming Solicitations

Number Deadline
24/25-16-ECS Big Creek Road Culvert Replacement at N. Fork Siuslaw
See Project Information Section for Description.
04/22/2025 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
22/23-07-RFP OR-225: OR-126 to end of City jurisdiction (Springfield) ***Re-posted***
***Due to a time zone error with the previous solicitation, this is a re-posting of the solicitation with the deadline extended by one week*** OR-225: OR-126 to end of City jurisdiction (Springfield) Request for Proposal This project will develop a comprehensive design concept for the OR-225 (Franklin Blvd) corridor that improves safety and accommodates all modes of transportation. The corridor currently lacks bicycle, pedestrian, transit, stormwater, and intersection traffic control facilities. The project includes elements such intersection layout and right-of-way envelope, and potential re-alignment of an intersecting street. Traffic roundabouts are proposed at E 19th Ave, Nugget Way, and in the vicinity of the southern end of the project. Additional elements include protected bicycle facilities, lighting, and a center median and landscaping that will incorporate stormwater facilities. The design concept will also determine the future design for the underpass at the Union Pacific Railroad crossing just north of E 19th Ave. The project includes environmental (NEPA) analysis for the project envelope. The project limits are OR-126 (also Franklin Blvd) to the north and approximately milepoint 0.87 approaching a railroad overpass to the south. The project length is approximately 4,400’. This RFP is a Qualifications Based Selection (QBS) with Federal Highway Administration (FHWA) Funding. A DBE participation goal of 8.5% has been assigned for the Contract.
10/27/2022 10:00 PM UTC
22/23-07-RFP OR-225: OR-126 to end of City jurisdiction (Springfield)
OR-225: OR-126 to end of City jurisdiction (Springfield) Request for Proposal This project will develop a comprehensive design concept for the OR-225 (Franklin Blvd) corridor that improves safety and accommodates all modes of transportation. The corridor currently lacks bicycle, pedestrian, transit, stormwater, and intersection traffic control facilities. The project includes elements such intersection layout and right-of-way envelope, and potential re-alignment of an intersecting street. Traffic roundabouts are proposed at E 19th Ave, Nugget Way, and in the vicinity of the southern end of the project. Additional elements include protected bicycle facilities, lighting, and a center median and landscaping that will incorporate stormwater facilities. The design concept will also determine the future design for the underpass at the Union Pacific Railroad crossing just north of E 19th Ave. The project includes environmental (NEPA) analysis for the project envelope. The project limits are OR-126 (also Franklin Blvd) to the north and approximately milepoint 0.87 approaching a railroad overpass to the south. The project length is approximately 4,400’. This RFP is a Qualifications Based Selection (QBS) with Federal Highway Administration (FHWA) Funding. A DBE participation goal of 8.5% has been assigned for the Contract.
10/20/2022 04:00 PM UTC
22/23-04-PARKS Fern Ridge Water Tank Construction
This project will add four - 5,000 gallon tanks next to an existing 20,000 gallon concrete reservoir and plumb the new tanks together to act as a single reservoir. Installation of the new tanks will require excavation and placement of crushed rock to support the tanks. Eco Blocks are required to retain adjacent ground due to the excavation depth for the reservoirs. Pipe connections are required to integrate the new tanks with the existing tank and drain manhole. The estimated project cost range for the work described is $100,000 to $150,000.
10/11/2022 05:00 PM UTC
22/23-05-LEC Lane Events Center - Convention Center Door Replacement
Convention Center interior door and hardware replacement of fire rated doors. Note doors are tied into the building fire alarm system and the work includes associated electrical and low voltage work. Work also requires coordination with a separate access control upgrade project being run by Owner that affects some of the doors/hardware being replaced as well as other doors in the facility. Additionally, there is a roll down door for which emergency egress controls are to be added. The estimated project cost range for the work described is $100,000 to $300,000.
10/04/2022 05:00 PM UTC
22/23-03
Maxwell Rd. ADA Improvements The approximate quantities are: cold plane pavement removal 2 inch deep, 1,200 square yards; level 3, ½ inch, ACP Mixture, 350 tons; asphalt concrete pavement repair of various depths, 250 square yards; concrete curbs of various types, 400 feet; driveways and walks, 2,200 square feet; traffic signal modification – Maxwell Road and Grove Street Intersection, lump sum; and all other work called for in the plans and specifications. Estimated cost range: $350,000 to $450,000. Class of Work: This is a Lane County Project. No Federal Aid funds are involved. DBE 0%
09/13/2022 05:00 PM UTC
22/23-01 RFP
The work includes site investigation, design alternative analysis, preliminary design and construction cost estimate for mitigating pavement failures and slides along Sweet Creek Road at and near M.P. 1.9. The contract is expected to be for a 6 month period from 9/1/22 through 3/1/22. The estimated range of costs for the services required under this RFP is between $50,000 to $100,000.
08/02/2022 09:00 PM UTC
22/23-02
Mercer Lake Road Paving Lane County, Oregon July 2022 Engineer's Estimated cost range: $150,000 to $200,000. The Class of Work for this Project is: Asphalt Concrete Paving and Oiling DBE %0
07/26/2022 05:00 PM UTC
21/22-12
Territorial Hwy Improvements - Kruger Park Rd to Fir Grove Ln Briefly, the work of the RFP includes designing and preparing construction drawings and specifications for pavement preservation improvements, partial road widening, culvert replacement, and related improvements for 3.90 miles of Territorial Highway. The estimated range of costs for the services required under this RFP is $300,000 to $400,000.
04/28/2022 10:00 PM UTC
21/22-11
Laura St Upgrade (Springfield) Request for Proposal This project will construct street improvements on Laura St, including sidewalks, ADA ramps, bike lanes, curbs, stormwater facilities, and new pavement. It also includes replacing an existing 36” concrete stormwater pipe with an arch culvert. The segment to be improved is approximately 1,300’ long. The services required under this RFP include engineering design and studies/permitting necessary to obtain NEPA approval and clearances, obtain cultural/historic and archeological clearances, and prepare bidding and contract documents. This RFP is a Qualifications Based Selection (QBS) with Federal Highway Administration (FHWA) Funding. A DBE participation goal of 8.5% has been assigned for the Contract.
04/21/2022 10:00 PM UTC
21/22-06
ADA Pedestrian Improvements Lundy Elementary School - Sidewalks W. Boundary Road & E. Main Street Engineer's Estimate: $600,000 to $800,000 Class of Work: Earthwork and Drainage or Asphalt Concrete Paving and Oiling or Miscellaneous Highway Appurtenances.
03/29/2022 05:00 PM UTC