City of Newark, Ohio
40 West Main Street, Newark, OH 43055
(740) 670-7727
40 West Main Street, Newark, OH 43055
(740) 670-7727
Name * | Description | |
---|---|---|
NewarkStandardConstructionDrawings_July2018.pdf (1.16 MB) | ||
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Newark OH - Street Materials - 2023
This is for the PURCHASE of Street MATERIALS only.
| 03/10/2023 05:00 PM UTC |
Newark OH - Chemicals - 2023
This is for the PURCHASE of Water/Wastewater Treatment CHEMICALS only.
| 03/10/2023 05:00 PM UTC |
RFQ for Consultant Services for Brownfield Remediation at 217 S. 21st St., Newark, OH, 43055
The City of Newark is soliciting qualified firms for the provision of professional services to perform Phase I and Phase II property assessment activities. This work will be done at the former Quality Chemicals Company, 217 S. 21st St., Newark Ohio 43055.
See attachment for all information, including; scope of services, where to direct questions, and how to submit a package.
| 03/07/2023 09:00 PM UTC |
2022-02; Concrete Maintenance Project
This project consists of: approximately 190 cubic yards of concrete and associated work for curb ramps, sidewalks, and curbing at various locations.
Engineer's estimate of probable cost is available in the Bid Documents.
| 02/13/2023 05:00 PM UTC |
2018-22; E. Church St. Enhancement & Alley Rehab Project
This project consists of: streetscaping of one block of street; including sidewalk, lighting, landscaping, hardscaping, curb & gutter, and minor storm work; along with the reconstruction of 3 alleys.
Engineer's estimate of probable cost is available in the Bid Documents.
| 02/13/2023 05:00 PM UTC |
2022-03; 2022 Small Drainage - Stormwater Improvements
This project consists of: approximately 1,000 feet of conduit with associated structures and pavement repairs at 3 separate locations.
| 12/15/2022 05:00 PM UTC |
2022-29; South 11th Street Improvements
This project consists of improvements to approximately 1,000 feet of roadway; including widening for a turn lane and parking areas, as well new sidewalks and minor storm work.
| 12/15/2022 05:00 PM UTC |
2022-3 City of Newark Lead Water Service Replacement #2
This Project includes 200 lead and/or galvanized water service lines to be replaced. The work will be located within the City of Newark Council Ward One as depicted on the attached map entitled Project Area Map – Ward 1.PDF
| 12/01/2022 03:00 PM UTC |
2022-2 City of Newark Thornwood & Faye Drive Booster Pump Stations Project
This Project includes replacement of the existing Thornwood Booster Pump Station located at the intersection of River Road and Thornwood Drive, construction of a new Faye Drive Booster Pump Station at the intersection of Thornwood and Faye Drives, replacement of approximately 2300 LF of 12” watermain along River Road and Thornwood Drive, electrical, instrumentation and controls, and miscellaneous sitework.
| 08/10/2022 04:00 PM UTC |
2022-01; Newark Street Resurfacing Project
This project consists of: pavement planing, asphalt resurfacing, full depth pavement replacement, and associated pavement striping.
| 07/18/2022 04:00 PM UTC |