City of Newark, Ohio
40 West Main Street, Newark, OH 43055
(740) 670-7727
40 West Main Street, Newark, OH 43055
(740) 670-7727
Name * | Description | |
---|---|---|
NewarkStandardConstructionDrawings_July2018.pdf (1.16 MB) | ||
Number | Deadline |
---|---|
Number | Deadline |
---|---|
2022-29; South 11th Street Improvements
This project consists of improvements to approximately 1,000 feet of roadway; including widening for a turn lane and parking areas, as well new sidewalks and minor storm work.
| 12/15/2022 05:00 PM UTC |
2022-3 City of Newark Lead Water Service Replacement #2
This Project includes 200 lead and/or galvanized water service lines to be replaced. The work will be located within the City of Newark Council Ward One as depicted on the attached map entitled Project Area Map – Ward 1.PDF
| 12/01/2022 03:00 PM UTC |
2022-2 City of Newark Thornwood & Faye Drive Booster Pump Stations Project
This Project includes replacement of the existing Thornwood Booster Pump Station located at the intersection of River Road and Thornwood Drive, construction of a new Faye Drive Booster Pump Station at the intersection of Thornwood and Faye Drives, replacement of approximately 2300 LF of 12” watermain along River Road and Thornwood Drive, electrical, instrumentation and controls, and miscellaneous sitework.
| 08/10/2022 04:00 PM UTC |
2022-01; Newark Street Resurfacing Project
This project consists of: pavement planing, asphalt resurfacing, full depth pavement replacement, and associated pavement striping.
| 07/18/2022 04:00 PM UTC |
2022-1 - City of Newark Lead Water Service Line Replacement
This Project includes 400 lead water service lines to be replaced in multiple contracts consisting of 100 or 200 individual services. The work will be located within the City of Newark Council Ward One as depicted on the attached map entitled Project Area Map – Ward 1.PDF
| 07/14/2022 02:00 PM UTC |
Newark OH - Chemicals - 2022
This is for the PURCHASE of Water/Wastewater Treatment CHEMICALS only.
| 03/04/2022 05:00 PM UTC |
Newark OH - Street Materials - 2022
This is for the PURCHASE of Street MATERIALS only.
| 03/04/2022 05:00 PM UTC |
2021-27; Soldier Pile and Lagging Wall
This project consists of the construction of a soldier pile and timber lagging wall, including all related grading and site work described within the plans.
| 02/16/2022 05:00 PM UTC |
2017-14-4B; Lighting
This project consists of the purchase of streetscape materials, as specified.
| 12/15/2021 05:00 PM UTC |
2017-14-1A; Brick Pavers - ADA
This project consists of the purchase of streetscape materials, as specified.
| 12/15/2021 05:00 PM UTC |