General Info

Business Logo

Town of South Windsor, CT

1540 Sullivan Ave, South Windsor, CT 06074
(860) 644-2511 x245


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
South Windsor Sidewalk Connectivity, Project L132-0005
In general, this project includes construction of 20,320 square feet of concrete sidewalks, and concrete ramps, installation of new drainage structures and pipe, a precast modular retaining wall, removal and replacement of pavement markings, reconstruction of driveway aprons, as well as topsoil and turf establishment and other associated work. 4 Locations: Ayers Rd, Nevers Rd, Buckland Rd, Foster St DBE/MBE/WBE %: Connecticut state law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. 4a-60g, as amended. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.
04/30/2025 06:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Dart Hill Road Reconstruction, Project No. L132-0006
Description: This project is for the reconstruction of Dart Hill Road from Niederwerfer Road to Newmarker Road (Vernon Town Line). It will include new drainage, improved alignments, new road base and pavement, and new sidewalks on the north side of the road. Location: Dart Hill Road From Niederwerfer Road to Newmarker Road (Vernon Town Line) Engineer's Estimate: $4,376,000 DBE/MBE/WBE %: Connecticut state law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. 4a-60g, as amended. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.
04/09/2025 03:00 PM UTC
Reconstruction of Governors Highway
Description: Reconstruction of Governors Highway between Main street and John Fitch Blvd (Route 5), approximately 3,200 linear feet of roadway.
05/23/2024 06:00 PM UTC
Eli Terry Elementary School - Safe Routes to School State Project No. 132-129
In general the work to be performed under this contract includes the construction of a new pedestrian bridge, new Portland cement concrete and bituminous concrete sidewalks, new ADA-compliant handicap ramps, topsoil and turf establishment, pavement markings, and installation of traffic control signs including radar speed signs and rectangular rapid flashing beacons.
04/03/2024 06:00 PM UTC
Reconstruction of Pleasant Valley Road Phase 2
Full depth reconstruction of approximately 4500 feet of Pleasant Valley Road. This includes installation of new drainage pipe, catch basins, manholes, and hydrodynamic separators, replacing or resetting manhole frames and covers, excavation and removal of the existing pavement and base material down to the subgrade as shown on the plans, installation of new processed aggregate base material, 2 lifts of new HMA pavement, bituminous curb, pavement markings and signs, repaving driveway aprons, cutting, filling, and grading roadside slopes, installing topsoil and grass seed on all disturbed roadside areas and installing concrete sidewalks and ramps.
01/31/2024 07:00 PM UTC
Pavement Restoration 2024
In general work to be performed under this contract shall be for roadway milling, pavement removal, curb removal, pavement patching, curbing replacement, placement of new bituminous concrete pavement, installing pavement markings, and restoring disturbed lawn areas.
01/30/2024 07:00 PM UTC
Miscellaneous Concrete Sidewalks 2024
In general the work to be performed under this contract is for the removal and replacement of damaged sidewalk slabs, constructing ADA sidewalk ramps, paving driveway aprons, and landscaping of disturbed areas.
01/25/2024 07:00 PM UTC
Reconstruction of Pleasant Valley Road Phase 1 & Replacement of Bridge over Podunk River
Replacement of the Pleasant Valley Road Bridge over the Podunk River (Bridge 04156) and Reconstruction of Pleasant Valley Road Phase 1
05/10/2023 06:00 PM UTC
Beelzebub Road Reconstruction 2022
Full depth reconstruction of approximately 4910 feet of Beelzebub Road. This includes installation of new drainage pipe, catch basins, manholes, and hydrodynamic separators, replacing or resetting manhole frames and covers, excavation and removal of the existing pavement and base material down to the subgrade as shown on the plans, installation of new processed aggregate base material, 2 lifts of new HMA pavement, bituminous curb, pavement markings and signs, repaving driveway aprons, cutting, fill and grading roadside slopes, installing topsoil and grass seed on all disturbed roadside areas and installing concrete sidewalks and ramps. Engineers Estimate is about $2,300,000
06/22/2022 06:00 PM UTC
Buckland Road Pavement Rehabilitation 2022
Description: Buckland Road Pavement Rehabilitation Location: Buckland Road, South Windsor, CT Engineer's Estimate: $1,450,000 DBE/MBE/WBE %: 0.0
05/04/2022 06:00 PM UTC
Replacement of Main Street Bridge over the Podunk River Bridge 04174
The Town proposes a complete replacement of the existing bridge with a 70-foot clear span, NEXT Type 40D Beam superstructure supported by integral abutments founded on deep H-Pile foundations and cantilevered U-type wingwalls. The replacement would also consist of removing the existing stone masonry abutments and wingwalls to elevation 16.5’ +/-, which is above the ordinary high-water line at the site. Rounded stone riprap will be installed on the newly graded embankments. It is anticipated all construction work will be contained within the existing roadway fill embankments. A water main under the bridge will be removed and replaced as part of this project. The project would also consist of reconstructing approximately 195 feet of roadway and installing new guide rail at all approaches. No drainage structures are proposed and the embankments will be graded to allow stormwater to sheet flow to the adjacent wetlands.
10/28/2021 06:00 PM UTC
1 - 10 of 11 Solicitations
← Previous 1