General Info

Business Logo

City of Wilmington, OH

69 N South St, Wilmington, OH 45177-2211
(937) 382-6509


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2025-003 2025 Residential Paving Program
Project: 2025 Residential Paving Program Contract ID: 2025-003 Planning Engineer: Goodhue Consulting Location: Wilmington, OH Project Deadline: November 30, 2025 Overview: The proposed project includes resurfacing six residential streets totaling 4,765 feet, 6,320 feet of the Luther E. Warren multi-use path, and full-depth pavement patches through the City. The roadways to be resurfaced are: Fairland Avenue, Louise Street, Kathryn Drive, Hiatt Avenue, Kelly Drive, and Jenny Lane.
04/16/2025 04:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
2023-007
Project: REMOVAL AND APPLICATION TO FARMLAND OF SLUDGE FROM THE WILMINGTON WATER PLANT LIME STORAGE FACILITY (LAGOON #1) 2023 Contract ID: 2023-007 Location: Water Treatment Plant, 1142 Prairie Avenue Project Deadline: 120 DAYS
08/17/2023 04:00 PM UTC
2023-006 Davids Drive Phase II
Project: DAVIDS DRIVE PHASE II Project ID: 2023-006 Owners: CITY OF WILMINGTON Planning Engineer: Paul Goodhue, PE, PTOE Goodhue Consulting Design Engineer: Matt Cornett, P.E., PTOE EL Robinson Engineer's Estimate: $2,492,221.43 Location: Davids Drive, Wilmington, Clinton County, OH Project Deadline: November 30, 2023 Overview: 0.7 miles of full depth pavement reconstruction, curb and gutter replacement, drainage improvements, signage, and pavement markings.
06/23/2023 04:30 PM UTC
2023-005 Peterson Place Sewer Replacement
Project: PETERSON PLACE SEWER REPLACEMENT Contract ID: 2023-005 Planning Engineer: Paul Goodhue, P.E., PTOE Design Engineer: Fishbeck Location: Peterson Place, Wilmington OH Project Deadline: Within 180 days of contract commencement Optional Pre-Bid Meeting: Fri, June 9, 2023 @ 12:00 p.m. - On site. Meet at trail entrance in rear parking lot of Clinton Memorial Hospital. Overview: The proposed project includes installing approximately 1,200 linear feet of 8" PVC sanitary sewer, a few laterals, and five manholes through woods and parking lot.
06/23/2023 04:00 PM UTC
CLI WILMINGTON CROSSINGS FY23 2023-003
PROJECT: CLI WILMINGTON CROSSING FY23 CONTRACT ID: 2023-003 ODOT PID: 117146 PLANNING ENGINEER: Goodhue Consulting, LLC DESIGN ENGINEER: LJB LOCATION: City of Wilmington - Various Locations PROJECT DEADLINE: November 15, 2023 OPTIONAL PRE-BID MEETING: NONE OVERVIEW: The CLI WILMINGTON CROSSINGS FY23 project is comprised of construction of seven pedestrian crosswalk improvements throughout the City of Wilmington. The project includes improved signage and markings, ADA-compliant upgrades, sidewalks, and traffic calming measures. The locations are: Truesdell Street at Holmes Elementary School and Piedmont Street, Locust Street mid-block crossing at City Municipal Building, N. South Street Mid-block crossing north of Birdsall Street, Nelson Avenue at Luther E Warren Peace Path Trail, S. South Street mid-block crossing south of Sugartree Street, Mulberry Street at Luther E. Warren Peace Path Trail, and Thorne Avenue midblock crossing at Wilmington High School Athletic Complex.
06/02/2023 04:00 PM UTC
2023-004 WILMINGTON PARKS TO DAVIDS DRIVE PATH CONNECTOR
Project: WILMINGTON PARKS TO DAVIDS DRIVE PATH CONNECTOR Contract ID: 2023-004 Planning Engineer: Paul Goodhue, P.E., PTOE Location: Lynne Lane, Wilmington OH Project Deadline: July 28, 2023 Overview: The WILMINGTON PARKS TO DAVIDS DRIVE PATH CONNECTOR consists of constructing 5,750 linear feet of multi-use path along Lynne Lane from Davids Drive to J.W. Denver Williams Jr. Memorial Park.
05/26/2023 04:00 PM UTC
2023-001 LANDFILL PHASE 8 EXPANSION
Project: LANDFILL PHASE 8 EXPANSION Contract ID: 2023-001 Planning Engineer: Terracon Consultants, Inc. - Mo Finy Location: 397 S. Nelson Ave. Wilmington, OH 45177 Project Deadline: July 28, 2023 MANDATORY Pre-Bid Meeting: Tuesday, Feb 14, 2023 @ 10:00 a.m. - On site Overview: The proposed project includes construction of perimeter and interphase separation berms and composite liner system. Scope of work includes but is not limited to: Construction of North Sediment Trap Excavation of soil material from Phase 8 Cell Extension of underdrain systems Construction of structural fill perimeter and interphase berms Construction of a three-foot thick recompacted soil liner Installation of 60 mil textured HDPE geomembrane liner Installation of one-foot thick leachate collection layer Installation of geotextile over leachate collection layer
03/17/2023 07:00 PM UTC
2023-002 ELIZABETH LANE AND ROMBACH TRAFFIC SIGNAL CONSTRUCTION
Project: ELIZABETH AND ROMBACH TRAFFIC SIGNAL CONSTRUCTION Contract ID: 2023-002 Planning Engineer: Paul Goodhue, P.E., PTOE Location: Elizabeth Lane and Rombach Ave Intersection Project Deadline: June 30, 2023 Optional Pre-Bid Meeting: February 24, 2023 at 12:00 p.m. at project site. Overview: The proposed project includes constructing a new mast arm traffic signal complete and in-place at the intersection of Rombach Avenue and Elizabeth Lane in Wilmington, Ohio. The work also includes adjusting and replacing pavement markings, signage, and constructing two (2) new ADA compliant curb ramps.
03/06/2023 05:00 PM UTC
2022-007 RFQ PFAS
Project: RFQ STUDY OF SOURCE WATER OPTIONS AND TREATMENT FEASIBILITY DUE TO PFAS DETECTIONS AND EXPECTED REGULATION Contract ID: 2022-007 Overview: The City of Wilmington is seeking qualified consultants to perform a study of source water options and treatment feasibility due to PFAS detections and expected regulation.
10/28/2022 04:00 PM UTC
2022-004 CEMETERY BRIDGE EAST
Project: CEMETERY BRIDGE EAST Contract ID: 2022-004 Planning Engineer: Paul Goodhue, P.E., PTOE Location: Sugar Grove Cemetery Project Deadline: June 30, 2023 Optional Pre-Bid Meeting: Thurs, Sept 29, 2022 @ 2:30 p.m. - On site Overview: This is a design-build project. The proposed project includes construction to replace the existing deteriorating concrete arch bridge on the same general alignment of the existing bridge in Sugar Grove Cemetery in Wilmington, Ohio. The Contractor is to be aware that this work is to be performed in an active cemetery. The contractor will coordinate daily with Sugar Grove Cemetery to determine if there are funerals scheduled for that day that are adjacent to the work-zone and will adjust the work schedule accordingly. Construction activities during funeral services adjacent to the work zone will not be permitted
10/27/2022 04:00 PM UTC
2022-006 WTP SLUDGE
Project: REMOVAL AND APPLICATION TO FARMLAND OF SLUDGE FROM THE WILMINGTON WATER PLANT LIME STORAGE FACILITY (LAGOONS) 2023-2024 Contract ID: 2022-006 Location: Water Treatment Plant, 1142 Prairie Avenue Project Deadline: One or two year contract
10/17/2022 04:30 PM UTC
11 - 20 of 26 Solicitations
2