City of Ravenna - Engineering
530 N Freedom St., Ravenna, OH 44266
(330) 296-5666
530 N Freedom St., Ravenna, OH 44266
(330) 296-5666
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Annual Paving - Contract 2023-A
The proposed work under this Contract consists of asphalt milling and paving, Brick paving and associated work items, asphalt and concrete base repairs, concrete roadway repairs, sidewalk replacement and associated work items. The estimated cost for this project is $786,000.00.
| 03/09/2023 04:00 PM UTC |
Painting of Pavement Markings and Striping - Contract 2022-G
Project Description: The proposed work under this contract consists of approximately 28 pass miles of pavement striping and various painted pavement markings throughout the whole city, including downtown striping. The estimated cost is $70,000.00.
| 07/26/2022 03:00 PM UTC |
Page and Scranton
The proposed work under this Contract consists of approximately 2130 lineal feet of 8”, 6” and 4” water line replacement with new valves, hydrants, and services. The project also includes 9500 square feet of sidewalk replacement. The estimated cost for this project is $647,651.
| 05/26/2022 03:00 PM UTC |
Rayanne Parkway Improvements - Contract 2022-F
Project Description: The proposed work under this Contract consists of construction of 1,100 feet of industrial roadway which ends in a cul-de-sac for the Chestnut Commerce Park. This work includes new storm sewer system, sidewalk and waterline extension. The estimated cost for this project is $1,085,043.42.
| 04/19/2022 03:00 PM UTC |
Asphalt Paving - Contract 2022-E
Project Description: The proposed work under this Contract consists of asphalt milling and paving, brick paver and associated work, asphalt and concrete base repairs, crack sealing, sidewalk replacement and associated work items. The estimated cost for this project is $705,160.05.
| 04/12/2022 03:00 PM UTC |
2022-D PID#112756
DBE%: 6%
Project Description: Improvement of 1.38 miles of Riddle Ave. and S Chestnut St. Asphalt milling and paving, chip seal interlayer, sidewalk replacement and associated work items. The estimated cost for this project is $582,000.
| 03/17/2022 03:00 PM UTC |