Rittman WWTP Improvements
The proposed work consists of improvements to the existing Rittman Wastewater Treatment Plant (WWTP) to replace failing treatment processes and equipment. This project includes the replacement of the inoperable grit collection system, including, but not limited to the grit pump and grit classifier along with associated piping and electrical improvements. A three-sided structure will be constructed around the raw sewage pumping station to protect operators from the elements. Above ground diffuser piping and diffusers are scheduled to be replaced in the equalization, grit, aeration, aerobic digester, sludge holding, flow distribution chamber, and chlorine contact tanks. As each tank is drained, concrete repairs will be completed, new motorized drain valves will be installed, and the tank floors will be grouted to drain properly. New blowers will be provided for the equalization tanks to isolate the diffuser system per Ten State Standards. In addition, the equalization basin overflow will be rerouted to the head of the treatment plant. New positive displacement aeration blowers will be installed to replace the existing centrifugal blowers which are beyond their useful life. The pumps and pump motors within the existing sludge pump building will be replaced with new pumps and motors with VFDs to more efficiently regulate flows. Both final clarifiers will have their internal components replaced, including, but not limited to, the center columns, rake arms, clarifiers bridges, skimmers, scum beaches, baffles, and weirs. The replacement of an existing 300 kW standby emergency generator with a new 1 MW standby emergency generator and transfer switch to provide all treatment processes with power during an electrical outage. For Health and Safety, the existing chlorination channels will be converted to ultraviolet (UV) disinfection channels along with enhanced post-aeration. The SCADA system will be expanded to allow functioning and monitoring of the plant processes from a single location. The existing septage receiving station will be converted to a City vacuum truck only receiving station. Additional architectural, electrical, and mechanical restoration of several structures is also included with this project. The construction of a tarp barn will allow the City to store materials on site. Additional site improvements include the modification of the plant entrance and resurfacing of Morning Star Drive.
| 08/13/2024 02:00 PM UTC |
Rittman Water Transmission Main
The proposed work consists of 15385 feet of watermain replacement, water services and fire hydrant installation along C.R. 504 and Township Hwy 59
| 03/21/2023 02:00 PM UTC |
City of Rittman, Ohio - WAY-CR0580-00.58
DBE GOAL %: 7%
Description of Job: The project consists of improvement of 3,262 linear feet (0.62 miles) of West Ohio Avenue (CR 580) from Metzger Avenue to Main Street by milling the asphalt surface, performing the necessary base and subgrade repairs and placing a new asphalt surface. Pavement markings, casting adjustments, and ADA curb ramps are also included.
| 01/26/2023 03:00 PM UTC |
City of Rittman, Ohio - WAY-CR 0150-0.00
DBE GOAL %: 6
Description of Job: Improvement of 1.25 miles of Eastern Road from Rufener Road to Gish Road by milling the existing asphalt surface, performing necessary base repairs, applying a new asphalt surface, and installing pavement markings.
Opinion of Probable Construction Cost: $440,000
| 03/29/2022 03:00 PM UTC |
City of Rittman, Ohio - WAY-CR 0057-02.62
DBE GOAL %: 6
Description of Job: The project consists of the improvement of 4,664 linear feet (0.88 miles) of South Main Street (CR 57) from Front Street to the City of Rittman southern corporation limit by milling the existing asphalt surface, performing the necessary base repairs, and installing a new asphalt surface. Pavement markings, casting adjustments, and ADA compliant curb ramps are also included.
Opinion of Probable Construction Cost: $365,000
| 03/18/2022 03:30 PM UTC |
City of Rittman, Ohio - WAY-CR 0057-03.91
DBE GOAL %: 6
Description of Job: The projects consists of the improvement of 5,568' linear feet (1.05 miles) of East Ohio Avenue (CR 57) from Main Street to East Sunset Drive by milling the asphalt surface, performing the necessary base and subgrade repairs, and placing a new asphalt surface. Pavement markings, casting adjustments, and ADA curb ramps are also included.
Opinion of Probable Construction Cost: $535,000
| 03/18/2022 03:00 PM UTC |
6 Solicitations
|