General Info

Business Logo

Notifications are free for this business.

Road Commission for Oakland County

31001 Lahser Road, Beverly Hills, MI 48025
(248) 645-2000

The Road Commission for Oakland County (RCOC) maintains more than 2,700 miles of roads. This is the second largest road system in Michigan, second only to the state highway system.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
54701/54712/54721/54731/54911/54921
2020 INDEPENDENCE TOWNSHIP PREVENTATIVE MAINTENANCE - A CONTRACT FOR PREVENTATIVE MAINTENANCE OF VARIOUS ROADS IN INDEPENDENCE TOWNSHIP INCLUDING COLD MILLING PAVEMENT WITH MULTIPLE COURSE OVERLAYS, REMOVE AND REPLACE PAVEMENT, CRUSH AND SHAPE HMA PAVEMENT, CURB AND GUTTER REPAIRS, GUARDRAIL, ADA RAMPS, HIGH FRICTION SURFACE TREATMENT, SIGNAL WORK, AND MINOR DRAINAGE IMPROVEMENTS. LOCATED IN INDEPENDENCE TOWNSHIP, OAKLAND COUNTY, MICHIGAN.
09/24/2019 03:00 PM UTC
902019-2
A contract for the removal and replacement of LED traffic signal modules, LED pedestrian signal heads and traffic signal case signs, at various locations in Oakland County, Michigan.
08/27/2019 03:00 PM UTC
55092
A CONTRACT FOR MISCELLANEOUS PAVEMENT REPAIRS WITH ROUTING, CLEANING AND SEALING OF RANDOM CRACKS IN HMA SURFACE WITH MINOR DRAINAGE IMPROVEMENTS.
07/23/2019 03:00 PM UTC
2019996
A CONTRACT FOR APPROXIMATELY 450 TONS OF HMA MODIFIED HAND PATCHING IN VARIOUS SUBDIVISIONS LOCATED IN VARIOUS DISTRICTS THROUGHOUT, OAKLAND COUNTY, MICHIGAN.
07/16/2019 03:00 PM UTC
54563
COOLEY LAKE ROAD OVER TEEPLE CREEK CULVERT REPLACEMENT - A CONTRACT FOR REMOVAL OF EXISTING ELLIPTICAL CMP CULVERT AND REPLACEMENT WITH AN ELLIPTICAL CONCRETE CULVERT, ASSOCIATED PAVEMENT REMOVAL, HMA PAVING, GUARDRAIL REMOVAL AND INSTALLATION LOCATED IN COMMERCE TOWNSHIP AND WHITE LAKE TOWNSHIP, OAKLAND COUNTY, MICHIGAN.
07/02/2019 03:00 PM UTC
54573
WISE ROAD OVER HURON RIVER CULVERT REPLACEMENT - A CONTRACT FOR REMOVAL OF EXISTING ELLIPTICAL CMP CULVERT AND REPLACEMENT WITH AN ELLIPTICAL CONCRETE CULVERT, ASSOCIATED PAVEMENT REMOVAL, HMA PAVING, GUARDRAIL REMOVAL AND INSTALLATION LOCATED IN COMMERCE TOWNSHIP, OAKLAND COUNTY, MI
07/02/2019 03:00 PM UTC
25062
Colony Heights 4" HMA SURFACE WITH COLD MILLING HMA FULL DEPTH REMOVAL OVER EXISTING AGGREGATE BASE WITH SPOT CURB AND GUTTER REMOVAL/REPLACEMENT, SODDED SHOULDERS AND MINOR DRAINAGE IMPROVEMENTS.
06/25/2019 03:00 PM UTC
53833
HAGGERTY ROAD OVER SEELEY STREAM CULVERT REPLACEMENT - A CONTRACT FOR THE REMOVAL OF A 95 INCH X 67 INCH ARCH CORRUGATED METAL PIPE CULVERT AND REPLACE WITH A 95 INCH X 67 INCH CORRUGATED METAL PIPE CULVERT, HMA PAVING, GUARDRAIL INSTALLATION AND OTHER ASSOCIATED ITEMS OF WORK LOCATED ON HAGGERTY ROAD, CITIES OF NOVI AND FARMINGTON HILLS, OAKLAND COUNTY, MICHIGAN.
06/25/2019 03:00 PM UTC
2019996
A CONTRACT FOR APPROXIMATELY 450 TONS OF HMA MODIFIED HAND PATCHING IN VARIOUS SUBDIVISIONS LOCATED IN VARIOUS DISTRICTS THROUGHOUT, OAKLAND COUNTY, MICHIGAN.
06/18/2019 03:00 PM UTC
54741/54751
OAKLEY PARK ROAD, WILLIAMS LAKE ROAD HIGH FRICTION SURFACE TREATMENT - 0.19 MILES OF HIGH FRICTION SURFACE TREATMENT, AND PAVEMENT MARKINGS LOCATED IN COMMERCE TOWNSHIP AND WATERFORD TOWNSHIP, OAKLAND COUNTY, MICHIGAN
06/11/2019 03:00 PM UTC
131 - 140 of 361 Solicitations
1 2 10 11 12 14 16 17 18 36 37