General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 145-1-2013
COMBINED SEWER MAIN RELAY AND LINING AND MANHOLE LINING AND REPAIR IN VARIOUS LOCATIONS
11/20/2013 04:30 PM UTC
OFFICIAL NOTICE 145-2-2013
COMBINED SEWER MAIN LINING AND MANHOLE LINING AND REPAIR IN VARIOUS LOCATIONS
11/20/2013 04:30 PM UTC
OFFICIAL NOTICE 124-2-2013
PROJECT NO. 2: CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211131127) S. Pearl Street – W. Mitchell Street to S. Cesar E. Chavez Dr (Incl. W. Bow St. – S. Cesar E. Chavez Dr. to S. Pearl St. and Inters. Mod @ S. 19th St)
11/19/2013 04:30 PM UTC
OFFICIAL NOTICE 124-1-2013
PROJECT NO. 1: CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211130127) S. Pearl Street – W. Mitchell Street to S. Cesar E. Chavez Dr (Incl. W. Bow St. – S. Cesar E. Chavez Dr. to S. Pearl St. and Inters. Mod @ S. 19th St)
11/19/2013 04:30 PM UTC
OFFICIAL NOTICE 122-1-2013
PROJECT NO. 1: CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211130128) S. 18th St. – W. Burnham St. to S. Pearl St.
11/18/2013 04:30 PM UTC
OFFICIAL NOTICE 122-2-2013
PROJECT NO. 2: CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211131128) S. 18th St. – W. Burnham St. to S. Pearl St.
11/18/2013 04:30 PM UTC
OFFICIAL NOTICE 154-1-2013
CHEMICAL ROOT REMOVAL IN SANITARY AND COMBINED SEWERS
11/11/2013 04:30 PM UTC
OFFICIAL NOTICE 148-1-2013
SIDEWALK SNOW/ICE REMOVAL ON CITY-OWNED PROPERTIES
10/28/2013 03:30 PM UTC
OFFICIAL NOTICE 147-1-2013
STORM SEWER INSTALLATION IN N 32ND ST - W AUER AVE TO 590' N OF W AUER AVE AND N 33RD ST - W AUER AVE TO 575' N OF W AUER AVE
10/25/2013 03:30 PM UTC
OFFICIAL NOTICE 119-1-2013
PROJECT NO. 1: CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211130125) S. 26th St. – W. Scott St. to W. Pierce St.
10/21/2013 03:30 PM UTC
1531 - 1540 of 1604 Solicitations
1 2 150 151 152 154 156 157 158 159 160 161