General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 82-1-2020
SAFETY ACADEMY ROOF REPLACEMENT 6680 N. TEUTONIA AVENUE MILWAUKEE, WI 53209
09/04/2020 03:30 PM UTC
OFFICIAL NOTICE 69-1-2020
Crackfill asphalt and concrete street pavements with a hot-applied asphalt based product used to seal and fill cracks and joints. Additional work involving the filling of small holes, joint failures, exposure of wire mesh and other minor surface defects using hot-applied asphalt based product and pea gravel will be required on all pavements. ETC.; Located at: ST211180169 - Various Street Locations within the City of Milwaukee
09/03/2020 03:30 PM UTC
OFFICIAL NOTICE 87-1-2020
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, ETC.; Construct asphalt speed humps at these locations: (ST211190202) – N. 9th St. – W. Hadley St. to W. Locust St. (1 speed hump) (ST211190166) – S. 12th St. – W. Harrison Ave. to W. Hayes Ave.(2 speed humps) (ST211190190) – N. 13th St. - W. Capitol Dr. to W. Fiebrantz Ave.(1 speed hump) (ST211110153) – N. 15th St. – W. Lloyd St. to W. North Ave. (2 speed humps) (ST211190169) – S. 17th St. – W. Windlake Ave. to W. Lincoln Ave.(2 speed humps) (ST211190175) – N. 19th Pl. – W. Courtland Ave. to W. Hampton Ave.(1 speed hump) (ST211180260) – N. 24th Pl. – W. Vienna Ave. to W. Melvina St. (1 speed hump) (ST211190195) – N. 45th St. – W. Fiebrantz Ave. to W. Hope Ave.(1 speed hump) (ST211190180) – N. 45th St. – W. Congress St. to W. Glendale Ave.(3 speed humps) (ST211200115) – N. 49th St. – W. Marion St. to W. Congress St. (1 speed hump) (ST211200106) – N. 72nd St. – W. Courtland Ave. to W. Hampton Ave.(1 speed hump) (ST211180245) – N. 72nd St. – W. Hampton Ave. to W. Stark St. (1 speed hump) (ST211180244) – N. 73rd St. – W. Marion St. to W. Congress St. (1 speed hump) (ST211180267) – N. Buffum St. – E. Locust St. to E. Chambers St.(1 speed hump) (ST211190183) – W. Cherry St. – N. 23rd St. to N. 24th St. (1 speed hump) (ST211190164) – W. Grant St. - S. 17th St. to S. 19th St. (2 speed humps) (ST211180291) – N. Hopkins St. – W. Sheridan Ave. to W. Silver Spring Dr.(1 speed hump) (ST211190185) – W. Leon Tr. – W. Hoyt Pl. to N. 48th St. (1 speed hump) (ST211190186) – W. Purdue St. – N. 19th Pl. to N. 20th St. (1 speed hump) (ST211190188) – W. Thurston Ave. – N. 32nd St. to N. 33rd St. (1 speed hump)
09/01/2020 03:30 PM UTC
Official Notice 91-1-2020
PAVEMENT REPAIRS IN THE CITY OF MILWAUKEE NORTHWEST GARAGE WEST PARKING AREA 3025 W RUBY AVE MILWAUKEE WI 53213
08/24/2020 03:30 PM UTC
OFFICIAL NOTICE 57-1-2020
WATER MAIN RELAYS WITH LEAD SERVICE LINE REPLACEMENTS at the following locations: N. 33rd St. (WT410160680), W. Hadley St. to W. Locust St. (26 working days); W. Atkinson Ave. (WT410160690), 140' NW/O N Teutonia Ave. to W. Roosevelt Dr. (29 working days); W. Olive St. (WT410160691), N. 22nd St. to W. Roosevelt Dr. (33 working days); E. Locust St. (WT410160705), N. Palmer St. to N. 1st St. (13 working days); N. Palmer St. (WT410160707), E. Hadley St. to E. Locust St. (29 working days); N. Newhall St. (WT410190600), E. Locust St. to E. Linnwood Ave. (26 working days); N. 26th St. (WT410200673), W. Ruby Ave. to W. Glendale Ave. (31 working days); N. 22nd St. (WT410200689), W. Ruby Ave. to W. Cornell St. (31 working days). (Note: Contractor to furnish and install approximately 5,927 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/20/2020 03:30 PM UTC
OFFICIAL NOTICE 85-1-2020
WATER MAIN RELAYS, at the following locations: N. 24th St. (WT410200605), W. Rohr Ave. to W. Custer Ave. (14 working days); W. Rohr Ave. (WT410200606), 300' E/O N. 24th St. to N. 24th St. (9 working days); W. Florist Ave. (S/S) (WT410200633), N. 65th St. to N. 76th St. (101 working days); N. 71st St. (WT410200634), W. Bobolink Ave. to W. Florist Ave. (17 working days); N. 72nd St. (WT410200635), W. Bobolink Ave. to W. Florist Ave. (18 working days); N. 73rd St. (WT410200636), W. Bobolink Ave. to W. Florist Ave. (16 working days); W. Bobolink Ave. (WT410200637), N. 68th St. to N. 70th St. (15 working days); E. Kenwood Blvd. (WT410200643), N. Lake Dr. to 950' E/O N Lake Dr. (23 working days). (Note: Contractor to furnish and install approximately 8,394 lin. ft. of 16", 12", 8", 6", 4" and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/20/2020 03:30 PM UTC
OFFICIAL NOTICE 79-1-2020
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS CRUSHED STONE BASE, CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211190137 – In North 23rd Street from West Center Street to West Locust Street
08/19/2020 03:30 PM UTC
Official Notice 28-1-2020
Milwaukee Police Department Third District Data Communications Server Room Cooling Modifications 2333 North 49th Street Milwaukee WI 53210
08/18/2020 03:30 PM UTC
OFFICIAL NOTICE 64-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, VARIABLE THICKNESS CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST230200161 – Area Wide Bounded By: West State Street, State Truck Highway – 175, West Vliet Street, and West Highland Boulevard
08/17/2020 03:30 PM UTC
OFFICIAL NOTICE 75-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 8” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 8” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST210020103 – In West Good Hope Road from North 60th Street to North 76th Street (Southside of West Good Hope Road only)
08/13/2020 03:30 PM UTC
601 - 610 of 1553 Solicitations
1 2 57 58 59 61 63 64 65 155 156