General Info

Business Logo

Solicitations and notifications are free for this business.

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
STC2202 Glass & Glazing Trade RFB
Springfield Technical Community College – School of Health and Patient Simulation (SHPS) Modernization, Springfield, MA. Trade Bid for the following Trade Category: Glass & Glazing.
07/17/2026 04:00 PM UTC
MMP 42
Mechanical and Plumbing Preventive Maintenance Contract, Springfield Data Center, Springfield, MA. Includes all Mechanical and Plumbing Equipment specified in the Bid Documents. Includes testing, inspection, preventive maintenance (including all PM required parts and materials), repairs, requested emergency services and incidental extra services for all mechanical and plumbing equipment. Must be licensed as a Mechanical, Refrigeration and Plumbing Contractor in Massachusetts and meet the qualifications specified in the Bid Documents. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
07/22/2026 06:00 PM UTC
SDE1902 Trade RFQ
Request for Qualifications for (2) Two Trade Contractors: Acoustical Tile ($133,176) & Elevators 2nd Request ($256,000) for SDE - Middleton Jail and HOC - Medical & Kitchen Building/ISB Replacement (Phase 2), Middleton, MA. The Construction Manager is Commodore Builders Corporation.
07/23/2026 04:00 PM UTC
MIL2201 Trade RFQ
Request for Qualifications for Thirteen (13) Trade Contractor Packages: Masonry ($2,368,500); Miscellaneous & Ornamental Iron ($229,800); Waterproofing, Dampproofing and Caulking ($231,500); Roofing & Flashing ($1,983,000); Glass & Glazing ($32,500); Tile ($101,500); Acoustical Tile ($226,500); Resilient Floors ($289,500); Painting ($273,600); Fire Protection Sprinkler System ($865,500); Plumbing ($1,038,500); HVAC ($3,244,000); Electrical ($6,816,000), for MIL – Camp Edwards – New Readiness Center, Bourne, MA. The Construction Manager is W.T. Rich Co., Inc.
07/27/2026 04:00 PM UTC
DCP2524 Sub Bids
DCP - Monson State Hospital Multiple Building Demolition – Phase 2 – Monson, MA, The project work consists of the abatement and demolition of fourteen (14) buildings on the campus of Monson State Hospital located in Monson, MA. Two of which are interconnected buildings designated as combined building numbers 22 & 23. All fourteen (14) buildings identified for demolition in the drawings shall either be traditionally abated of hazardous materials, demolished, and removed from the site, or removed from the site as bulk waste under Non-Traditional Work Plans (NTWP) to meet all requirements of the Contract Documents. The Category of Work is General Building Construction or Demolition. This Project includes the following Filed Sub-Bid: Masonry.
07/29/2026 04:00 PM UTC
SDP2301 Phase 2 Plumbing Re-Bid
Plumbing Re-Bid for: Plymouth County Sheriff Roof Replacement - Phase 2, Plymouth, MA. The project is the second phase roof replacement of the SDP Plymouth County Sheriff Department building. The areas to be reroofed comprise approximately 68,000 square feet out of the entire approximate 170,000 square foot roof. The new roof assembly will consist of vapor retarder, two layers of insulation (R-30 minimum), cover board, and PVC roof membrane. This Project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Plumbing; HVAC; Electrical. The Category of Work is Roofing. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
07/30/2026 04:00 PM UTC
TRC2204 Trade RFQ
Request for Qualifications for Three (3) Trade Contractor Packages for Masonry ($1,800,000); Waterproofing, Dampproofing and Caulking, ($590,000) and Elevators, ($802,000) for TRC – Framingham Justice Center, Framingham, MA. This Project is for a new 120,000 to 130,000 GSF courthouse to be located in downtown Framingham on the site of the former Danforth Museum. The building will provide modern facilities for the District Court, Juvenile Court, Housing Court and the Probate and Family Court. The Construction Manager is Dimeo Construction Company.
07/30/2026 04:00 PM UTC
SDP2301 Phase 2
Plymouth County Sheriff Roof Replacement - Phase 2, Plymouth, MA. The project is the second phase roof replacement of the SDP Plymouth County Sheriff Department building. The areas to be reroofed comprise approximately 68,000 square feet out of the entire approximate 170,000 square foot roof. The new roof assembly will consist of vapor retarder, two layers of insulation (R-30 minimum), cover board, and PVC roof membrane. This Project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Plumbing; HVAC; Electrical. The Category of Work is Roofing. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
08/10/2026 06:00 PM UTC
DCP2524
DCP - Monson State Hospital Multiple Building Demolition – Phase 2 – Monson, MA. The project work consists of the abatement and demolition of fourteen (14) buildings on the campus of Monson State Hospital located in Monson, MA. Two of which are interconnected buildings designated as combined building numbers 22 & 23. All fourteen (14) buildings identified for demolition in the drawings shall either be traditionally abated of hazardous materials, demolished, and removed from the site, or removed from the site as bulk waste under Non-Traditional Work Plans (NTWP) to meet all requirements of the Contract Documents. The Category of Work is General Building Construction or Demolition. This Project includes the following Filed Sub-Bid: Masonry.
08/11/2026 06:00 PM UTC
DOC2503
DOC – DOC Headquarters – Roof Replacement, 50 Maple Street, Milford, MA. The Project work consists of replacement of the roof assembly at the Department of Correction Headquarters. Work includes removal of existing ballasted EPDM roof assembly and replacement with EPDM membrane or thermoplastic membrane for the office tower, warehouse and connector totaling approximately 164,000 square feet. The Category of Work is Roofing.
08/18/2026 06:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
MMA2201 Trade RFB
MMA - Science, Technology and Engineering Lab Modernization, Buzzards Bay, MA, for the following Trade Categories: Masonry; Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Tile; Acoustical Tile; Resilient Floors; Painting; Fire Protection; Plumbing. Glass & Glazing; HVAC; Electrical are scheduled to bid on November 1, 2024 at 12:00 PM.
10/28/2024 04:00 PM UTC
BSD2201
Bristol Sheriff - Dartmouth - Roof Replacement, Phase 2, North Dartmouth, MA. This Project is for removal and replacement of roof systems and flashings, removal and reinstallation of existing roof mechanical equipment; lightning protection systems; selective demolition or interior ceiling finishes, and installation of new ceiling finishes or secured temporary ceiling finishes as needed. This project includes the following Filed Sub-Bids: Masonry; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Acoustical Tile; Painting; Plumbing; HVAC; Electrical. The Category of Work is General Building Construction. Please see the SSI Attachment: Security Acknowledgment Form. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
10/10/2024 06:00 PM UTC
TRC2204 CM RFP
Request for Proposals for Construction Management Services - TRC - Framingham Justice Center, Framingham, MA. Please note that Request for Proposal documents are available only to prequalified Construction Management firms, but a public component of this page has been created so a list of submitting firms may be viewed after the deadline.
10/04/2024 06:00 PM UTC
BSB2005
Request for Proposals - State House Chilled Water Plant Upgrades, Boston, MA. This Project is for updates to the building chilled water plant (base scope); upgrades to the chiller and condensing units serving the archives (Alternate 1); installation of change over valves (base scope). The Category of Work is HVAC. Pursuant to Massachusetts General Laws Chapter 149, Sections 44A and 44E1/2, as amended, the Commonwealth of Massachusetts, Division of Capital Asset Management and Maintenance requests Proposals from qualified firms for services to be performed on the Historic Massachusetts State House located on Beacon Hill in Boston, Massachusetts. Proposals must specifically identify certain of the subcontractors that the offeror proposes to use on this project as required by this Request for Proposals (RFP) and of those subcontractors identified must meet the experience requirements set forth in the RFP.
09/27/2024 06:00 PM UTC
BSD2201 Sub Bids
Bristol Sheriff - Dartmouth - Roof Replacement, Phase 2, North Dartmouth, MA. This Project is for removal and replacement of roof systems and flashings, removal and reinstallation of existing roof mechanical equipment; lightning protection systems; selective demolition or interior ceiling finishes, and installation of new ceiling finishes or secured temporary ceiling finishes as needed. This project includes the following Filed Sub-Bids: Masonry; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Acoustical Tile; Painting; Plumbing; HVAC; Electrical. The Category of Work is General Building Construction. Please see the SSI Attachment: Security Acknowledgment Form on the main bid page. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
09/27/2024 04:00 PM UTC
MIL2201 CM RFP
Request for Proposals for Construction Management Services, for MIL – Camp Edwards New Readiness Center, Bourne, MA. Please note that Request for Proposal documents are available only to prequalified Construction Management firms, but a public component of this page has been created so a list of submitting firms may be viewed after the deadline.
09/26/2024 06:00 PM UTC
DPH2108
Tewksbury Hospital Saunders Building Fire Alarm, Tewksbury, MA. This Project is to replace the existing fire alarm system, consisting of installation of a new fire alarm system, removal of all existing fire alarm wiring and devices, coring, cutting & patching, two-hour rated partitions with door, ACT ceiling, painting, flooring and other finishes, HVAC, and electrical work. The Category of Work is Alarm Systems. This Project includes the following Filed Sub-Bids: Acoustical Tile; Painting; Fire Protection; Electrical.
09/25/2024 06:00 PM UTC
MMP 13
Electrical Equipment Preventive Maintenance Contract for the Surplus Property Maintenance Building, Northborough, MA. This Project is to provide a Preventive Maintenance Service Contract to include testing, inspection, preventive maintenance, repairs and requested emergency services and incidental extra services for all Electrical Equipment. This Project bid in accordance with M.G.L. Chapter 30 Section 39M Sitework Only Projects and Building Projects $50,000 to $150,000.
09/24/2024 06:00 PM UTC
MMP 12
Mechanical Equipment Preventive Maintenance Contract for the Surplus Property Maintenance Building, Northborough, MA. This project is to provide a Preventive Maintenance Service Contract to include testing, inspection, preventive maintenance, repairs and requested emergency services and incidental extra services for all Mechanical Equipment and Plumbing Equipment. This Project bid in accordance with M.G.L. Chapter 30 Section 39M. This Project bid in accordance with M.G.L. Chapter 30 Section 39M Sitework Only Projects and Building Projects $50,000 to $150,000.
09/23/2024 06:00 PM UTC
DPH2108 Acoustical Tile Re Bid
Tewksbury Hospital Saunders Building Fire Alarm, Tewksbury, MA. This Project is to replace the existing fire alarm system, consisting of installation of a new fire alarm system, removal of all existing fire alarm wiring and devices, coring, cutting & patching, two-hour rated partitions with door, ACT ceiling, painting, flooring and other finishes, HVAC, and electrical work. The Category of Work is Alarm Systems. This Project includes the following Filed Sub-Bids: Acoustical Tile; Painting; Fire Protection; Electrical.
09/10/2024 04:00 PM UTC
121 - 130 of 452 Solicitations
1 2 9 10 11 13 15 16 17 45 46